GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
I&CAD Dept.– Reconstitution of the State level Committee for Integrated Water
Planning and Management (SCIWAM) – Orders – Issued.
==================================================
IRRIGATION & COMMAND AREA DEVELOPMENT (W.R.G.) DEPARTMENT
G.O.Ms.No. 27, Dt.18-02-2012.
Read the following:
1. G.O.Ms. No. 95, I&CAD(PW:NSP1) Dept., dt. 01-08-1996.
2. G.O.Ms. No. 63, I&CAD(PW:MAJ. IRR-X) Dept., dt. 14-06-2010.
3. From the Engineer-in-Chief, I&CAD, Hyderabad, Letter No. ENC/IW/
P&M/EE-I/DEE-9/AEE3/13308/SCIWAM/2011/Vol. XIV, dt.01-12-2011.
-----000-----
ORDER:
In the reference 1st read above, the Committee for Integrated Operation of
Srisailam and Nagarjunasagar Reservoirs (CIOSANAR) was reconstituted and
renamed as Committee for Integrated Operation of Krishna and Pennar Basin
Project (CIOKRIP) with Engineer-in-Chief as Chairman and 8 other members,
bringing the Pennar Basin also into the fold of the Committee and the Chief
Engineers, TGP and Commissioner, CADA, also as its members.
2. Considering the orders issued in G.O.Ms.No. 372, I&CAD (SER-II) Dept.,
dt. 31-03-2010 for co-ordination of projects listed there-in by the Engineer-in-
Chief, Irrigation, Hyderabad as Engineer-in-Chief, Projects(I) and Engineer-in-
Chief, NTR TGP, Srikalahasti as Engineer-in-Chief, Projects(II), the Committee
for Integrated Operation of Krishna and Pennar Basin Project (CIOKRIP) has
been reconstituted and renamed as State level Committee for Integrated Water
Planning and Management (SCIWAM) to function as a Technical Committee
advising the Govt. and Commissioner, CADA, Hyderabad on the matters related
to integrated water planning and management including reviewing and
improving the water use efficiency, seasonally and covering all Major and Minor
River Basins in the State, in the reference 2nd read above.
3. In the reference 3rd read above, the Engineer-in-Chief, I&CAD, Hyderabad
has reported that in view of the orders issued to the Engineer-in-Chief,
Irrigation, Hyderabad in G.O.Ms. No. 895, I&CAD(SER-II), Dept. dt. 03-09-2011
for co-ordination of all the projects in ‘Rayalaseema’ region, and to the
Engineer-in-Chief, Indira Sagar Polavaram Project to co-ordinate all the projects
in ‘Andhra’ region, vide G.O.Ms. No. 896, I&CAD(SER-II), Dept. dt. 03-09-2011,
the posts of Engineer-in-Chief, Projects(I) and Engineer-in-Chief, Projects(II) are
not now existing and requested the Government to reconstitute the existing
SCIWAM with the following composition:
1. Engineer-in-Chief (I.W) - Chairman
2. Engineer-in-Chief, Irrigation - Member
3. Engineer-in-Chief, Indira Sagar Polavaram Project - Member
4. Chief Engineer, Inter State and Water Resources - Member
5. Chief Engineer, CADA - Member
6. Chief Engineer, GRID Operation, APTRANSCO - Member
7. Chief Engineer, (Projects) APGENCO - Member
8. Representative from the O/o the Commissioner, Agriculture - Member
9. Superintending Engineer, P&M Cell, Hyderabad - Convenor
10. Chief Engineers of Concerned Projects.
PTO-2-
4. Orders were issued in GOMsNo 1025, I&CAD(SER-II) Dept., dt. 1-10-2011
for co-ordination of all the projects in ‘Telangana’ region by the E-in-C (AW),
I&CAD Dept., Hyderabad.
5. Government recognize that the post of “Engineer-in-Chief” as per the
orders issued in G.O.Ms.No. 175, I&P (Services-II) Dept., dt. 12-04-1981, is
being referred to variably as Engineer-in-Chief (AW)/Engineer-in-Chief (IW)/
Engineer-in-Chief, Admn./Engineer-in-Chief, General(ENC-General) to distinguish
it from the post of Engineer-in-Chief, Irrigation(ENC-I).
6. Government, after careful consideration of the matter, hereby
reconstitute the existing State level Committee for Integrated Water Planning
and Management (SCIWAM) with the following composition:
1. Engineer-in-Chief, General, I&CAD, Hyderabad (ENC-G). - Chairman
2. Engineer-in-Chief, Irrigation, Hyderabad (ENC-I). - Member
3. Engineer-in-Chief, Indira Sagar Polavaram Project. - Member
4. Chief Engineer, Inter State and Water Resources - Member
5. Chief Engineer, CAD, Hyderabad. - Member
6. Chief Engineer, GRID Operation, APTRANSCO, Hyderabad. - Member
7. Chief Engineer, (Projects) APGENCO, Hyderabad. - Member
8. Representative from the O/o the Commissioner, Agriculture Dept.- Member
9. Superintending Engineer, P&M Cell, Hyderabad. - Convenor
10. Chief Engineers of Concerned Projects.
7. Government, also order that the committee functions and other terms as
prescribed at paras 4 & 5 of the reference 2nd read above, are continued.
8. The Engineer-in-Chief, General, I&CAD, Hyderabad shall take necessary
action accordingly.
(BY ORDER AND IN THE NAME OF THE GOVERNMENT OF ANDHRA PRADESH)
Dr. Prasanta Mahapatra
Principal Secretary to Government
To
The Engineer-in-Chief, General, I&CAD, Hyderabad,
The Commissioner, CADA, I&CAD Dept., Hyderabad
All the Members of the Committee.
(through the Engineer-in-Chief, General,
All the Engineers-in-Chief and
I&CAD, Hyderabad)
Chief Engineers in the Department.
Copy to:
The O.S.D to Hon’ble Minister for Major & Medium Irrigation.
The O.S.D to Hon’ble Minister for M. I., APSIDC, LI, GWD & WALAMTARI.
The P.S. to Prl. Secretary to Government (I), I&CAD Dept.
The P.S. to Prl. Secretary to Government (P), I&CAD Dept.
SC/SF
//Forwarded::By Order//
SECTION OFFICER