Home India ROAD TRANSPORT & HIGH WAYS Parliament Question: Bharatmala Pariyojana in Tamil Nadu...
Date: 2026-04-01 Category: RAJYASABHA_QNA State: Union Government Country: India

Parliament Question: Bharatmala Pariyojana in Tamil Nadu

Issued by ROAD TRANSPORT & HIGH WAYS · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS RAJYA SABHA UNSTARRED QUESTION NO - 4244 ANSWERED ON - 01/04/2026 BHARATMALA PARIYOJANA IN TAMIL NADU 4244. DR. M. THAMBIDURAI: Will the Minister of ROAD TRANSPORT AND HIGHWAYS be pleased to state:- (a) the progress of Bharatmala Pariyojana Phase-I as it approaches completion in March, 2026, the total length of access-controlled high-speed corridors operationalized during last five years and whether any such corridors have been developed or proposed in Tamil Nadu; (b) the impact of the Delhi-Mumbai Expressway and other major economic corridors on reducing travel time and logistics costs for industrial clusters in Western, Northern and Southern India, including Tamil Nadu; and (c) the status of the "Parvatmala" (National Ropeways Development Programme) in providing last- mile connectivity to high-altitude and major pilgrimage/tourist sites, including any proposals pertaining to Tamil Nadu? ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI) (a) Bharatmala Pariyojana Phase-I was approved by the Government in 2017 covering a length of 34,800 km across the country at an estimated outlay of Rs.5,35,000 Crore. Under the program, projects covering a total length of 26,425 km had been awarded and out of this, 22,223 km has already been constructed upto February 2026. Total length of operational access-controlled National High-Speed Corridors (HSC) / Expressways is 3,644 km in February, 2026. The details of Access Controlled Expressways /Highways taken up in Tamil Nadu during the last 5 years are enclosed as Annexure. (b) The development of Expressways and Economic Corridors, including the Delhi–Mumbai Expressway, have had a significant positive impact on reducing travel time and logistics costs wherever operational. These high-capacity, access-controlled corridors enable seamless long-haul freight movement, resulting in reduced transit time, lower fuel consumption, and decreased vehicle operating costs. They also improve reliability and efficiency of supply chains by minimizing congestion and bottlenecks on existing routes. (c) The details are enclosed as Annexure.ANNEXURE ANNEXURE REFERRED TO IN REPLY TO PART (a) OF RAJYA SABHA UNSTARRED QUESTION NO. 4244 ANSWERED ON 01/04/2026 ASKED BY DR. M. THAMBIDURAI REGARDING ‘BHARATMALA PARIYOJANA IN TAMIL NADU’ Details of Access Controlled Expressways / Highways taken up/ proposed in Tamil Nadu during the last 5 years Total Length Capital Corridor Name (in Stage Cost Km) (Rs. Cr.) Bangalore - Chennai Expressway (Tamil Nadu portion of 106 7,719 Under NE-7) Implementation 4 Laning of Tiruvallur - TN/AP Border section of NH-716 44 1,376 Under (Chennai-Tirupati Package-1) Implementation 4 laning of Walajapet/Ranipet -TN/AP Border section of 28 1,338 Under NH-40 Implementation 4 laning of Marakkanam - Puducherry section of NH- 46 2,157 Under 332A (Mahabalipuram - Pondicherry Package-III) Implementation Tiruvarur Bypass in Nagapattinam - Thanjavur section of 15 1,320 Planned, Yet to be NH-83 sanctioned Total 239 13,910ANNEXURE ANNEXURE REFERRED TO IN REPLY TO PART (c) OF RAJYA SABHA UNSTARRED QUESTION NO. 4244 ANSWERED ON 01/04/2026 ASKED BY DR. M. THAMBIDURAI REGARDING ‘BHARATMALA PARIYOJANA IN TAMIL NADU’ The details of approved Projects under National Ropeways Development Programme: S. Project Cost Status / stage State / UT Ropeway project Name Mode No. (in Rs Cr) 1 Uttar Pradesh Varanasi (3.85 km) HAM 815.58 Implementation Sangam Prayagraj (2.2 HAM 230.00 Implementation 2 Uttar Pradesh km) 3 Himachal Pradesh Bijli Mahadev (2.32 km) HAM 283.92 Implementation* Mahakaleshwar Temple, HAM 272.03 Implementation* 4 Madhya Pradesh Ujjain (1.76 km) Tikitoriya Mata Temple EPC 21.89 Implementation 5 Madhya Pradesh (0.15 km) 6 Haryana Dhosi Hill (0.88 km) HAM 67.90 Implementation Jammu and Shankaracharya Temple HAM 147.23 Bidding 7 Kashmir (1.05 km) 8 Uttarakhand Kedarnath (12.9 km) DBFOT 4081.28 Awarded Hemkund Sahib Ji (12.4 DBFOT 2730.13 Awarded 9 Uttarakhand km) Ramtek Gad Temple HAM 51.63 Bidding Stage 10 Maharashtra (0.64 km) Kamakhya Devi Temple DBFOT 213.24 Bidding Stage 11 Assam (1.43 km) *Project is being reconsidered due to local opposition. *****

Continue your research