GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 4339
TO BE ANSWERED ON 18.03.2026
ABSS FOR DUVVADA RAILWAY STATION, VISHAKHAPATNAM
4339. DR. C M RAMESH:
Will the Minister of RAILWAYS be pleased to state:
(a) whether development works at Duvvada Railway station in
Vishakhapatnam taken up under Amrit Bharat Station Scheme (ABSS)
have been completed, if so, the details thereof;
(b) if not, the estimated time by when the above works are going to be
completed;
(c) whether it is true that there are demands for including Pendurthi station
under the said Scheme; and
(d) if so, the details thereof and the steps taken/being taken to include
above station under ABSS?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (d) Duvvada station, located in Andhra Pradesh has been identified for
development under Amrit Bharat Station Scheme. At this station, facilities
like high level platform, platform shelter, waiting hall, drinking water
arrangement, urinal, lavatory, seating arrangement, Foot Over Bridge etc.
are available.
Development works at Duvvada station have been taken up at good pace.
The works of new platform shelter and platform surfacing have been
completed. The works of station building at second entry, circulating area,
lift and 12 m Foot Over Bridge have been taken up.
§At Pendurthi station, located in Andhra Pradesh, facilities like high level
platform, platform shelter, waiting hall, drinking water arrangement, urinal,
lavatory, seating arrangements, Foot Over Bridge etc. are available. The
works of high level platform, platform shelter, improvement of booking
office and tactile pathway for Divyangjan have been completed in recent
years.
Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways is a continuous and ongoing process and works
in this regard are undertaken as per requirement, subject to inter-se
priority and availability of funds. Development / redevelopment /
upgradation / modernisation of a station is carried out based on category
of station/condition/traffic handled etc.
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their implementation
in phases to improve the stations. The master planning includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement, water
booths
Provision of wider foot over bridge/air concourse commensurate with
passenger traffic
Provision of lift/escalators/ramp
Improvement /Provision of platform surface and cover over platforms Provision of kiosks for local products through schemes like ‘One
Station One Product’
Parking areas, Multimodal integration
Amenities for Divyangjans
Better passenger information systems
Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity at each
station.
The scheme also envisages sustainable and environment friendly solutions,
provision of ballastless tracks etc. as per necessity, phasing and feasibility
and creation of city centre at the station in the long term.
So far, 1338 stations have been identified for development under Amrit
Bharat Station Scheme, out of which 35 stations including Duvvada station,
are located in Andhra Pradesh. The name of stations identified for
development under Amrit Bharat Station Scheme in Andhra Pradesh are as
following:
State No. of Names of Stations
Stations
Andhra 73 Adoni, Anakapalle, Anantapur, Anaparthi, Araku,
Pradesh Bapatla, Bhimavaram Town, Bobbili Jn,
Chipurupalli, Chirala, Chittoor, Cuddapah, Cumbum,
Dharmavaram, Dhone, Donakonda, Duvvada,
Elamanchili, Eluru, Giddalur, Gooty, Gudivada ,
Gudur, Gunadala , Guntur, Hindupur, Ichchpuram,
Kadiri, Kakinada Town Jn, Kottavalasa Jn,
Kuppam, Kurnool city, Macherla, Machilipatnam,
Madanapalle Road, Mangalagiri, MantralayamState No. of Names of Stations
Stations
Road, Markapur Road, Nadikude Jn, Nandyal Jn,
Narasapur, Narasaraopet, Naupada Jn, Nellore,
Nidadavolu Jn, Ongole, Pakala Jn, Palasa,
Parvatipuram, Piduguralla, Piler, Rajahmundry,
Rajampet, Rayanapadu, Renigunta, Repalle,
Samalkot, Sattenapalle, Satya Sai Prashanti
Nilayan, Simhachalam, Singaraykonda, Sri
Kalahasti, Srikakulam Road, Sullurpeta,
Tadepalligudem, Tadipatri, Tenali , Tirupati, Tuni,
Vijayawada, Vinukonda, Vishakhapatnam,
Vizianagaram Jn.
Completed Stations:
Development works at railway stations under Amrit Bharat Station Scheme
in Andhra Pradesh have been taken up at a good pace. The detail of
stations completed in Andhra Pradesh is as given below:
State No. of Names of Stations
Stations
Andhra 6
Kakinada Town Jn, Mangalagiri, Nidadavolu
Pradesh
Jn., Rayanapadu, Sullurpeta, Tuni
The activities for development at other stations have also been taken up at
good pace and progress of some of above stations is as given below:
Tirupati station: The structural framework of new second entry
station building on South side, 2 nos. air concourses and sewagetreatment plant have been completed. The finishing works of new
second entry station building on South side and air concourses,
structural work of station building on North side, platform shelter,
lift, escalator etc. have been taken up.
Nellore station: The structural framework, brickwork and plastering
of station building on both East and West sides have been completed.
The finishing works of station building on both East and West side
and air concourse, extension work of subway, parking, water tanks
and sewage treatment plant have been taken up.
Samalkot station: The works of improvement of platform surfacing at
platform no. 1 and platform shelter at platform no. 2/3 have been
completed. The works of improvement of existing station building
elevation, entrance porch, AC waiting hall, new toilet block, circulating
area, parking, lift and 12 m Foot Over Bridge have been taken up.
Singaraykonda station: The works of platform surfacing, platform
shelter, waiting hall, modular toilet, improvement of existing booking
office have been completed. The works of improvement of existing
station building, circulating area, parking, lift and 12m Foot Over Bridge
have been taken up.
Ongole station: The works of platform shelter and improvement of
platform surfacing have been completed. The works of waiting hall,
toilet, circulating area, parking and 12 m Foot Over Bridge have been
taken up.
Proposals / requests / suggestions / representations, both formal and
informal for Railway projects / works across the country are received on
the basis of demands raised by State Governments, Members ofParliament, Ministries of Central Government, elected representatives,
Railways' own requirements, organizations / rail users etc., at various
levels including Railway Board, Zonal Railways, Division Office etc. Receipt
of such suggestions / representations is a continuous and dynamic process
and these are examined and action as found feasible and justified is taken
from time to time.
Development / Upgradation / Modernization of stations including under
Amrit Bharat Station Scheme is generally funded under Plan Head-53
‘Customer Amenities’. The details of allocation of funds for development
and maintenance of stations are maintained Zonal Railway-wise and not
Work-wise or Station-wise. Passenger amenities are generally funded under
Plan Head-53 ‘Customer Amenities’. Andhra Pradesh is covered under the
jurisdiction of four railway zones, namely East Coast Railway, Southern
Railway, South Central Railway and South Western Railway. For these
zones, an allocation of ₹ 3,481 crore has been made for the financial year
2025–26, out of which an expenditure (up to February, 2026) of ₹ 3,393
crore has been incurred so far.
Development / Upgradation of railway stations is complex in nature
involving safety of passengers & trains and requires various statutory
clearances such as fire clearance, heritage, tree cutting, airport clearance
etc. The progress also gets affected due to brownfield related challenges
such as shifting of utilities (involving water/sewage lines, optical fibre
cables, gas pipe lines, power/signal cables, etc.), infringements, operation
of trains without hindering passenger movement, speed restrictions due to
works carried out in close proximity of tracks and high voltage power lines,
etc. and these factors affect the completion time.
*****