See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 6050
TO BE ANSWERED ON 01.04.2026
COMPENSATION FOR VICTIMS OF RAIL ACCIDENTS
6050. SHRI ANTO ANTONY:
SHRI ABDUL RASHID SHEIKH:
Will the Minister of RAILWAYS be pleased to state:
(a) the number of train accidents reported in the country during the last
five years, year-wise;
(b) the number of persons injured, died and casualties reported in these
accidents during the such period, year-wise;
(c) the total amount of financial compensation announced for victims of
these accidents during such period;
(d) the number of ex-gratia/relief to the victims/family of victims;
(e) the details of victims/families who have received the financial
assistance so far in those accidents; and
(f) whether there are pending cases where compensation has not yet been
disbursed and if so, the details thereof?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (f): Safety is accorded the highest priority on Indian Railways. As a
consequence of various safety measures taken over the years, there has
been a steep decline in the number of accidents.
Number of Consequential Train Accidents has reduced as shown in the
table below:-
Year Consequential Accidents
2014-15 135
2025-26 (upto 25.03.2026) 15 (89% lesser)
Page 1 of 8
§Another important index showing improvement in safety in train operations
is Consequential Accident Index, the details of which are as under:-
Consequential Accident Index:-
Year Accident Index
2014-15 0.11
2024-25 0.03 (73% lesser)
2025-26 (upto February, 2026) 0.01
This index measures number of consequential accidents as a ratio of total
running kilometers of all trains.
No. of consequential accidents
Accident Index =
No. of trains X million kilometers run
234
s
tn
e
d
ic 165
c
A
n
ia 135
r
T
la
itn
e
u
q
e
s
n
o 55
C
fo
.o
31
N
15
2005-06 2009-10 2014-15 2019-20 2024-25 2025-26
(25th March 2026)
Consequential Train Accidents on Indian Railways and casualties (including
railway passengers and railway personnel) therein are as follows:-
No. of Consequential No. of Deaths No. of Injuries
Period
Train Accidents
2004-05 to 2013-14 1,711 904 3,155
Page 2 of 82014-15 to 2023-24 678 748 2,087
2024-25 31 18 92
2025-26(upto
15 16 28
25th March 2026)
The various safety measurestaken to enhance safety in train operations are
as under:-
1. On Indian Railways, the expenditure on Safety related activities has
increased over the years as under:-
Expenditure/Budget on Safety related activities
Year
(Rs. in Cr.)
2013-14 39,200
2022-23 87,336
2023-24 1,01,662
2024-25 1,14,022
2025-26 1,17,693
2026-27 1,20,389
2. Electrical/Electronic Interlocking Systems with centralized operation
of points and signals have been provided at 6,665 stations up to
28.02.2026 to reduce accidents due to human failure.
3. Interlocking of Level Crossing (LC) Gates has been provided at 10,153
Level Crossing Gates up to 28.02.2026 for enhancing safety at LC
Gates.
4. Complete Track Circuiting of stations to enhance safety by verification
of track occupancy by electrical means has been provided at 6,669
stations up to 28.02.2026.
5. Indian Railways has gone for implementation of indigenously developed
Automatic Train Protection (ATP) system, which required safety
certification of highest order (SIL 4). Kavach has been adopted as a
National ATP system in July 2020. Based on deployment of Kavach
Page 3 of 8version 3.2 on 1,465 RKm on South Central Railway and experience
gained, further improvements were made. Finally, Kavach specification
version 4.0 was approved by RDSO on 16.07.2024. After extensive and
elaborate trials, Kavach Version 4.0 has been successfully
commissioned on 1,638 Route Kilometres, covering the highdensity
Delhi-Mumbai and Delhi-Howrah routes as below:
S. No. Section Progress
(Route Km)
(1) Delhi–Mumbai route:
i Junction cabin – Palwal – Mathura – 667
Nagda section
ii Vadodara –Ahmedabad section 96
iii Vadodara – Virar section 336
(2) Delhi – Howrah route:
i Gaya Sarmatanr section 93
ii Chota Ambana–Bardhaman – Howrah 260
section
iii. Subedarganj – Kanpur 186
Further, track side Kavach implementation work has been taken up on
24,427 RKM covering all GQ, GD, HDN and identified sections of Indian
Railways.
6. Detailed instructions on issues related with safety of Signalling, e.g.
mandatory correspondence check, alteration work protocol,
preparation of completion drawing, etc. have been issued.
7. System of disconnection and reconnection for S&T equipment as per
protocol has been re-emphasized.
8. All locomotives are equipped with Vigilance Control Devices (VCD) to
improve alertness of Loco Pilots.
9. Retro-reflective sigma boards are provided on the mast which is
located two OHE masts prior to the signals in electrified territories to
Page 4 of 8alert the crew about the signal ahead when visibility is low due to
foggy weather.
10. A GPS based Fog Safety Device (FSD) is provided to loco pilots in fog
affected areas which enables loco pilots to know the distance of the
approaching landmarks like signals, level crossing gates, etc.
11. Modern track structure consisting of 60kg, 90 Ultimate Tensile
Strength (UTS) rails, Prestressed Concrete Sleeper (PSC) Normal/Wide
base sleepers with elastic fastening, fan shaped layout turnout on PSC
sleepers, Steel Channel/H-beam Sleepers on girder bridges is used
while carrying out primary track renewals.
12. Mechanisation of track laying activity through use of track machines
like PQRS, TRT, T-28 etc. to reduce human errors.
13. Maximizing supply of 130m/260m long rail panels for increasing
progress of rail renewal and avoiding welding of joints, thereby
improving safety.
14. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws and
timely removal of defective rails.
15. Laying of longer rails, minimizing the use of Alumino Thermic Welding
and adoption of better welding technology for rails i.e., Flash Butt
Welding.
16. Monitoring of track geometry by OMS (Oscillation Monitoring System)
and TRC (Track Recording Cars).
17. Patrolling of railway tracks to look out for weld/rail fractures.
18. The use of Thick Web Switches and Weldable CMS Crossing in turnout
renewal works.
19. Inspections at regular intervals are carried out to monitor and educate
staff for observance of safe practices.
20. Web based online monitoring system of track assets viz. Track
database and decision support system has been adopted to decide
rationalized maintenance requirement and optimize inputs.
Page 5 of 821. Detailed instructions on issues related with safety of Track, e.g.
integrated block, corridor block, worksite safety, monsoon
precautions, etc. have been issued.
22. Preventive maintenance of railway assets (Coaches & Wagons) is
undertaken to ensure safe train operations.
23. Replacement of conventional ICF design coaches with LHB design
coaches is being done.
24. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route have
been eliminated by January 2019.
25. Safety of Railway Bridges is ensured through regular inspection of
Bridges. The requirement of repair/rehabilitation of Bridges is taken up
based upon the conditions assessed during these inspections.
26. Indian Railways has displayed Statutory “Fire Notices” for widespread
passenger information in all coaches. Fire posters are provided in
every coach so as to educate and alert passengers regarding various
Do’s and Don’ts to prevent fire. These include messages regarding not
carrying any inflammable material, explosives, prohibition of smoking
inside the coaches, penalties etc.
27. Production Units are providing Fire detection and suppression system
in newly manufactured Power Cars and Pantry Cars, Fire and Smoke
detection system in newly manufactured coaches. Progressive fitment
of the same in existing coaches is also underway by Zonal Railways in
a phased manner.
28. Regular counselling and training of staff is undertaken.
29. Concept of Rolling Block introduced in Indian Railways (Open Lines)
General Rules vide Gazette notification dated 30.11.2023, wherein
work of integrated maintenance/ repair/replacement of assets is
planned up to 52 weeks in advance on rolling basis and executed as
per plan.
Page 6 of 8The details of the Safety related works related to better maintenance
practices, Technological improvements, better infrastructure and rolling
stock etc. undertaken by Railways are tabulated below:-
2004-05 to 2014-15 to 2014-25 Vs.
S.N. Item
2013-14 2024-25 2004-14
Technological Improvements
1. Use of high-quality 57,450 Km 1.43 Lakh Km More than
rails (60 Kg) (Km) 2 times
2. Longer Rail Panels 9,917 Km 77,522 Km Nearly
(260m) (Km) 8 times
3. Electronic 837 3,691 Stations More than
Interlocking (Stations) Stations 4 times
4. Fog Pass Safety As on As on 31.03.25: 288 times
Devices (Nos.) 31.03.14: 25,939 Nos.
90 Nos.
5. Thick Web Switches Nil 28,301 Nos.
(Nos.)
Better Maintenance Practices
1. Primary Rail Renewal 32,260 Km 49,941 Km 1.5 times
(Track Km)
2. USFD (Ultra Sonic 79.43 Lakh 2 Crore More than
Flaw detection) 2 times
Testing of Welds
(Nos.)
3. Weld failures (Nos.) In 2013-14: In 2024-25: 90 %
3699 Nos. 370 Nos. reduction
4. Rail fractures (Nos.) In 2013-14: In 2024-25: More than
2548 Nos. 289 Nos. 88% reduction
Better Infrastructure and Rolling Stock
1. New Track KM added 14,985 Km 34,428 Km More than
(Track Km) 2 times
2. Flyovers 4,148 Nos. 13,808 Nos. More than
(RoBs)/Underpasses 3 times
(RUBs) (Nos.)
3. Unmanned Level As on As on 31.03.24: Nil Removed
crossings 31.03.14: (All eliminated by
(Nos.) on BG 8,948 31.01.19)
4. Manufacture of LHB 2,337 Nos. 42,677 More than
Coaches (Nos.) 18 times
Page 7 of 8Compensation & Ex-Gratia
Accidents victims are paid ex-gratia relief soon after an accident or
untoward incident. Total amount of ex-gratia paid by the Railways to the
next of kin of deceased and injured in train accidents during the last five
years (2020-21 to 2024-25) is Rs. 39.48 Crores.
Compensation for death and injury of railway passengers in train
accidents and untoward incidents, as defined under Section 124 and
Section 124-A (read with Section 123) of the Railways Act, 1989, is decided
by Railway Claims Tribunal (RCT) on the basis of a claim application filed
by the victims/their dependents before RCT and it disposes of the cases
after following the due judicial process. Railway Administration pays
compensation when a decree is awarded by Hon’ble RCT in favour of the
claimant and Railways decide to implement the decree. Compensation
amount is over and above the ex-gratia amount.
The amount of compensation paid by the Railways to the next of kin
of deceased and injured in train accidents during the last five years (2020-
21 to 2024-25) is Rs. 30.53 Crores.
It may be noted that the compensation paid in a year need not
necessarily relate to the accidents/casualities in that year alone. The
amount paid in a year depends upon the number of cases finalized by
Railway Claims Tribunals (RCTs) or other Courts of Law in a particular year
irrespective of the year(s) in which the accident, have occurred.
Compensation is paid within 30 days after the receipt of judgment.
*****
Page 8 of 8