Home India Ministry of Jal Shakti DESILTING OF WATER BODIES...
Date: 2025-07-24 Category: Not Applicable State: Union Government Country: India

DESILTING OF WATER BODIES

Issued by Ministry of Jal Shakti · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Policy Summary: Desilting and Rehabilitation of Water Resources** The Government of India is addressing water resource management through two key initiatives: the Pradhan Mantri Krishi Sinchayee Yojna (PMKSY) with "Har Khet Ko Pani" (HKKP) component and the Dam Rehabilitation and Improvement Program (DRIP). Under the PMKSY-HKKP, the Repair, Renovation, and Restoration (RRR) of Water Bodies scheme receives central assistance for works including desilting, conveyance system repairs, bund strengthening, weir and sluice repairs, catchment treatment, command area development, and soil erosion prevention. From FY 2016-17 up to March 31, 2025, the government released ₹545.35 crore, restoring an irrigation potential of 1.20 lakh hectares and reviving 191 million cubic meters (MCM) of water storage capacity. State-wise details for central assistance released, irrigation potential restored, and storage revival are available. The Dam Rehabilitation and Improvement Program (DRIP) Phase II & III, co-financed by the World Bank and the Asian Infrastructure Investment Bank (AIIB), focuses on improving dam safety and efficiency through rehabilitation, emergency plans, and capacity building. While DRIP does not have dedicated desilting funds, need-based desiltation of selected dams is considered. The scheme includes 19 States and 3 Central Agencies. The project's completion date is March 2031. The approved fund allocation for Phase II and III totals ₹5107 crore and ₹5104 crore respectively. Benefits include improved dam safety, operational performance, and institutional strengthening. Minister of State for Jal Shakti Shri Raj Bhushan Choudhary provided this information in a written reply to a question in Lok Sabha. (MAMSMP Lok Sabha US Q909)

Key Entities Referenced

Ministry of Jal Shakti: The Indian government ministry responsible for water resources. Pradhan Mantri Krishi Sinchayee Yojna: An Indian government scheme focused on improving irrigation efficiency and water management. Har Khet Ko Pani: A component of the Pradhan Mantri Krishi Sinchayee Yojna focused on providing water to every farm. Repair, Renovation and Restoration of Water Bodies: A scheme incorporated as part of PMKSYHKKP focusing on the repair and restoration of water bodies. Dam Rehabilitation and Improvement Program DRIP Phase II III: An externally funded scheme aimed at improving dam safety and efficiency. World Bank: One of the co-financiers of the Dam Rehabilitation and Improvement Program DRIP Phase II III. Asian Infrastructure Investment Bank: One of the co-financiers of the Dam Rehabilitation and Improvement Program DRIP Phase II III. Lok Sabha: The lower house of the Parliament of India, where a question related to the information was answered.
Official Source Record View Original Source →
See Full Document Text
Ministry of Jal Shakti DESILTING OF WATER BODIES Posted On: 24 JUL 2025 5:20PM by PIB Delhi The Government of India is implementing the Pradhan Mantri Krishi Sinchayee Yojna (PMKSY) with Har Khet Ko Pani (HKKP) as one of its components and the Repair, Renovation and Restoration (RRR) of Water Bodies schemes have been incorporated as part of PMKSY-HKKP. Works related to desilting of water bodies, repairing conveyance systems, strengthening bunds, repairing weirs and sluices, catchment treatment, command area development, and soil erosion prevention are being considered for central assistance under RRR of Water Bodies component of PMKSY-HKKP. The Government of India has released Rs. 545.35 crore as central assistance to various States under the Repair, Renovation, and Restoration (RRR) of Water Bodies scheme, a component of the Pradhan Mantri Krishi Sinchayee Yojana – Har Khet Ko Pani (PMKSY-HKKP), from the financial year 2016–17 up to 31st March 2025. As a result, an irrigation potential of 1.20 lakh hectares has been restored, and 191 million cubic meters (MCM) of water storage capacity has been revived as of March 2025. State-wise details are provided in below. The Government of India is also implementing externally funded Scheme Dam Rehabilitation and Improvement Program (DRIP) Phase II &III which aims to improve dam safety and efficiency. It includes rehabilitation, emergency plans, and capacity-building. Under the scheme, there is no dedicated fund allocation for de-silting, however, provision for carrying out need based de-siltation of selected dams exists. The Scheme has provision of onboarding nineteen (19) States, and three Central Agencies for rehabilitating their selected dams. The Phase II is being cofinanced by World Bank and Asian Infrastructure Investment Bank (AIIB). The completion period of the scheme is March, 2031. Details of fund allocation to all implementing agencies under the Externally Aided Dam Rehabilitation and Improvement Project (DRIP) Phase II & III, as approved by the Union Cabinet, are provided in below. Benefits generally include improved safety and operational performance of rehabilitated dam along with dam safety institutional strengthening. This information was provided by THE MINISTER OF STATE FOR JAL SHAKTI SHRI RAJ BHUSHAN CHOUDHARY in a written reply to a question in Lok Sabha today. MAM/SMP (Lok Sabha US Q909) Details of Central Assistance released, Irrigation potential created and Storage revival under PMKSY- HKKP (Since 2016-17 to 2024-25) I r r i g a t i o n S l Central Assistance Revival of Storage State Potential restored No. Released (Rs. In Cr.) (MCM) (Th ha) 1 Andhra Pradesh 2.70 2 Bihar 41.76 21.80 87.92 3 Gujarat 14.54 3.90 0.0 4 Madhya Pradesh 0.00 8.00 0.035 Manipur 27.96 0.62 5.74 6 Meghalaya 2.66 0.88 0.44 7 Nagaland 15.74 0.0 0.0 8 Odisha 151.56 33.83 22.20 9 Rajasthan 82.01 17.77 11.52 10 Tamil Nadu 146.74 14.25 4.77 11 Telangana 59.68 16.31 54.37 12 Uttar Pradesh 0.00 2.35 4.29 Total 545.35 119.71 191.28 Details of fund allocation as approved by the Union Cabinet under the Externally Aided Dam Rehabilitation and Improvement Project (DRIP) Phase II & III Union Cabinet Allocation for Ph II and III S.no. State/Agency Ph II Cost (Rs. In Cr.) Ph III Cost (Rs. In Cr.) 1 AP WRD 336 331 2 BBMB 70 160 3 Chhattisgarh WRD 133 0 4 DVC 44 100 5 Goa WRD 58 0 6 Gujrat WRD 201 199 7 Jharkhand WRD 57 181 8 KaWRD (incl. KPCL) 308 304 9a Kerala SEBL 75 75 9b Kerala WRD 166 0 10 Maharashtra WRD 379 561 11 Manipur WRD 156 155 12 MePGCL 221 220 13 MP WRD 100 86 14 Odisha WRD 403 401 15 Punjab WRD 196 246 16 Rajasthan WRD 503 462 17a TANGEDCO 227 227 17b TN WRD 303 307 18 Telangana WRD 276 269 19 UJVNL 171 103 20 UP I&WRD 396 391 21 West Bengal I&WD 43 41 22 CWC 285 285 Total 5107 5104****** (Release ID: 2147827)

Continue your research