GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
STARRED QUESTION NO. 241
TO BE ANSWERED ON 17.12.2025
AMRIT BHARAT STATION SCHEME
*241. SHRI NABA CHARAN MAJHI:
SHRI GODAM NAGESH:
Will the Minister of RAILWAYS be pleased to state:
(a) the details of the stations approved under the Amrit Bharat
Station Scheme (ABSS) till date, State-wise particularly in the
States of Jammu & Kashmir and Jharkhand and in the Shahdol and
Sidhi Lok Sabha Constituencies;
(b) the total expenditure incurred so far under ABSS and the
estimated budgetary requirement for completion of the projects
related to all the approved stations;
(c) the details of the master plans formulated for the said stations
and the major updates/changes incorporated to the said plan during
the year 2024-25;
(d) the details of the number of the stations where physical work
has been started, completed and are in pre-construction stage,
status-wise;(e) whether the redevelopment under ABSS is likely to increase
passenger handling capacity, commercial revenue and local
employment and if so, the expected quantitative outcomes thereof;
(f) the number of stations selected/covered under the said scheme
in Sidhi Lok Sabha Constituency; and
(g) the time by which the said work is likely to be completed in the
said Constituencies along with the status of work?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (g) A Statement is laid on the Table of the House.
*****STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (g) OF LOK
SABHA STARRED QUESTION NO. 241 TO BE ANSWERED ON
17.12.2025
(a) to (g) Ministry of Railways has launched Amrit Bharat Station
Scheme for redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their
implementation in phases to improve the stations. The master
planning includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement,
water booths
Provision of wider foot over bridge/air concourse
commensurate with passenger traffic
Provision of lift/escalators/ramp
Improvement /Provision of platform surface and cover over
platforms
Provision of kiosks for local products through schemes like
‘One Station One Product’
Parking areas, Multimodal integration
Amenities for Divyangjans
Better passenger information systems
Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity at
each station.The scheme also envisages sustainable and environment friendly
solutions, provision of ballastless tracks etc. as per necessity,
phasing and feasibility and creation of city centre at the station in
the long term. Development of stations into city centres envisages
enhanced economic activities at and around the stations apart from
improved travel experience.
So far, 1,337 stations have been identified for development under
the Amrit Bharat Station Scheme. Out of these, 04 stations are
located in Jammu and Kashmir, 57 stations are located in
Jharkhand and 80 stations are located in Madhya Pradesh. These
include Anuppur, Bijuri, Shahdol and Umaria stations situated in
Shahdol Lok Sabha Constituency and Bargawan, Beohari and
Singrauli stations situated in Sidhi Lok Sabha Constituency.
The name of stations identified under Amrit Bharat Station Scheme
in Jammu and Kashmir, Jharkhand and Madhya Pradesh are as
following:
No. of
State Name of Stations
Stations
Budgam, Jammu Tawi, Martyr Captain
Jammu and
04 Tushar Mahajan, Shri Mata Vaishno Devi
Kashmir
Katra
Balsiring, Bano, Barajamda Jn, Barkakana,
Basukinath, Bhaga, Bokaro Steel City,
Jharkhand 57
Chaibasa, Chakradharpur, Chandil,
Chandrapura, Daltonganj, Dangoaposi,No. of
State Name of Stations
Stations
Deoghar, Dhanbad, Dumka, Gamharia,
Gangaghat, Garhwa Road, Garhwa Town,
Ghatsila, Giridih, Godda, Govindpur Road,
Haidar Nagar, Hatia, Hazaribagh Road,
Jamtara, Japla, Jasidih Jn, Katrasgarh,
Koderma Jn, Kumardubi, Latehar, Lohardaga,
Madhupur Jn, Manoharpur, Muhammad Ganj,
Muri Jn, N.S.C.B. Jn Gomoh, Nagar Untari,
Namkom, Orga, Pakur, Parasnath, Piska,
Rajkharswan, Rajmahal, Ramgarh Cantt,
Ranchi Jn, Sahibganj, Sankarpur, Silli, Sini,
Tatanagar, Tatisilwai, Vidyasagar
Akodia, Amla, Anuppur, Ashoknagar,
Balaghat, Banapura, Bargawan, Beohari,
Berchha, Betul, Bhind, Bhopal, Bijuri, Bina,
BiyavraRajgarh, Chhindwara, Dabra, Damoh,
Datia, Dewas, Gadarwara, Ganjbasoda,
Madhya
Ghoradongri, Guna, Gwalior, Harda,
80
Pradesh
Harpalpur, Indore Jn, Itarsi Jn, Jabalpur,
Junnor Deo, Kareli, Katni Jn, KatniMurwara,
Katni South, Khachrod, Khajuraho Jn,
Khandwa, Khirkiya, Laxmi Bai Nagar, Maihar,
Maksi Jn, Mandla Fort, Mandsor, MCS
Chhatarpur, Meghnagar, Morena, Multai,No. of
State Name of Stations
Stations
Nagda Jn, Nainpur Jn, Narmadapuram
(Hoshangabad), Narsinghpur, Nepanagar,
Nimuch, Orchha, Pandhurna, Pipariya,
Ratlam, Rewa, Ruthiyai, Sanchi, Sant
Hirdaram Nagar, Satna, Saugor, Sehore,
Seoni, Shahdol, Shajapur, Shamgarh,
Sheopur Kalan, Shivpuri, Shridham,
Shujalpur, Sihora Road, Singrauli, Tikamgarh,
Ujjain, Umaria, Vidisha, Vikramgarh Alot
Works have been completed at 160 stations. Good progress has
been achieved at the stations where works have been taken up and
progress of some of these stations is given below:
Jammu and Kashmir:
Budgam station: The works of improvement of circulating
area, parking and approach roads have been completed. The
works of porch, platform surfacing, platform shelter, waiting
room, toilet, booking office, Passenger Reservation System
office, executive lounge, retiring rooms, lifts and 12 m Foot
Over Bridge have been taken up.
Jammu Tawi station: The works of station building at second
entry, Government Railway Police building and 12 m Foot Over
Bridge at Katra end have been completed. The works ofplatform no. 4/5 and6/7, 72 m air concourse, development
towards second entry and 12 m Foot Over Bridge at Delhi end
have been taken up.
Martyr Captain Tushar Mahajan station: The works of
improvement of station building, porch, waiting room, toilet,
circulating area, parking, approach roads, lighting and signage
have been completed. The works of entry/exit gates, platform
shelter and platform surfacing at platform no. 4/5, lifts,
escalators and 6 m Foot Over Bridge have been taken up.
Jharkhand:
Muri Junction station: The works of improvement of station
building, entrance porch, new waiting hall, approach road,
circulating area, parking area, Divyangjan facilities, station
lighting and signage have been completed. The finishing works
have been taken up.
Orga station: The works of improvement of station building,
platform shelter, approach road and station lighting have been
completed. The works of platform surfacing, parking and
Divyangjan facilities have been taken up.
Bano station: The works of improvement of station building,
circulating area, approach road and Divyangjan facilities have
been completed. The works of platform shelter, platform
surfacing and Divyangjan facilities for Foot Over Bridge ramp,
toilet and drinking water booth have been taken up. Gangaghat station: The works of improvement of station
building, platform shelter, approach road and circulating area
have been completed. The works of Foot Over Bridge ramp and
Divyangjan facilities have been taken up.
Shahdol Lok Sabha Constituency:
Anuppur station: The works of improvement of station
building, entrance porch, concourse, platform shelter, raising
of platform, entry/exit gate, improvement of circulating area,
parking, Divyangjan facilities, signages and train indication
board have been completed. The works of improvement of
waiting hall, ticket counter and 12 m Foot Over Bridge have
been taken up.
Bijuri station: The works of improvement to station building,
concourse, porch, improvement of toilet, waiting hall,
circulating area, parking, Divyangjan facilities and signages
have been taken up.
Shahdol station: The works of improvement of station
building, porch, platform shelter, improvement of circulating
area, parking area and Divyangjan facilities have been
completed. The works of improvement of waiting hall,
entry/exit gate and 12m Foot Over Bridge have been taken up.
Umaria station: The works of improvement to the station
building, entrance porch, platform shelter, platform surfacing,
improvement of waiting hall, circulating area, Divyangjanfacilities and signages have been completed. The work of 12m
Foot Over Bridge has been taken up.
At Bargawan station of Sidhi Lok Sabha Constituency, the works
platform shelter and improvement of entrance porch have been
completed. The works of improvement of station building, waiting
halls, toilet, circulating area, parking, Divyangjan facilities,
signages, lift, escalator and 12 m Foot Over Bridge have been taken
up.
Further development / redevelopment / upgradation / modernisation
of stations on Indian Railways is a continuous and ongoing process
and works in this regard are undertaken as per requirement, subject
to inter-se priority and availability of funds. The priority for
development / redevelopment / upgradation / modernisation of
stations is accorded to higher category of station over lower
category of station while sanctioning and executing the works.
Master Planning is an iterative process requiring optimization and
the time frame and other details for such optimization cannot be
indicated at this stage.
Further, development / upgradation / modernization of stations
including Amrit Bharat Station Scheme is generally funded under
Plan Head–53 ‘Customer Amenities’. The details of allocation and
expenditure under Plan Head–53 are maintained Zonal Railway-wise
and not work-wise or station-wise or state-wise. The fund allocation
of ₹ 12,118 crore has been made for the financial year 2025-26
under Plan Head–53 and expenditure (up to October, 2025) of ₹7,253
crore has been incurred so far.Development / Upgradation of railway stations is complex in nature
involving safety of passengers & trains and requires various
statutory clearances such as fire clearance, heritage, tree cutting,
airport clearance etc. The progress also gets affected due to
brownfield related challenges such as shifting of utilities (involving
water/sewage lines, optical fibre cables, gas pipe lines,
power/signal cables, etc.), infringements, operation of trains
without hindering passenger movement, speed restrictions due to
works carried out in close proximity of tracks and high voltage
power lines, etc. and these factors affect the completion time.
Therefore, no time frame can be indicated at this stage.
*****