GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
Minor Irrigation - Tank Reliant Irrigated Area Development Project - Preliminary
Project Report (PPR) Preparation - Orders - Issued
Irrigation & Command Area Development, (MIG1) Department
G.O.Ms.No. 17 Date:31-01-2012
Read the following:-
1. G.O.Rt.No.1157, I&CAD (MI.IV) Department dt.14-06-2009
2. G.O.Ms.No.72, I &CAD (MI.III) Department dt.25-05-2011
3. G.O.Ms.No.139, (MIG) Department dt.16-09-2011
4. Govt. Memo No.477/MIG1/2011 dated 10-01-12, enclosing Minutes of discussions
regarding development of Tank Information System by APSRAC, dated 28-12-2011.
5. CNo.477/MIG1/2011 dated 30-01-2012: Minutes of discussion regarding linkages of
Tank Information System with TRIAD PPR preparation work, dated 28-01-2012.
-x-x-x-
Order:
1. Introduction:
A. Broad conceptual guidelines of the Tank Reliant Irrigation Area Devel-
opment (TRIAD) project and coverage of Districts has been communi-
cated in GoMs No.72, I&CAD department, dated 25-05-2011 (refer-
ence second cited). The following 8 districts (Table-1), where more
than 50% of the net irrigated area (NIA) is fed by tanks and other minor
irrigation sources, have been identified for the TRIAD Project.
Table-1: TRIAD Project Districts
Net Irrigated
Region District % MI
Area (Acres)
Andhra Srikakulam 554,050 61%
Vizianagaram 405,171 71%
Vishakhapatnam 354,589 67%
Rayalaseema Chittoor 435,088 61%
Anantapur 323,686 53%
Telengana Adilabad 318,251 54%
Medak 292,991 91%
Ranga Reddy 134,896 93%
Total 2,818,722
Note: Includes irrigation potential of ongoing projects, most of which are in the
major and medium irrigation sector. Thus, the actual share of tank reliant irriga-
tion will be higher than what is indicated in this table.B. Preliminary Project Report (PPR) is to be prepared on the basis of Cat-
chment area studies integrating Remote Sensing, Global Positioning
System (GPS) and Conventional Surface Hydrology data.
C. Considering the long tradition of tank chains and tank reliant irrigation
in Chittoor area, pilot studies were taken-up in approximately 50
Sq.Km area of three micro basins in the same district. Pilot study in the
Pennar sub-basin by the AP State Remote Sensing Application Centre
(APSRAC), yielded the following data (Table-2) for Preliminary
Project Report (PPR) preparation work.
Table-2: Unit cost data for TRIAD preliminary project report preparation
PPR Component Unit of Mea- Rs /
surement Unit
1 Physcial verification of existing tanks and cascades Number of 2,000
Old (Exist-
ing) Tanks
a Collection of hydraulic particulars using hand
held GPS instrument (8-10 points).
b Photography and documentation of the present
condition of tanks, sluices, surplus weirs, etc.
c Command area data regarding bore wells, open
wells, farmers, land holdings and crops.
2 Preparation of soil maps on at least 1:50000 scale, Square Km. 150
using satelite data.
3 Hydrological estimation for existing tanks Number of 3,000
Old (Exist-
ing) Tanks
a Collection of rain fall data from the Directorate of
Economics and Statistics (DES) and the India Me-
terological Department (IMD)
b Run off and yield estimation
c Designed flood estimation
d Tank yield assessment for respective crop demand
4 Preparation of preliminary investigation reports in- Number of 5,000
cluding hydrological assessment for new tanks. New Tanks
5 Cascade Assessment Number of 500
Links be-
tween tanks2. Tank Memoirs & Information System:
A. Earlier Government had issued orders in GO Rt No.1157,I&CAD(MI4)
dated 14-06-2009 for preparation of Tank Memoirs, in respect of
erstwhile Panchayat Raj tanks, mostly with 10-40 hectares (25-100
acres) ayacut. More than 64 data elements grouped under four catego-
ries namely (i) Location details (ii) Hydrological particulars (iii) Stan-
dards of the tank (iv) Other relevant information are being collected.
Tank Memoirs are permanent records useful for taking up restoration
and repair works as and when needed. An amount of Rs.24.804 crores
was sanctioned for preparation of the memoirs by outsourcing the task
to private firms. The CE-MI has informed that 16 agencies are engaged
for preparation of Tank Memoirs. These agencies are also gathering (a)
Video recordings of the Ayacut viewed from the tank bund, (b) Video
recording of tank bed and foreshore viewed from the tank bund, and (c)
Photographs of tank structures namely sluice, surplus weir and bund
etc. There are 20,868 tanks spread over 22 districts for which tank
memoir preparation work has been entrusted. Out of this 10,817 tanks
fall in the 8 TRIAD project districts. By now tank memoirs have been
prepared for 14,798 tanks including 6,325 tanks in TRIAD Project dis-
tricts.
B. Subsequently, the DG APSRAC proposed development of a Tank In-
formation System (TIS) using high resolution satelite remote sensing,
geographical information system (GIS), and geographical positioning
system (GPS) data. An amount of Rs598.65 lakhs has been sanctioned
in GOMs139 I&CAD(MIG) dated 16-09-2011 (reference third cited),
for development of TIS while integrating the tank memoir preparation
work sanctioned earlier.
C. Synergies exist between the Tank Memoir preparation, the Tank Infor-
mation System and the TRIAD project preparation works. According-
ly, the APSRAC will be able to generate the following information that
can feed into preparation of preliminary project reports for the TRIAD
project.1. Satelite data & Survey of India Topo sheets.
2. Delineation of catchment area of tanks and cascades, including drainage, using
1:25000 scale, and where this is not available, using 1:50000 scale SI topo
sheets.
3. Preparation of land cover and land use map of the area.
4. Preparation of slope map using SI topo sheets.
5. Eyeballing of SI topo sheets, group discussion and brainstorming to identify po-
tential new tank sites and new cascades.
D. However, during follow-up discussions, APSRAC officers have indi-
cated that the TIS cost estimate submitted by them did not include the
cost of preparation of tank memoir for the remaining MI tanks. The re-
maining tanks include mostly, larger MI tanks. Substantive parts of
tank memoirs for these tanks would be readily available in the con-
cerned Irrigation Divisions. Additional data, consistent with modern
concept of tank memoirs, such as GPS coordinates, etc. will have to be
gathered. Hence, APSRAC officers have been asked, vide para 2 (b) &
(d) of reference fourth cited, to group the Tank Memoir data elements
and estimate additional cost for gathering of field data to complete the
tank information system.
E. The DG APSRAC has, in the mean while informed that, Tank Memoir
data elements that can be gathered from records & documents have
since been identified in consultation with the CE-MI. These data ele-
ments mostly identify the tanks. APSRAC will incorporate these identi-
fying data into the Tank Information System. However, these identify-
ing data elements constitute a small part of the Step-1 of TRIAD PPR.
This does not significantly reduce the unit cost for TRIAD step-1.
Hence, it will be desirable to ask the PPR preparation agencies to gather
complete information required for step-1 of TRIAD PPR.
3.Administrative Sanction for TRIAD - Preliminary Project Report
Preparation:
A. Government, after careful consideration, hereby accord the administra-
tive approval for Rs.2493.82 lakhs (Rupees twenty four crores, ninety
three lakhs, and eighty two thousand only) for development / preparation
of Preliminary Project Report ( PPR) for Tank Reliant Irrigated Area De-
velopment (TRIAD) Project for 8 districts as per the cost estimate given intable-3 below, based on the unit costs derived from the pilot studies done
by APSRAC in Pennar sub-basin of Chittoor district.
Table-3: Cost estimate for TRIAD preliminary project report (PPR) prepara-
tion. [Costs in Lakh Rupees]
Sl District Component wise PPR Cost Estimate Total
Cost of
PPR
Physical Soil Old Tank New Tank Cascade
No Verifn. Maps Hydrol. Est. Invstgn.Identifn.
1 Srikakulam 175.98 8.75 263.97 25 7 480.70
2 Vizianagaram 184.58 9.16 276.87 25 7.25 502.86
3 Vishakhapat- 82.00 17.42 123.00 25 14 261.42
nam
4 Chittoor 176.58 22.59 264.87 5 18 487.04
5 Anantapur 64.40 28.85 96.60 5 23 217.85
6 Adilabad 31.18 24.25 46.77 20 19.5 141.70
7 Medak 83.00 14.63 124.62 20 11.75 254.00
8 Ranga Reddy 43.18 11.30 64.77 20 9 148.25
Total 840.90 136.95 1261.47 145 109.5 2493.82
B. The above expenditure of Rs2493.82 lakhs shall be debited to the head
of account “4702 NSP - MH 101 - GH 11 - SH 12 - 530 Major Works /
531 Other Expenditure” within the budget provision of minor irrigation.
C. The TRIAD PPR preparation work for the Chittoor district shall be tak-
en up by the APSRAC, at the unit rates given in table-2, and subject to
the administrative sanction in table-3 above.
D. For the remaining seven districts, where TRIAD is proposed, the
Commissioner CAD shall identify, by open tender call, agencies to car-
ry out PPR work. The following prequalification criteria has been de-
veloped in consultation with APSRAC officers, Special Commissioner
CAD and the Director Ground Water Department.
i. The firm should have been in existence at least for a period of seven years.
ii. Minimum operational experience of five years, in at least one of the follow-
ing activities, namely; (a) hydrological investigation, (b) design and / or es-
timation of minor irrigation systems, (c) execution of minor irrigation sys-
tems, (d) testing, quality assurance, monitoring and evaluation of minor ir-
rigation systems.
iii. Has on its staff at least one full time professional in any two of the follow-
ing specialties, namely; (a) Hydrology (Civil Engineering with at least five
years experience in design or execution of irrigation systems), (b) Geo-
graphical Information System (GIS) Image Processing Expert (Masters inScience or Bachelor in Engineering with five years experience in GIS image
processing), and (c) Hydrogeologist (Masters in Applied Geology or Geolo-
gy with at least three years experience in delineation of zones on the basis of
weathering characteristics, joint pattern, solution features, disposition of
aquifers on the basis of attitude of beds formation); (d) Soil Mapping Expert
(BSc Agriculture with at least three years experience in soil mapping or soil
survey).
iv. Annual turnover of at least one crore rupees for three years.
E. The Commissioner, CAD shall take further necessary action according-
ly,
4. This order issues with the concurrence of the Finance department
vide their U.O.Note No.32802-A/1018/Expr.PW/A1/11,
dated 8-12-2011.
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)
Dr.PRASANTA MAHAPATRA
PRINCIPAL SECRETARY TO GOVERNMENT
To:
1. The Commissioner, CAD, Errumanzil, Hyderabad
2. The Chief Engineer, Minor Irrigation, Hyderabad
3. The Director General, WALAMTARI, Hyderabad
4. The Spl. Commissioner, CAD, O/o The Commissioner, CAD, Jalasoudha Building,
Errumanzil, Hyderabad
5. The Director, Ground Water Department, BRKR Bhavan, Hyderabad
6.The Chief Engineer, CAD, Hyderabad
Copy to:
1. The Principal Secretary to CM
2. Finance (Exp. PW) Department
3. The OSD to Minister for Minor Irrigation
4. The P.S. to Prl. Secretary to Govt. I&CAD Dept.
5. The P.S. to Spl. Secretary to Govt. I&CAD Dept.
6. SF/SC
::FORWARDED:: BY ORDER::
SECTION OFFICER