See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 5489
TO BE ANSWERED ON 25.03.2026
ABSS FOR TELANGANA
5489. SHRI GODAM NAGESH:
Will the Minister of RAILWAYS be pleased to state:
(a) the details of railway stations selected for redevelopment under the
Amrit Bharat Station Scheme across the country particularly in
Telangana, State/UT-wise;
(b) the number of railway stations in Telangana identified under the said
scheme and the present status of their redevelopment;
(c) the funds allocated and utilised for station redevelopment in the said
State during the last three years; and
(d) the facilities proposed to be developed at these stations such as
passenger amenities, accessibility features, digital services and
multimodal connectivity?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (d) Ministry of Railways has launched Amrit Bharat Station Scheme
for redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their implementation
in phases to improve the stations. The master planning includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement, water booths
§ Page 1 of 6 Provision of wider foot over bridge/air concourse commensurate with
passenger traffic
Provision of lift/escalators/ramp
Improvement /Provision of platform surface and cover over platforms
Provision of kiosks for local products through schemes like ‘One Station
One Product’
Parking areas, Multimodal integration
Amenities for Divyangjans
Better passenger information systems
Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity at each
station.
The scheme also envisages sustainable and environment friendly solutions,
provision of ballastless tracks etc. as per necessity, phasing and feasibility
and creation of city centre at the station in the long term.
So far, 1338 stations have been identified for development under Amrit
Bharat Station Scheme, out of which 40 stations are located in Telangana.
The names of stations identified for development under Amrit Bharat
Station Scheme in Telangana are as following:
State No. of Names of Stations
Stations
Telangana 40 Adilabad, Basar, Begumpet, Bhadrachalam
Road, Gadwal, Hafizpeta, Hi-tech city,
Huppuguda, Hyderabad, Jadcherla,
Jangaon, Kacheguda, Kamareddi,
Karimnagar, Kazipet Jn, Khammam,
Page 2 of 6State No. of Names of Stations
Stations
Lingampalli, Madhira, Mahbubabad,
Mahbubnagar, Malakpet, Malkajgiri Jn,
Manchiryal, Medak, Medchal, Miryalaguda,
Nalgonda, Nizamabad Jn, Peddapalli Jn,
Ramagundam, Secunderabad, Shadnagar,
Sri Bala Brahmeswara Jogulamba, Tandur,
Umdanagar, Vikarabad, Warangal, Yadadri,
Yakutpura, Zahirabad
Completed Stations:
Development works at railway stations under Amrit Bharat Station Scheme
in Telangana have been taken up at a good pace. The detail of stations
completed in Telangana is as given below:
State No. of Name of Stations
Stations
Begumpet, Hafizpeta, Karimnagar,
Telangana 6 Ramagundam, Sri Bala Brahmeswara
Jogulamba, Warangal
The activities for development at other stations have also been taken up at
good pace and progress of some of the stations is as given below:
Telangana:
Hi-Tech City station: The works of platform shelter, waiting hall,
modular toilet, booking counter, lift, escalator and 12 m Foot Over
Page 3 of 6Bridge have been completed. The works of new station building, new
entrance porch, platform surfacing, circulating area and parking have
been taken up.
Kazipet Junction station: The works of platform shelter, improvement of
general waiting hall, toilet, lift, escalator and 12 m Foot Over Bridge
have been completed. The works of improvement of station building,
new porch, improvement of platform surface, AC waiting hall,
circulating area and parking have been taken up.
Madhira station: The works of portico, platform shelter, platform
surfacing, improvement of waiting hall, improvement of toilet and
parking have been completed. The works of circulating area and 12 m
Foot Over Bridge have been taken up.
Mahbubabad station: The works of improvement of station building,
portico, platform shelter at platform no. 1, improvement of existing
general waiting hall, improvement of AC waiting hall and toilet have
been completed. The works of platform shelter at platform no. 2/3,
platform surfacing, circulating area, parking, lift and 12 m Foot Over
Bridge have been taken up.
Nalgonda station: The works of platform shelter, improvement of
waiting hall, toilet block, lift of existing Foot Over Bridge, circulating
area and parking have been completed. The works of improvement of
station building, new entrance porch, entry/exit gate, signages and 12 m
Foot Over Bridge have been taken up.
Page 4 of 6Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways is a continuous and ongoing process and works
in this regard are undertaken as per requirement, subject to inter-se
priority and availability of funds. Development / redevelopment /
upgradation / modernisation of a station is carried out based on category
of station/condition/traffic handled etc.
Indian Railways is committed to make its railway stations accessible for
Persons with Disabilities (Divyangjans) and passengers with reduced
mobility as part of “Sugamya Bharat Mission” or ‘Accessible India
Campaign’ of Government of India. In compliance of the Rights of Persons
with Disabilities Act, 2016, “Guidelines on accessibility of Indian Railway
stations and facilities at stations for differently abled persons
(Divyangjans) and passengers with reduced mobility” have been circulated
and notified in the Gazette of India. The guidelines include provisions of
facilities for Divyangjans and passengers with reduced mobility such as
entrance ramps, accessible parking, low height ticket counters/help
booths, toilets, drinking water booths, subways/foot over bridges with
ramps/lifts, standard signages including Braille signages and tactile
pathways for visual impairment, etc. which have been taken up for
implementation in a phased manner and on the principles of reasonable
accommodation.
Development / Upgradation of stations is complex in nature involving safety
of passengers & trains and requires various statutory clearances such as
fire clearance, heritage, tree cutting, airport clearance etc. The progress
also gets affected due to brownfield related challenges such as shifting of
utilities (involving water/sewage lines, optical fibre cables, gas pipe lines,
power/signal cables, etc.), infringements, operation of trains without
hindering passenger movement, speed restrictions due to works carried out
Page 5 of 6in close proximity of tracks and high voltage power lines, etc. and these
factors affect the completion time.
Development / upgradation / modernisation of stations including under
Amrit Bharat Station Scheme is generally funded under Plan Head-53
‘Customer Amenities’. The details of allocation and expenditure under Plan
Head-53 are maintained Zonal Railway-wise and not work-wise, or station-
wise or state-wise. Telangana is covered under the jurisdiction of South
Central Railway. For this zone in last two years and the current year, ₹
2,935 crore has been allocated (revised estimate) while an expenditure of ₹
2,940 crore has been incurred during the last two years and current year
(up to February, 2026).
*****
Page 6 of 6