**Executive Summary**
The document is a response to the Lok Sabha Unstarred Question No. 605 regarding all-weather roads under the Pradhan Mantri Gram Sadak Yojana (PMGSY), answered on 03/02/2026. It details various aspects of the PMGSY scheme, including its objectives, features, fund allocation, and quality control mechanisms. The completion timeline for PMGSY-IV is March 2029.
**Key Points / Main Content**
* **PMGSY Overview:**
* Launched as a one-time special intervention to provide rural connectivity.
* PMGSY-II (2013) for upgradation of selected routes and PMGSY-III (2019) for consolidation.
* PMGSY-IV (2024) aims to connect 25,000 unconnected rural habitations with specified population criteria, with completion by March 2029.
* **Connectivity and Coverage:**
* Focus on connecting habitations, not just villages or hamlets.
* PMGSY-I achieved near-universal coverage with only 541 habitations remaining unconnected nationwide as of 28.01.2026.
* All 1,985 eligible habitations in Tamil Nadu have been provided with all-weather road connectivity under PMGSY-I.
* No unconnected habitations reported in Kallakurichi and Arani Lok Sabha Constituencies.
* **Salient Features of PMGSY:**
* Decentralized, evidence-based planning using Indian Road Congress (IRC) standards.
* Dedicated implementation mechanism involving NRIDA, SRRDA, and PIUs.
* Detailed Project Reports (DPRs) are scrutinized by State Technical Agencies, Principal Technical Agencies, and NRIDA.
* Strong IT backbone for monitoring and implementation (OMMAS, GEPNIC, eMARG, GIS applications).
* Three-tier Quality Management System, Grievance Redressal Mechanism, and unbroken flow of funds.
* Includes 5-year inbuilt maintenance with contractor performance guarantee.
* **Fund Allocation and Release:**
* Allocation based on State proposals, works in hand, execution capacity, and available unspent funds.
* Fund allocation, release, and expenditure details for Kallakurichi and Arani Constituencies are provided for the last five years.
* Annexure-III provides State-wise details of fund released and expenditure incurred during the last five years.
* **Quality Assurance:**
* Three-tier quality management mechanism: in-house control, State Quality Monitors (SQMs), and National Quality Monitors (NQMs).
* Periodic inspections by independent monitors with a well-defined Online Management, Monitoring and Accounting System.
* State-wise details of quality inspections by NQMs and SQMs are given in Annexure-IV.
* **Inclusivity and Accessibility:**
* Roads cater to the access needs of the entire population in the target habitation.
* Integration of road connectivity components with DhartiAabaJanjatiya Gram Utkarsh Abhiyan (DA-JGUA) and Pradhan MantriAnusuchitJaatiAbhyudayYojana (PM-AJAY) with PMGSY-IV.
* PMGSY-IV incorporates guidelines to integrate accessibility standards, promoting inclusivity and road safety.
**Impact Analysis**
**Stakeholder: Government of India (Ministry of Rural Development)**
* **Impact:** Responsible for the planning, funding, and oversight of the PMGSY scheme.
* **Action Required:** Continue monitoring and evaluating the implementation of PMGSY, particularly PMGSY-IV, to ensure timely completion and adherence to quality standards.
**Stakeholder: State Governments (including Tamil Nadu)**
* **Impact:** Responsible for implementing the PMGSY scheme at the state level, including project planning, execution, and quality control.
* **Action Required:** Prepare and submit proposals for fund allocation, ensure efficient execution of projects, maintain quality standards, and comply with the accessibility guidelines for persons with disabilities.
**Stakeholder: Rural Population/Habitations**
* **Impact:** Beneficiaries of the scheme, with improved access to all-weather roads and enhanced socio-economic opportunities.
* **Action Required:** Utilize the Grievance Redressal Mechanism (MeriSadak App) to report any issues or concerns related to road quality and accessibility.
Key Entities Referenced
Pradhan Mantri Gram Sadak Yojana (PMGSY): A government scheme to provide all-weather road connectivity to eligible unconnected habitations in rural areas. Includes multiple phases: PMGSY-I, PMGSY-II, PMGSY-III and PMGSY-IV
Ministry of Rural Development: The Indian government ministry responsible for implementing the PMGSY scheme.
Tamil Nadu: A state in India where the impact and implementation of PMGSY are specifically addressed in the document, along with constituencies within the state.
National Rural Infrastructure Development Agency (NRIDA): An agency involved in the implementation mechanism and quality control of PMGSY.
GOVERNMENT OF INDIA
MINISTRY OF RURAL DEVELOPMENT
DEPARTMENT OF RURAL DEVELOPMENT
LOK SABHA
UNSTARRED QUESTION NO. 605
ANSWERED ON 03/02/2026
ALL-WEATHER ROADS UNDER PMGSY
605. Shri Malaiyarasan D:
Shri Tharaniventhan M S:
Will the Minister of RURAL DEVELOPMENT be pleased to state:
(a) the details and features of the Pradhan Mantri Gram
SadakYojana (PMGSY) including its objectives and scope of
providing all-weather road connectivity to villages of the
country, State-wise especially in Kallakurichi and
AraniLokSabha Constituencies of Tamil Nadu;
(b) the number of villages lacking all-weather road connectivity
under PMGSY and the timeline by which these gaps are
expected to be addressed, State-wise including Tamil Nadu;
(c) the details of funds sanctioned, allocated and utilized under
the said scheme, State-wise including Tamil Nadu during the
last three to five years especially in Kallakurichi and
AraniLokSabha Constituencies;
(d) the steps taken by the Government to ensure the quality and
durability of PMGSY roads especially in flood-prone, remote
and tribal areas, State-wise including Tamil Nadu particularly
in AraniLokSabha Constituency;
(e) whether the Government is conducting independent quality
audits of roads built under PMGSY, if so, the key findings of
such audits;
(f) the manner in which the Government is ensuring that PMGSY
roads are inclusive and accessible to remote tribal areas,
flood-prone zones and border regions especially in Kallakurichi
and AraniLokSabha Constituencies; and
(g) the measures being taken to ensure that PMGSY roads are
inclusive, safe and accessible for all including women, the
elderly and persons with disabilities in all States including
Tamil Nadu?
Page 1 of 10ANSWER
MINISTER OF STATE IN THE MINISTRY OF RURAL DEVELOPMENT
(SHRI KAMLESH PASWAN)
(a)&(b): Pradhan Mantri Gram SadakYojana (PMGSY) was
launched as a one-time special intervention to provide rural
connectivity, by way of a single all-weather road, to the eligible
unconnected habitations of designated population size (500+ in
plain areas and 250+ in North-Eastern States, Himalayan States,
Desert and Tribal Areas as per 2001 census) in the core network for
uplifting the socio-economic condition of the rural population. In the
critical Left Wing Extremism affected blocks (as identified by
Ministry of Home Affairs), additional relaxation has been given to
connect habitations with population of 100 persons and above
(2001 census). As the programme unfolded, a need was felt for
consolidation of the existing rural road Network to improve its
efficiency not only as a provider of transportation services but also
as a vehicle for social and economic development. Accordingly, in
the year 2013, PMGSY-II was launched for upgradation of selected
through Routes and Major Rural Link with a target to upgrade
50,000 km in various states and Union Territories. In the year 2019,
Government launched PMGSY-III for consolidation of 1,25,000 km
Through Routes and Major Rural Links connecting inter-alia, to
Gramin Agriculture Market(GrAMs), higher secondary Schools and
Hospitals.
In the year 2024, the Government has launched PMGSY-IV to
provide all-weather connectivity to 25,000 unconnected rural
habitations of population size 500+ in plains, 250+ in NE & Hill
Sates/UTs, special category areas (Tribal Schedule V, Aspirational
Districts/Blocks, Desert areas) and 100+ in LWE affected districts,
as per Census 2011. The timeline for completion of PMGSY-IV is
March 2029. These habitations have become eligible due to their
population increase.
The unit for connectivity under PMGSY-I is ‘Habitation’ and not
a Revenue Village or Gram Panchayat or hamlet.
The Ministry of Rural Development, through PMGSY-I has been
steadily working towards achieving universal all-weather road
connectivity to all eligible rural habitations across the country,
including Tamil Nadu. As on 28.01.2026, PMGSY-I achieved near-
universal coverage, with only 541 habitations remaining
unconnected, out of 1,63,288 identified eligible habitations
nationwide. In the State of Tamil Nadu, all 1,985 eligible habitations
Page 2 of 10have already been provided with all-weather road connectivity
under PMGSY-I. The State/UT-wise numbers of habitations
connected under PMGSY-I are given at Annexure-I.
Salient Features of PMGSY
Decentralized, evidence based planning
Standards and specifications as per Indian Road Congress
(IRC) and Rural Roads Manual
Dedicated Implementation Mechanism: National Rural
Infrastructure Development Agency (NRIDA), State Rural Road
Development Agency (SRRDA) and Project Implementation
Units (PIUs)
Detailed Project Reports (DPRs) scrutiny by State Technical
Agencies, Principal Technical Agencies and NRIDA
Strong IT backbone for monitoring and implementation (Online
Management, Monitoring and Accounting System (OMMAS),
Government e-Procurement System of NIC (GEPNIC),
Electronic Maintenance of Rural Roads under PMGSY (eMARG),
Geographic Information System (GIS) applications)
Three-tier Quality Management System
Grievance Redressal Mechanism (MeriSadak App)
Unbroken flow of funds
5 year inbuilt maintenance included with performance
guarantee of contractor
Parliamentary constituency-wise data is not maintained in the
Ministry. As per the report shared by the State there are no
unconnected habitations in Kallakurichi and AraniLokSabha
Constituency.
The State/UT wise (including Tamil Nadu) details of habitations
survey conducted under PMGSY-IV are given at Annexure-II. The
sunset date for PMGSY-IV is March 2029.
(c): The allocation/release of funds to the States for
implementation of PMGSY is done on the basis of the proposal
received from the State and depends, inter-alia, on works in hand,
execution capacity of the State and unspent funds available with it.
The details of Central share released to the States/UTs and
expenditure incurred (including State share) during last five years
are given in Annexure-III. Parliamentary constituency-wise data is
not maintained within the Ministry. As reported by the State, the
details of funds allocated, released and expenditure incurred in
Page 3 of 10respect of Kallakurichi Constituency and Arani Constituency during
the last five years are as below:
Constituency Allocation Released Expenditure
(Rs.in crore) (Rs.in crore) (Rs.in crore)
Kallakurichi 256.01 250.92 223.76
Arani 263.16 263.16 199.12
(d)&(e): To ensure the quality and durability of PMGSY roads
especially in flood-prone, remote and tribal areas, a three-tier
Quality Management mechanism has been put in place under
PMGSY:
The 1st tier of quality management mechanism is the in-house
quality control system of the Project Implementation Unit
(PIU).
The 2nd tier of the quality management mechanism is through
periodical inspections of all works by the State Quality
monitors (SQMs), independent of PIUs.
Under the 3rd tier, National Rural Infrastructure Development
Agency deploys National Quality Monitors (NQMs), for
inspection of road works, selected at random, to assess the
general quality in the district/ State.
Periodic quality inspections by independent monitors under 2nd
and 3rd tier of quality control mechanism are conducted. A well
defined Online Management, Monitoring and Accounting System is
used for monitoring quality of PMGSY projects assessed by these
independent quality monitors that helps in real time monitoring and
brings transparency in ensuring the quality infrastructure in rural
areas. The State-wise details of quality inspections conducted by
NQMs and SQMs and unsatisfactory grading marked by them for
period during 2024-25 and 2025-26 (till 28.01.2026) are given in
Annexure-IV.
(f)&(g): PMGSY-I was launched by the Government of India, as a
part of the poverty reduction strategy, as a Centrally Sponsored
Scheme to assist the states, though 'Rural Roads' is a State
Subject. PMGSY is an area development programme and the
objective of the scheme is to provide all-weather road connectivity
Page 4 of 10in rural areas catering to the access needs of the entire population
of the target habitation. PMGSY is not an individual/ community
centric scheme. The roads constructed under PMGSY cater to all
the strata of the society. Nevertheless, Scheduled Tribes Areas
have got specific focus in the scheme by giving special
dispensation. While eligibility criteria for other habitations for
getting connectivity under the scheme is a population of 500
persons (as per 2001 census under PMGSY-I and as per Census 2011
under PMGSY-IV), for Tribal (Schedule V) areas and Selected Tribal
and Backward Districts (as identified by the Ministry of Home
Affairs and Planning Commission) and for North-Eastern and
Himalayan States, unconnected habitations with a population of
250 and above are eligible for providing all-weather road
connectivity under the scheme.
Further, the Government has also integrated the road
connectivity components of the DhartiAabaJanjatiya Gram
UtkarshAbhiyan (DA-JGUA) and the Pradhan
MantriAnusuchitJaatiAbhyudayYojana (PM-AJAY) through
convergence with PMGSY-IV. This convergence framework applies
to all States and Union Territories. Under this model, priority is
given to unconnected habitations identified under DA-JGUA that
have a population of 500 or more with at least 50% Scheduled Tribe
population, or those in Aspirational Districts with a population of
250 or more including at least 50 Scheduled Tribe members.
Similarly, under PM-AJAY, priority is extended to unconnected
habitations with a population of 500 or more and at least 40%
Scheduled Caste population as per Census 2011. In addition to the
above, road connectivity component of Pradhan
MantriJanjatiAdivasiNyayaMahaAbhiyan (PM-JANMAN) is also being
implemented as a separate vertical under PMGSY. A total of 8000
Km of road length are to be constructed under the scheme to
provide connectivity to the habitations of Particularly Vulnerable
Tribal Groups(PVTG).
Under PMGSY-IV, necessary guidelines have been
incorporated to integrate accessibility standards in road
construction under PMGSY which is crucial for promoting inclusivity
and improving road safety. Features such as curb ramps, tactile
paving, and accessible pedestrian crossings benefits not only
persons with disabilities but also all the users and simultaneously
enhance safety for pedestrians, cyclists, and motorist as well. The
States have been directed that while preparing DPRs, the
Page 5 of 10"Accessibility Guidelines for Persons with Disabilities (PWDs) for
Rural Roads" are to be followed.
*****
Page 6 of 10Annexure-I
Annexure referred to in reply to parts (a) &(b) of LokSabhaUnstarred
Question No. 605 for answer on 03.02.2026
State-wise details of habitations connected under PMGSY-I (as on
28.01.2026)
Sr.
Total Eligible Habitation Connected
No.
State/UT Name
(Nos.)
1 Andaman And Nicobar 7
2 Andhra Pradesh 1,422
3 Arunachal Pradesh 616
4 Assam 13,719
5 Bihar 31,280
6 Chhattisgarh 10,628
7 Gujarat 3,047
8 Haryana 1
9 Himachal Pradesh 2,555
10 Jammu And Kashmir 2,132
11 Jharkhand 10,933
12 Karnataka 295
13 Kerala 401
14 Madhya Pradesh 17,493
15 Maharashtra 1,417
16 Manipur 622
17 Meghalaya 585
18 Mizoram 231
19 Nagaland 107
20 Odisha 16,991
21 Punjab 389
22 Rajasthan 15,963
23 Sikkim 350
24 Tamil Nadu 1,985
25 Tripura 1,979
26 Uttar Pradesh 11,748
27 Uttarakhand 1,860
28 West Bengal 13,224
29 Telangana 703
30 Ladakh 64
Total 162,747
Page 7 of 10Annexure-II
Annexure referred to in reply to parts (a) &(b) of LokSabhaUnstarred
Question No. 605 for answer on 03.02.2026
Habitations surveyed in GSS application as per PMGSY-IV eligibility
criteria by the State Governments (as on 29.01.2026)
Name of State/UT Eligible habitation as Approved as eligible for
approved by States consideration
under PMGSY-IV by NRIDA
Andaman And
0
Nicobar 0
Andhra Pradesh 413 201
Arunachal
192 184
Pradesh
Assam 4623 3610
Bihar 103 93
Chhattisgarh 2692 1981
Gujarat 2624 2087
Himachal Pradesh 1021 907
Jammu And
2278 2276
Kashmir
Jharkhand 2786 2335
Karnataka 85 53
Kerala 2336 2211
Ladakh 31 18
Madhya Pradesh 9260 9177
Maharashtra 196 119
Manipur 303 271
Meghalaya 377 329
Mizoram 63 63
Nagaland 239 150
Odisha 2682 1676
Punjab 1 1
Rajasthan 1740 1686
Sikkim 283 237
Tamil Nadu 5 4
Telangana 173 93
Tripura 435 435
Uttar Pradesh 2181 2100
Uttarakhand 885 880
West Bengal 2862 1164
Total 40,869 34,341
Page 8 of 10Annexure-III
Annexure referred to in reply to part (c) of LokSabhaUnstarred Question No. 605
for answer on 03.02.2026
State-wise details of fund released and expenditure incurred during last five
years
S.N State 2020-21 2021-22 2022-23 2023-24 2024-25
o Releas Expenditu Releas Expenditu Releas Expenditu Releas Expenditu Releas Expenditu
e re e re e re e re e re
(including (including (including (including (including
State State State State State
Share) Share) Share) Share) Share)
1 Andaman 0.00 3.78 9.22 5.45 12.22 7.51 12.22 22.93 0.05 3.97
& Nicobar
2 Andhra 53.20 396.75 50.00 508.86 644.13 748.63 140.64 368.03 507.32 370.60
Pradesh
3 Arunachal 952.31 1,429.61 1090.6 1,279.07 1018.7 1,246.99 339.90 320.09 609.00 726.10
Pradesh 0 4
4 Assam 2516.6 2600.19 1591.5 2,488.03 664.91 1,118.21 391.29 571.22 79.24 264.76
2 0
5 Bihar 49.13 2173.52 375.00 1,992.99 1443.2 2,088.54 963.37 1,815.63 1195.4 2,312.80
3 4
6 Chattisgar 924.48 1985.94 394.41 1,902.34 995.87 1,057.35 401.77 388.09 325.24 413.71
h
7 Goa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 Gujarat 79.08 133.32 195.50 400.16 266.63 492.19 298.41 330.33 220.65 361.22
9 Haryana 0.00 92.10 353.23 583.12 168.25 213.81 74.01 150.86 27.38 34.60
10 Himachal 745.24 1061.00 517.45 933.22 624.76 626.84 617.56 371.54 634.82 904.14
Pradesh
11 Jammu & 1727.3 932.37 1328.3 1,485.28 717.00 1,114.78 1304.1 1,256.96 1028.2 1,070.58
Kashmir 0 4 7 5
12 Jharkhand 293.50 1083.34 0.00 598.44 332.63 745.63 752.80 1,323.90 961.77 1,374.96
13 Karnataka 49.29 728.40 704.25 1,499.18 720.47 864.71 72.25 404.03 100.58 142.81
14 Kerala 89.97 71.76 0.00 46.91 106.76 124.97 54.25 164.95 122.27 249.15
15 Ladakh 50.00 514.73 140.79 109.66 109.97 107.81 37.50 30.44 113.81 111.33
16 Madhya 1099.5 2166.99 1392.2 2,419.14 1557.4 1,978.73 599.42 1,105.16 703.29 966.83
Pradesh 4 5 7
17 Maharasht 0.00 221.59 0.00 376.73 743.00 1,074.02 1110.8 1,507.37 854.93 1,524.10
ra 0
18 Manipur 420.66 601.46 742.00 710.58 744.98 539.11 161.29 296.83 2.81 88.75
19 Meghalaya 355.29 473.71 483.92 536.92 405.89 373.72 122.59 238.19 219.62 375.61
20 Mizoram 1.59 277.32 74.34 332.86 584.20 315.94 141.37 381.62 87.50 45.78
21 Nagaland 72.89 144.70 145.31 125.83 183.15 198.65 161.29 94.01 2.25 30.50
22 Odisha 774.29 1754.13 404.12 1,795.5 1235.8 2,088.9 1262.5 1,589.8 712.39 734.9
8 5
23 Puducherr 0.00 0.00 11.66 0.00 24.72 27.08 0.27 11.89 25.00 -0.10
y
24 Punjab 0.00 2.67 68.59 295.14 231.06 428.72 265.10 522.95 319.87 328.82
25 Rajasthan 237.15 492.13 917.51 1,452.64 199.90 372.38 404.79 633.09 450.46 933.32
26 Sikkim 195.50 178.52 107.28 177.89 263.33 230.34 94.37 130.13 70.00 148.98
27 Tamil 265.38 626.92 440.00 1,169.56 613.70 532.36 411.36 777.78 638.66 741.43
Nadu
28 Telangana 0.00 288.59 86.38 410.80 321.43 345.32 296.96 479.41 132.57 399.90
25
29 Tripura 69.57 99.25 73.88 202.93 267.59 152.90 185.03 112.64 172.75 98.07
30 Uttar 123.90 440.19 1418.5 2,074.26 2068.5 3,267.32 2679.6 3,791.65 1968.6 2,704.11
Pradesh 5 7 3 0
31 Uttarakha 1536.2 1493.50 787.00 1,218.45 1297.1 1,350.02 551.05 800.68 815.50 934.09
nd 7 6
32 West 969.31 1471.94 49.94 701.28 381.03 394.75 99.275 309.11 225.00 271.11
Bengal
Total 13651. 23940.42 13952. 27,833.22 18948. 24,228.27 14007. 20,301.27 13327. 18,666.94
46 99 61 29 03
Page 9 of 10Annexure-IV
Annexure-IV referred to in reply to parts (d) & (e) of
LokSabhaUnstarred Question No. 605 for answer on 03.02.2026
Number of inspections conducted by SQMs and NQMs and
unsatisfactory grading by them since April 2024 to 28.01.2026
Name of National Quality Monitors
State Quality Monitors (SQMs)
State/UT (NQMs)
Number of Unsatisfactory Number of Unsatisfactory
Inspections (%) Inspections (%)
A& N Islands 29 24.1 8 25.0
Andhra
1281 2.5 277 2.2
Pradesh
Arunachal
1233 4.1 209 38.3
Pradesh
Assam 2775 4.8 365 22.7
Bihar 7122 14.4 689 19.9
Chhattisgarh 3813 0.8 571 7.9
Gujarat 1092 7.2 66 16.7
Haryana 397 9.8 65 16.9
Himachal
2659 19.1 285 23.9
Pradesh
Jammu &
1953 11.8 222 13.5
Kashmir
Jharkhand 2406 2.1 598 19.4
Karnataka 1324 2.2 139 11.5
Kerala 679 9.6 133 15.8
Ladakh 214 4.2 30 3.3
Madhya
6383 6.8 571 8.6
Pradesh
Maharashtra 2040 1.7 488 8.2
Manipur 58 5.2 111 45.0
Meghalaya 621 6.4 218 22.9
Mizoram 329 11.6 75 41.3
Nagaland 60 13.3 72 45.8
Odisha 4120 27.2 685 32.0
Puducherry 28 3.6 0 0
Punjab 903 5.9 129 14.73
Rajasthan 1516 9.9 286 3.85
Sikkim 350 2.6 75 21.33
Tamil Nadu 2764 4.2 253 9.88
Telangana 524 1.3 229 17.47
Tripura 308 21.1 87 19.54
Uttar Pradesh 5587 4.8 677 12.11
Uttarakhand 2087 20.3 291 26.46
West Bengal 2498 20.8 358 18.44
Total 57153 9.8 8262 17.57
*****
Page 10 of 10