Home India Ministry of Civil Aviation Draft revision to CAR Section 2 Series F Part XV - Requireme...
Date: 2017-10-05 Category: Draft Regulation State: Union Government Country: India

Draft revision to CAR Section 2 Series F Part XV - Requirements for manufacture, registration and airworthiness control of hot air balloons

Issued by Ministry of Civil Aviation · Directorate General of Civil Aviation

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** This document proposes amendments to CAR Section II Series F Part XV, which outlines the requirements for the manufacture, registration, and airworthiness control of hot air balloons. It specifies new procedures, definitions, and security measures that manufacturers, owners, and operators must follow to ensure safety and compliance. **Key Points / Main Content** **Amendments and Definitions:** * **Deleted Text**: Marked with strikethrough. * **New Text**: Highlighted in grey. * **Ellipsis**: Indicates unchanged text. * The document provides definitions for terms like "Balloon," "Hot Air Balloon," "Balloon Component," "Major Damage," "Major Defect," "Envelope," "Basket," and "Design Maximum Weight." **Manufacture of Hot Air Balloons:** * Standards prescribed in FAR Part 31 apply for design airworthiness. * Suitability and durability of materials must be established. * Manufacturers must notify DGCA of their intent and apply for approval. * Police clearance required for manufacturers. * Personal-use balloons require no type certificate. Other balloons require DGCA-issued or revalidated type certificates. * Manufacturers are responsible for quality assurance and must issue compliance certificates, except for Experimental category balloons. * Manufacturers must maintain records of all balloons sold and provide them to DGCA upon request. * Maintenance and operation documents must be prepared for DGCA approval. * Manufacturers must develop maintenance programs for continued airworthiness and specify overhaul lives. * Balloon components/spare parts require a Release Note or equivalent or airworthiness certification. **Registration and Markings:** * All manned free balloons must be registered before flight. * Application on CA-28 with a fee of Rs 100. * Certificate of Registration details the balloon type, constructor, and markings. * Balloons must carry an identification plate with registration markings. **Security Aspects:** * Balloons cannot be sold without a certificate from DGCA. * Security clearance from MHA required for acquisition/manufacture/registration. * One-time security clearance from State Police required before operations. * Flights are prohibited over VIP locations, defense installations, and restricted areas without permission. * Owner/operator is responsible for security. **Conditions for Flight:** * A valid Certificate of Airworthiness is required for flight. * Commercial balloons require Type Certificate issued or validated by DGCA * Personal-use balloons do not need Type Certificate; they need C of A in Special Category. * Automatic suspension of C of A if inspections or mandatory modifications are not carried out, or if significant damage/defects occur. **Certification & Flight Manual:** * Balloons must be inspected and certified within 24 hours before "lift off." * Operators shall not undertake maintenance/overhaul of balloons unless they possess the manufacturers' maintenance/overhaul manuals. * Flight Manual with operating limitations, normal and emergency procedures and other pertinent information must be provided. **Other Requirements:** * Journey Log Book must be maintained. * Balloon Log Book must be maintained by the operator. * Quality Control-cum-Maintenance System Manuals (CAME/MOM/MOE) are required to be prepared **Annexures:** * **Annexure I:** Proforma detailing particulars for security verification. * **Annexure II:** MHA requirements, including security programs, GPS tracking, and operational restrictions. * **Annexure III:** List of areas used for balloon operations in Northern, Southern, and Western India. **Impact Analysis** **Manufacturers:** * **Impact:** Need to implement new manufacturing and maintenance procedures. * **Action Required:** Update manufacturing processes, documentation, and security protocols; apply for necessary approvals. **Owners/Operators:** * **Impact:** Subject to stricter security, registration, and operational requirements. * **Action Required:** Obtain security clearances, comply with operational restrictions, ensure proper maintenance, and carry required documentation. **DGCA:** * **Impact:** Increased oversight and approval responsibilities. * **Action Required:** Update procedures for issuing certificates, clearances, and approvals; monitor compliance. **Pilots:** * **Impact:** Ensure inspection within 24 hours preceding "lift off." * **Action Required:** Ensure that the logbook is maintained.

Key Entities Referenced

Civil Aviation Requirement Section 2 - Airworthiness Series 'F', Part XV: This document outlines the requirements for the manufacture, registration, and airworthiness control of hot air balloons. DGCA: The Directorate General of Civil Aviation, responsible for the approval and oversight of hot air balloon operations and manufacturing. Ministry of Home Affairs (MHA): Requires security clearance for acquiring, manufacturing, or registering hot air balloons, with operational and security requirements outlined in Annexure II. CAR Section 2 Series 'F' Part III: Referenced section of the Civil Aviation Requirements relating to granting Type Certificates for hot air balloons engaged in commercial operations. New Delhi: The location of the Central Pay and Accounts Officer, DGCA, to whom fees related to registration should be paid.
Official Source Record View Original Source →
See Full Document Text
CAR Section II Series F Part XV is proposed to be amended. The propose amendments are shown in subsequent affected paragraphs. The text of the amendment is arranged to show deleted text, new or amended text as shown below: (a) deleted text is marked with strikethrough; (b) new or amended text is highlighted in grey; (c) an ellipsis (…) indicates that the remaining text is unchanged in front of or following the reflected amendment CIVIL AVIATION REQUIREMENT SECTION 2 - AIRWORTHINESS SERIES 'F', PART XV Subject: Requirements for manufacture, registration and airworthiness control of hot air balloons. 1 Applicability: This part of the Civil Aviation Requirements lays down the requirements for manufacture, registration, issue/ renewal of Certificate of Airworthiness and continuous maintenance of manned free balloons. The persons engaged in maintenance/ overhaul/ inspection/ repair of the balloons and the balloon components shall be licensed/ approved by the DGCA. 2. Definitions: (i) "Balloon" means a non-power-driven lighter than air aircraft. (ii) "Hot Air Balloon" means a balloon that drives its lift from heated air contained within the envelope. (iii) "Balloon Component "means any part, soundness and correct functioning of which when fitted to a Balloon is essential for the continued airworthiness and safety of the balloon. (iv) "Major Damage" means any damage to a balloon or balloon component which may affect the safety of the balloon or safety of the person on board. (v) "Major Defect" means any failure or malfunctioning of a balloon or balloon component, which may affect safety of balloon and/or of persons on board. (vi) "Envelope” means the enclosure in which the lifting medium is contained. (vii)"Basket" means the container suspended beneath the envelope, mainly used for the balloon occupants. (viii)"Design Maximum Weight" means the maximum all up weight of the balloon when not filled with lifting gas or air. 3. Manufacture of Hot Air Balloons ISSUE III, Dated----- 13.1 The standards prescribed in FAR Part 31 for the design shall be the minimum requirements for airworthiness of the hot air balloons. 3.2 The suitability and durability of all materials must be established on the basis of experience or tests. It will be ensured that they have the strength and other properties assumed in the design. 3.3 Persons/firms desirous to take up design and manufacture of hot air balloons will intimate the DGCA of their intention and apply for necessary approval as required under CAR Section 2 - Series 'E' Part I CAR 21. 3.4 Before a person/firm undertakes manufacture of hot air balloon, a clearance from the local police authorities regarding his character/ antecedents shall be obtained. 3.5 A hot air balloon used for personal flying by the pilot(s) need not have a Type Certificate. All other balloons should have a Type Certificate issued or revalidated by the DGCA before undertaking the manufacture. 3.6 The manufacturer will be responsible for the quality assurance of his products and will issue a certificate of compliance to airworthiness standards, except where the balloon is certified in Experimental category. 3.7 The manufacturer shall keep a complete record of all hot air balloons manufactured and full particulars of those to whom sold and should produce this record to DGCA when required. 3.8 The manufacturer shall prepare the necessary documents regarding maintenance and operation for approval of the DGCA in accordance with CAR Section 2 - Series 'E' CAR 21 for the Experimental Category balloons. 3.9 The manufacturer shall develop satisfactory maintenance programme to ensure continued airworthiness of the hot air balloon and should deliver the same with every balloon produced. The manufacturer should also specify the overhaul life of the burner/instruments/gas pipelines and advise the operators regarding organizations which should be approached for the overhaul or other major maintenance. He will be responsible for issuance of any modifications to the hot air balloon to improve safety of operations after the approval of DGCA. For this purpose the manufacturer may provide kits or drawings or suggest alternate methods so that the operators can carry out the modifications. 3.10 Components of Balloon/Spare Parts and Materials used on a Balloon : Components of Balloon/Spare Parts and materials used thereon shall be :- (i) Covered by a Release Note, or equivalent document acceptable to Director General, issued by an approved firm. (ii) Manufactured or repaired/overhauled, inspected and certified as airworthy by an approved organization or person appropriately licensed or approved by Director General. 4. Registration and Markings of Balloons: ISSUE III, Dated----- 24.1 All manned free balloons are required to be registered before any flight is undertaken and registration markings must be affixed thereon in manner prescribed in CAR Section 2 - Series 'X', F Part I. 4.2 The application for registration should be made on the prescribed proforma CA-28 and should include the prescribed fee of Rs 100 in the form of Indian Postal orders or Bank Draft payable to the Central Pay and Accounts Officer, DGCA, New Delhi. as per rule 35 of Aircraft rules 1937. 4.3 The Certificate of registration, when issued, shall include information on the type of Hot Air balloon, constructor's serial number, nationality, registration markings assigned, the number and date of registration. A copy of this C of R shall be kept on board during flight. 4.4 Every hot air balloon shall carry an identification plate showing the registration markings, constructor's name, the balloon serial number and the name and address of the owner of the balloon. 5. Security Aspects : 5.1 The hot air balloon shall not be sold or disposed of in any way to any person or firm without production of a certificate from the DGCA. The certificate shall granted by the DGCA after verifying the antecedents of the prospective buyers from the local police authorities Ministry of Home Affairs. 5.2 Any person or firm intending to acquire/manufacture or register a hot air balloon is required to obtain security clearance from Ministry of Home Affairs (MHA) through DGCA and comply with the requirements specified by MHA. The security and operational requirements of MHA are detailed in Annexure -II to this CAR. Before registration of hot air balloon in the name of any person or firm full particulars thereof shall be obtained in the prescribed proforma and security vetting thereof shall be completed. 5.3 One time security clearance of the manufacturer, owner, operator shall be obtained from the State Police authorities before initial commencement of the operations. The prospective manufacturer / owner of hot air balloon shall submit duly filled proforma as specified at Annexure - I to this CAR to DGCA HQRS (Directorate of Airworthiness). The request of the applicant for security clearance shall be forwarded to MHA after ensuring that the application is complete in all respect. Receipt of security clearance of the applicant from MHA will be informed by the DGCA. 5.4 The hot air balloon shall not be flown over entire air space covering VIP locations, defence installations, other restricted and prohibited areas. The hot air balloon shall also not be flown over an assembly of persons or over congested areas unless prior permission in writing is obtained from appropriate authorities. The restricted areas shall be notified by the DGCA from time to time in consultation with the Ministry of Home Affairs. The hot air balloon shall be operated within the area specified to the operator as per the their permit or otherwise. List of area used for operation of hot air balloon is given in Annexure – III. 5.5 The owner/operator shall be responsible for the safe custody, security and access control to the hot air balloon. Notwithstanding to the above owner / operator of hot air balloon shall comply with the security related directives issued by the Ministry of Home Affairs from time to time. ISSUE III, Dated----- 35.6 Normal security measures shall be ensured at the place of operation before each flight. 5.7 No photographic equipments should be taken in the balloons and no photography is permitted from the air. 5.8 No harmful objects, remote-controlled devices and sensors should be carried in the balloons. 5.9 Severe penalties/ action will be taken against the defaulters. The proforma for furnishing particulars for the security clearance of the applicants is given in Appendix 'B'. 6. Conditions for Flight of a Balloon: 6.1 No hot air balloon shall be flown unless it possesses a valid Certificate of Airworthiness. 6.2 Hot air balloons engaged in commercial operations possessing a Type Certificate issued or validated by the DGCA or export C of A issued by a country whose airworthiness standards are equivalent and acceptable to DGCA may be granted C of A in Normal Category subject to compliance of requirements contained in CAR Section 2 - Series 'F' Part III and such other conditions as may be prescribed. 6.3 Hot air balloons used for personal flying by pilot(s) themselves, even if they carry sponsor's banners, need not have a Type Certificate. Such balloons shall be issued C of A in Special Category, Sub-Division Experimental category. 6.4 The Certificate of Airworthiness may remain valid for period as specified in CAR Section 2 Series ‘F’ Part III unless withdrawn or suspended earlier by the Director General if he is satisfied that reasonable doubt exists as to safety of the balloon in question. The Certificate of Airworthiness of a balloon shall automatically stand suspended :- (i) If the balloon is not inspected and certified by authorised Approved/licensed personnel at intervals prescribed in the approved Maintenance program Quality Control Cum Maintenance System Manual; (ii) If mandatory modifications/inspections as required by the Director General are not carried out; (iii) If modifications/repairs affecting airworthiness of the balloon and not approved by the manufacturer or by the Director General, are carried out; and (iv If a balloon suffers major damage or reveals any major defect which may render the machine unsafe for flight and shall remain suspended till such time the above deficiencies are removed. 6.5 Application for the issue of Certificate of Airworthiness shall be made to the DGCA hqrs. on the proper form, together with prescribed fee. ISSUE III, Dated----- 46.6 The Director General DGCA may issue/ extend the Airworthiness review certificate (ARC) in respect of a balloon for a maximum period of 12 months, after such inspection and subject to such conditions as may be prescribed. Application for renewal of Certificate of Airworthiness issue/extensionl of ARC shall be made to the Regional Airworthiness Office together with the prescribed fee. 7. Certification : 7.1 No balloon shall be flown unless during 24 hours preceding the "lift off", it has been inspected in accordance with an approved schedule and the "Flight Release" "certificate of release to service" issued in accordance with CAR M Sub Part F or CAR 145. in the form as indicated in the appendix to this part of the CAR, by a person licensed/approved by the Director General. 7.2 After issue of the "Flight Release" ‘certificate of release to service', the pre- flight inspection shall have to be carried out before the first flight of the day by an appropriately licensed pilot, in accordance with a duly approved schedule. The pilot may also carry out the next higher inspections up to 25 hrs. in accordance with duly approved schedules. 7.3 The higher than 25 hrs. inspection schedules and overhaul of the balloon and its components shall be carried out by holders of AME license, endorsed for a particular type of balloon, or persons specially approved or authorized to inspect/repair/modify and certify the airworthiness to the extent and scope of their license/approval permits authorisation. 7.4 The Certificate of release to service Flight Release shall be made in duplicate, one copy of which shall be handed over to the pilot and the other shall be retained by the operator for a period of one month unless directed otherwise by DGCA. 8. The Director General may require the balloon to be weighed at the time of renewal of C of A or ARC or at any other time considered necessary. 9. Flight Manual: The operating limitations, normal and emergency procedures and other pertinent information, peculiar to balloon operating characteristics are provided in the Flight Manual, furnished with each balloon or by a placard in the balloon, that is clearly visible to the pilot. The cockpit and emergency checklist in laminated form shall be carried on board, unless they form a part of the Flight Manual. The Flight Manual where applicable, shall always be carried on board. 10. Service Documents, Manuals, Repair Schemes etc. : 10.1 Operators / organizations shall not undertake maintenance/overhaul of balloons unless they possess the manufacturers' maintenance/overhaul manuals and have an arrangement for receiving amendments thereto. 10.2 Repairs, modifications and overhaul of balloons and balloon components shall be performed in accordance with approved drawings/ repair schemes and overhaul instructions issued by the manufacturers. In certain cases, the Director General may accept repairs carried out conforming to standard aeronautical practices. ISSUE III, Dated----- 510.3 Compliance of Service Bulletins / Instructions, mandatory inspections/ modifications issued by the makers or the Director General will be governed by the requirements of CAR M Section 2 - CAR Series 'M' Part I. 11. Log Books : 11.1 A Journey log Book in respect of each balloon indicating details of every flight, like the date of flight, lift off time, total flight time, the places of departure and arrival, shall be maintained. The entries in the log book shall be certified by the pilots undertaking the flights. 11.2 A Balloon log book shall be maintained by every operator to keep a record of the flying, modification and other repair work carried out on the balloon. 11.3 Maintenance/Overhaul Records : Records of inspection, overhaul, replacements, repairs, modifications and flight times shall be maintained in appropriate balloon log-book. The entries in the log book shall be certified by a licensed/approved authorised person. 11.4 The records shall be preserved for the following periods : (i) Balloon Log book :- Until such time the balloon is permanently withdrawn and its C of A is cancelled by the Director General. Provided that in case the balloon is involved in an accident resulting in damage beyond economical repairs, the balloon log book shall be preserved for a period of two years after the accident or for such period as by a competent authority investigating the accident. (ii) Procedure/Worksheet pertaining to balloon :-For at least five year after the completion of work. (iii) Records/Worksheet pertaining to lifed components:- One year after the component pertaining to lifed is permanently withdrawn from use to lifed components 12. Manual Requirements : All balloon operators (including private operators) are required to prepare Quality Control-cum- Maintenance Systems Manuals CAME/MOM/MOE as applicable for the guidance of their maintenance staff which will cover the following aspects : (i) All approved maintenance schedules and if they are too bulky then only the nomenclature of the approved maintenance schedules along with reference number and date of approval be quoted in the Manual and approved schedules be stocked separately. (ii) Safety requirements required to be followed during balloon handling on the ground or at the time of refueling/defueling, or while being housed inside hangar. (iii) Procedure for keeping balloon log books/work sheets up-to-date and preservation of the same and individuals, authorised to certify these documents. ISSUE III, Dated----- 6(iv) Procedure of recording/reporting of all defects observed during inspection or during flight and recording of rectification work undertaken. (v) Occasions when test flights would be carried out. (vi) Procedure of embodying mandatory modifications/inspections. Such Manuals are to be submitted to the Regional Airworthiness Office for the scrutiny. The manuals prepared by operators, other than private operators, shall have to be approved by DGCA, in accordance with CAR M. 13. Documents to be carried on Board in Flight : (1) Journey Log Book. (2) Radio-Telegraph apparatus, if applicable. (3) Certificate of Airworthiness and Airworthiness review certificate. (4) Certificate of Registration (5) Appropriate licence for the crew (6) Cockpit and Emergency Check List in laminated form or Flight Manual (if applicable). (7) Weight Schedule, duly approved and to be displayed at a prominent place. 14. All defects observed on ground and during flight shall be recorded in a register against which the rectification action taken, shall also be appended by a licensed/approved authorised person and signed and dated. 15. Instruments and Equipment to be carried by Balloons in flight: (1) Hand fire extinguisher of an approved type, in the main compartment carrying personnel. (2) Safety harness for each personnel on board. The harness for each person need not be provided for gondola or basket type of balloons. (3) A compass (4) An altimeter (5) A rate of climb indicator. (6) First Aid Kit ( as per CAR Series X Part III) (7) A fuel quantity gauge. (8) An envelope temperature indicator. (9) Burner relighter. (10) Two way R/T Communication Equipment. 15. The operation of the balloon flights will only be undertaken during day time under V.F.R conditions. 16. Test Flights : ISSUE III, Dated----- 7The Test Flights shall be carried out in accordance with the requirements of CAR Section 2, Series 'T' Part II. Director General of Civil Aviation ISSUE III, Dated----- 8Annexure-I PROFORMA DETAILING PARTICULARS FOR VERIFICATION BY APPLICANT FOR MANUFACTURE, PURCHASE, REGISTRATION AND OPERATION OF MICROLIGHT AIRCRAFT/HOT AIR BALLOONS WARNING :- SUPPRESSION OF MATERIAL OR FACTUAL INFORMATION INTHIS FORM SHALL BE A DISQUALIFICATION. 1. (a) Name of Applicant in Full (in Block Letters) Surname Name Aliases, if any _________________ _______________________ ______________ (b) Parentage : Surname Name Aliases, if any _________________ _______________________ ______________ 2. Present address in full, including Police Station : ____________________________________________________________ ____________________________________________________________ ____________________________________________________________ 3. (a) Permanent address in full, including Police Station : ___________________________________________________________ ___________________________________________________________ ___________________________________________________________ (b) If originally a resident of a country other than India, address in that country and the date of migration to India : ____________________________________________________________ ____________________________________________________________ 4. Nationality : ______________________________________________ 5. Date and place of birth, with full address : ____________________________________________________________ ____________________________________________________________ ISSUE III, Dated----- 96. Profession/occupation after the age of 18 years : ____________________________________________________________ 7. Particulars of places, with full address, where the applicant has resided for more than a year during the preceding ten years : ____________________________________________________________ ____________________________________________________________ 8. (a) Particulars of relatives - Indians and non-Indians - working in foreign Missions, foreign organisations including foreign concerns, with full details : ___________________________________________________________ ___________________________________________________________ (b) Particulars of relatives living abroad with their full address : ___________________________________________________________ 9. Is the applicant or any of his relatives a member of social or cultural organisation which is associated with or assisted by a foreign Mission or organisation? ____________________________________________________________ 10. Has the applicant visited a foreign country recently? If so, details thereof : ____________________________________________________________ 11. Has the applicant ever been arrested, prosecuted, kept under detention, or convicted by a court? Give details : _____________________________________________________________ Certified that the information furnished in this proforma is correct and complete to the best of my knowledge and belief. I am aware that furnishing of wrong information or suppression of factual or material information will dis-entitle me from grant of the licence/permit. Signature of the Applicant DATE : ISSUE III, Dated----- 10Annexure – II MHA REQUIREMENTS A. Security Requirements: 1. Security program shall be approved by BCAS for security oversight before issue of Certificate of Airworthiness. 2. Security measures approved by BCAS shall be adopted at the place of operation before each flight by the owner/operator and shall is responsible for the safe custody, security and access control of the aircraft. 3. The operator shall maintain proper log Book relating to operation and submit the same to the office of District Magistrate on quarterly basis. 4. Details of approved owners/operators should be made available to local district authorities i.e. District Magistrate and Superintendent of Police to monitor the the activity 5. The owner / operator shall not lease/ rent / lend the hot air baloon. 6. No hot air balloon shall carry any remote sensing appurtenances / weapon / photography/ video recording equipment without the express permission of MHA except those equipments required for the safe operation of the aircraft or specified. in this CAR. 7. The hot air balloon shall not be sold or disposed of in any way to any person or firm without production of an NOC from the DGCA. The NOC shall be granted by the DGCA on production of security clearance from MHA. 8. Local Police to ensure that no security breach has been done by the operator. B. Equipment Requirements: 1. Operator shall install GPS System for Tracking and Monitoring by MHA and is required to be registered with MHA. 2. Operator shall install two way communication System for communication between hot air balloon and Ground Monitoring station of MHA. C.Operational Restrictions 1. The hot air balloon shall be operated with in the area specified in Annex – III of this CAR. New area for operations may be added in the list as per the requirement of the operator after obtaining necessary clearances from stake holders such as defence establishment ,airport operator, flying clubs etc. 2. The maximum horizontal range of operation shall be restricted to 25 km radius circle in the pre-defined area and vertical range up to 7,000 feet above the ground level. 3. The hot air balloon shall be parked at the designated airports/ approved places only. 4. Copy of C of R (usual station) should be forwarded to district administration and/orAAI for monitoring the flying activities in their area. ISSUE III, Dated----- 11D. Penalties: 1. Breach of compliance to any of the requirements would attract penal action including imposition of penalties. 2. Breach if any is noticed by MHA/any Govt. Authority, the same shall be intimated to the Authority concerned for taking necessary action including imposition of penalties under the applicable statutory provisions.Severe penalties/actions will be taken against the defaulters. ISSUE III, Dated----- 12Annexure – III LIST OF AREA USED FOR OPERATION OF HOT AIR BALLOON Northern India S. No. Name of place Area of operation Co ordinates 26.8242° N, 1. Rajasthan Jaipur 75.8122° E 271104.18 N 2. Agra Railway Ground 780202.97 E 251533.19 N 3. Allahabad Sirsa 820533.99 E 280235.10 N 4. Bikaner Samta Nagar 731959.47 E 281611.38 N 5. Damdama Damdama Lake 770711.41 E Race Course 301816.03 N 6. Dedhradun Valley 780226.28 E 321142.61 N 7. Dharamsala Jawahar Nagar 761931.58 E 265853.10 N 8. Jaipur Amer 075514.73 E 263956.23 N 9. Jaisalmer Narsigon ki Dhani 705525.24 E 280746.84 N 10. Jhunjhunu Shekhawati 752347.25 E 261848.02 N 11. Jodhpur Barli 725552.70 E 335523.30 N 12. Laddakh Pangong Lake 782623.42 E 340949.92 N 13. Leh Leh City 773528.42 E 265208.03 N 14. Lucknow Chowk Stadium 805432.65 E 282146.96 N 15. Manesar Manesar 765721.58 E 243519.37 N 16. Mount Abu Polo Ground 724229.63 E 302735.65 N 17. Mussoorie Mall Road 780401.26 E 275935.58 N 18. Neemrana Madhosinghpura 762314.54 E 263000.00 N 19. Pushkar Mela Ground 743300.00 E 260000.00 N 20. Ranthambore Itawa 761400.00 E ISSUE III, Dated----- 13340215.70 N 21. Srinagar Athwagan 745234.53 E 243550.17 N 22. Udaipur Fateh Sagar Lake 733955.42 E 251805.44 N 23. Varanasi Ramnagar 830102.00 E Balloon Port Damdama 28 18 N 24. New Delhi Gurgaon, 77 07 E Haryana 32242.64 N 25. Bir-Biling Bir-Biling 764326.60 E 265834.55 N 26. Khimsar Kheenvsar 732353.21 E 280346.00 N 27. Mandawa Mandawa 750841.39 E Southern India S. No. Name of place Area of operation Co ordinates 172648.11 N 1. Hyderabad Gachibowli 782040.80 E 120134.93N Pondicherry Kalapet 2. 795102.96 E Trivandrum 83417.28 N Trivandrum International 765303.31 E 3. Stadium 151949.52 N 4. Hampi Krishnapura 762720.05 E Eastern and North-Eastern India S. No. Name of place Area of operation Co ordinates 202440.98 N Bhubaneswar Dadhapatna 1. 854959.38 E 244730.77 N 2. Bodhgaya Ashok Nagar 845842.71 E 244822.83 N 3. Imphal Polo Ground 935611.17 E ISSUE III, Dated----- 14Western India S. No. Name of place Area of operation Co ordinates 230205.67 N 1. Ahmedabad Rajpath Club 723028.69 E 221926.87 N 2. Baroda Gorwa Road 73100.39 E 231357.66 N 3. Bhopal Govindpura 772708.24 E 151303.80 N 4. Goa Quepem 740346.66 E 184953.93 N 5. Lonavala Talegaon 731658.26 E 183036.95 N 6. Pune Race Course 735335.78 E 211059.79 N 7. Surat Bhallai 724042.41 E - END - ISSUE III, Dated----- 15

Continue your research