Home India RAILWAYS Parliament Question: Compensation for Victims of Rail Accide...
Date: 2026-04-01 Category: LOKSABHA_QNA State: Union Government Country: India

Parliament Question: Compensation for Victims of Rail Accidents

Issued by RAILWAYS · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO. 6050 TO BE ANSWERED ON 01.04.2026 COMPENSATION FOR VICTIMS OF RAIL ACCIDENTS 6050. SHRI ANTO ANTONY: SHRI ABDUL RASHID SHEIKH: Will the Minister of RAILWAYS be pleased to state: (a) the number of train accidents reported in the country during the last five years, year-wise; (b) the number of persons injured, died and casualties reported in these accidents during the such period, year-wise; (c) the total amount of financial compensation announced for victims of these accidents during such period; (d) the number of ex-gratia/relief to the victims/family of victims; (e) the details of victims/families who have received the financial assistance so far in those accidents; and (f) whether there are pending cases where compensation has not yet been disbursed and if so, the details thereof? ANSWER MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND ELECTRONICS & INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW) (a) to (f): Safety is accorded the highest priority on Indian Railways. As a consequence of various safety measures taken over the years, there has been a steep decline in the number of accidents. Number of Consequential Train Accidents has reduced as shown in the table below:- Year Consequential Accidents 2014-15 135 2025-26 (upto 25.03.2026) 15 (89% lesser) Page 1 of 8 §Another important index showing improvement in safety in train operations is Consequential Accident Index, the details of which are as under:- Consequential Accident Index:- Year Accident Index 2014-15 0.11 2024-25 0.03 (73% lesser) 2025-26 (upto February, 2026) 0.01 This index measures number of consequential accidents as a ratio of total running kilometers of all trains. No. of consequential accidents Accident Index = No. of trains X million kilometers run 234 s tn e d ic 165 c A n ia 135 r T la itn e u q e s n o 55 C fo .o 31 N 15 2005-06 2009-10 2014-15 2019-20 2024-25 2025-26 (25th March 2026) Consequential Train Accidents on Indian Railways and casualties (including railway passengers and railway personnel) therein are as follows:- No. of Consequential No. of Deaths No. of Injuries Period Train Accidents 2004-05 to 2013-14 1,711 904 3,155 Page 2 of 82014-15 to 2023-24 678 748 2,087 2024-25 31 18 92 2025-26(upto 15 16 28 25th March 2026) The various safety measurestaken to enhance safety in train operations are as under:- 1. On Indian Railways, the expenditure on Safety related activities has increased over the years as under:- Expenditure/Budget on Safety related activities Year (Rs. in Cr.) 2013-14 39,200 2022-23 87,336 2023-24 1,01,662 2024-25 1,14,022 2025-26 1,17,693 2026-27 1,20,389 2. Electrical/Electronic Interlocking Systems with centralized operation of points and signals have been provided at 6,665 stations up to 28.02.2026 to reduce accidents due to human failure. 3. Interlocking of Level Crossing (LC) Gates has been provided at 10,153 Level Crossing Gates up to 28.02.2026 for enhancing safety at LC Gates. 4. Complete Track Circuiting of stations to enhance safety by verification of track occupancy by electrical means has been provided at 6,669 stations up to 28.02.2026. 5. Indian Railways has gone for implementation of indigenously developed Automatic Train Protection (ATP) system, which required safety certification of highest order (SIL 4). Kavach has been adopted as a National ATP system in July 2020. Based on deployment of Kavach Page 3 of 8version 3.2 on 1,465 RKm on South Central Railway and experience gained, further improvements were made. Finally, Kavach specification version 4.0 was approved by RDSO on 16.07.2024. After extensive and elaborate trials, Kavach Version 4.0 has been successfully commissioned on 1,638 Route Kilometres, covering the highdensity Delhi-Mumbai and Delhi-Howrah routes as below: S. No. Section Progress (Route Km) (1) Delhi–Mumbai route: i Junction cabin – Palwal – Mathura – 667 Nagda section ii Vadodara –Ahmedabad section 96 iii Vadodara – Virar section 336 (2) Delhi – Howrah route: i Gaya Sarmatanr section 93 ii Chota Ambana–Bardhaman – Howrah 260 section iii. Subedarganj – Kanpur 186 Further, track side Kavach implementation work has been taken up on 24,427 RKM covering all GQ, GD, HDN and identified sections of Indian Railways. 6. Detailed instructions on issues related with safety of Signalling, e.g. mandatory correspondence check, alteration work protocol, preparation of completion drawing, etc. have been issued. 7. System of disconnection and reconnection for S&T equipment as per protocol has been re-emphasized. 8. All locomotives are equipped with Vigilance Control Devices (VCD) to improve alertness of Loco Pilots. 9. Retro-reflective sigma boards are provided on the mast which is located two OHE masts prior to the signals in electrified territories to Page 4 of 8alert the crew about the signal ahead when visibility is low due to foggy weather. 10. A GPS based Fog Safety Device (FSD) is provided to loco pilots in fog affected areas which enables loco pilots to know the distance of the approaching landmarks like signals, level crossing gates, etc. 11. Modern track structure consisting of 60kg, 90 Ultimate Tensile Strength (UTS) rails, Prestressed Concrete Sleeper (PSC) Normal/Wide base sleepers with elastic fastening, fan shaped layout turnout on PSC sleepers, Steel Channel/H-beam Sleepers on girder bridges is used while carrying out primary track renewals. 12. Mechanisation of track laying activity through use of track machines like PQRS, TRT, T-28 etc. to reduce human errors. 13. Maximizing supply of 130m/260m long rail panels for increasing progress of rail renewal and avoiding welding of joints, thereby improving safety. 14. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws and timely removal of defective rails. 15. Laying of longer rails, minimizing the use of Alumino Thermic Welding and adoption of better welding technology for rails i.e., Flash Butt Welding. 16. Monitoring of track geometry by OMS (Oscillation Monitoring System) and TRC (Track Recording Cars). 17. Patrolling of railway tracks to look out for weld/rail fractures. 18. The use of Thick Web Switches and Weldable CMS Crossing in turnout renewal works. 19. Inspections at regular intervals are carried out to monitor and educate staff for observance of safe practices. 20. Web based online monitoring system of track assets viz. Track database and decision support system has been adopted to decide rationalized maintenance requirement and optimize inputs. Page 5 of 821. Detailed instructions on issues related with safety of Track, e.g. integrated block, corridor block, worksite safety, monsoon precautions, etc. have been issued. 22. Preventive maintenance of railway assets (Coaches & Wagons) is undertaken to ensure safe train operations. 23. Replacement of conventional ICF design coaches with LHB design coaches is being done. 24. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route have been eliminated by January 2019. 25. Safety of Railway Bridges is ensured through regular inspection of Bridges. The requirement of repair/rehabilitation of Bridges is taken up based upon the conditions assessed during these inspections. 26. Indian Railways has displayed Statutory “Fire Notices” for widespread passenger information in all coaches. Fire posters are provided in every coach so as to educate and alert passengers regarding various Do’s and Don’ts to prevent fire. These include messages regarding not carrying any inflammable material, explosives, prohibition of smoking inside the coaches, penalties etc. 27. Production Units are providing Fire detection and suppression system in newly manufactured Power Cars and Pantry Cars, Fire and Smoke detection system in newly manufactured coaches. Progressive fitment of the same in existing coaches is also underway by Zonal Railways in a phased manner. 28. Regular counselling and training of staff is undertaken. 29. Concept of Rolling Block introduced in Indian Railways (Open Lines) General Rules vide Gazette notification dated 30.11.2023, wherein work of integrated maintenance/ repair/replacement of assets is planned up to 52 weeks in advance on rolling basis and executed as per plan. Page 6 of 8The details of the Safety related works related to better maintenance practices, Technological improvements, better infrastructure and rolling stock etc. undertaken by Railways are tabulated below:- 2004-05 to 2014-15 to 2014-25 Vs. S.N. Item 2013-14 2024-25 2004-14 Technological Improvements 1. Use of high-quality 57,450 Km 1.43 Lakh Km More than rails (60 Kg) (Km) 2 times 2. Longer Rail Panels 9,917 Km 77,522 Km Nearly (260m) (Km) 8 times 3. Electronic 837 3,691 Stations More than Interlocking (Stations) Stations 4 times 4. Fog Pass Safety As on As on 31.03.25: 288 times Devices (Nos.) 31.03.14: 25,939 Nos. 90 Nos. 5. Thick Web Switches Nil 28,301 Nos. (Nos.) Better Maintenance Practices 1. Primary Rail Renewal 32,260 Km 49,941 Km 1.5 times (Track Km) 2. USFD (Ultra Sonic 79.43 Lakh 2 Crore More than Flaw detection) 2 times Testing of Welds (Nos.) 3. Weld failures (Nos.) In 2013-14: In 2024-25: 90 % 3699 Nos. 370 Nos. reduction 4. Rail fractures (Nos.) In 2013-14: In 2024-25: More than 2548 Nos. 289 Nos. 88% reduction Better Infrastructure and Rolling Stock 1. New Track KM added 14,985 Km 34,428 Km More than (Track Km) 2 times 2. Flyovers 4,148 Nos. 13,808 Nos. More than (RoBs)/Underpasses 3 times (RUBs) (Nos.) 3. Unmanned Level As on As on 31.03.24: Nil Removed crossings 31.03.14: (All eliminated by (Nos.) on BG 8,948 31.01.19) 4. Manufacture of LHB 2,337 Nos. 42,677 More than Coaches (Nos.) 18 times Page 7 of 8Compensation & Ex-Gratia Accidents victims are paid ex-gratia relief soon after an accident or untoward incident. Total amount of ex-gratia paid by the Railways to the next of kin of deceased and injured in train accidents during the last five years (2020-21 to 2024-25) is Rs. 39.48 Crores. Compensation for death and injury of railway passengers in train accidents and untoward incidents, as defined under Section 124 and Section 124-A (read with Section 123) of the Railways Act, 1989, is decided by Railway Claims Tribunal (RCT) on the basis of a claim application filed by the victims/their dependents before RCT and it disposes of the cases after following the due judicial process. Railway Administration pays compensation when a decree is awarded by Hon’ble RCT in favour of the claimant and Railways decide to implement the decree. Compensation amount is over and above the ex-gratia amount. The amount of compensation paid by the Railways to the next of kin of deceased and injured in train accidents during the last five years (2020- 21 to 2024-25) is Rs. 30.53 Crores. It may be noted that the compensation paid in a year need not necessarily relate to the accidents/casualities in that year alone. The amount paid in a year depends upon the number of cases finalized by Railway Claims Tribunals (RCTs) or other Courts of Law in a particular year irrespective of the year(s) in which the accident, have occurred. Compensation is paid within 30 days after the receipt of judgment. ***** Page 8 of 8

Continue your research