Home India RURAL DEVELOPMENT Parliament Question: Connectivity of Villages under PMGSY...
Date: 2025-12-16 Category: Not Applicable State: Union Government Country: India

Parliament Question: Connectivity of Villages under PMGSY

Issued by RURAL DEVELOPMENT · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** The document is a response to Lok Sabha Starred Question No. 224, answered on 16/12/2025, regarding the connectivity of villages under the Pradhan Mantri Gram Sadak Yojana (PMGSY). It outlines the progress and plans for connecting villages under various phases of the PMGSY scheme and the progress of road construction in Shirdi Lok Sabha Constituency of Maharashtra. Implementation of PMGSY IV is expected to continue until March 2029. **Key Points / Main Content** * **PMGSY Overview:** * 'Rural Roads' is a State subject. PMGSY was launched in 2000. * PMGSY aims to provide all-weather road connectivity to unconnected habitations. * PMGSY includes PMGSY-II, Road Connectivity Project for Left Wing Extremism Affected Areas (RCPLWEA), PMGSY-III, Pradhan Mantri Jan Jati Adivasi Nyaya Maha Abhiyan (PM-JANMAN) and PMGSY-IV * **PMGSY-I:** * 1,62,774 habitations have been provided all weather road connectivity until the sunset date of 31st March, 2025. * **PMGSY-II:** * Launched for upgradation of select Through Routes and Major Rural Links (MRLs). * Target to upgrade 50,000 km. * 49,082 km of roads have been upgraded. * **Road Connectivity Project for Left Wing Extremism Affected Areas (RCPLWEA):** * Launched to provide better connectivity to LWE affected regions. * 9,763 km of sanctioned roads have been completed under RCPLWEA. * **PMGSY-III:** * Aims to consolidate the existing Rural Road Network. * Target to upgrade existing 1,25,000 km Through Routes and Major Rural Links that connect habitations to various markets and institutions. * Balance road works are targeted to be completed by 2026. * **PM-JANMAN:** * Target of 8,000 km of rural roads, 7,323.75 km sanctioned as on 10-12-2025. * Aims to provide connectivity to Particularly Vulnerable Tribal Groups (PVTGs). * Implementation timeline is till March 2028. * **PMGSY-IV:** * Launched on 11th September 2024 to provide road connectivity of 62,500 km to unconnected habitations due to population increase. * Prioritizes habitations based on population and Scheduled Tribe (ST) or Scheduled Caste (SC) concentration. * Implementation timeline is till March 2029. * **Maharashtra Specifics:** * Under PMGSY-II in Maharashtra, the road length sanctioned was 2618.91 km and number of bridges was 108, with 2585.91 km of road length completed along with 108 bridges. * Under RCPLWEA in Maharashtra the road length sanctioned is 619.68 km, with 551.27 km completed along with 107 bridges. * Under PMGSY-III in Maharashtra the road length sanctioned is 6,409.03 km and number of bridges is 213, with 4,820.95 km completed along with 12 bridges. * Under PM-JANMAN, 50.14 km road length has been sanctioned for Maharashtra as on 10-12-2025. * The State Government has mapped 196 habitations as unconnected habitations after survey in 26 districts in Maharashtra. * The State Government survey report indicates that the Shirdi Lok Sabha Constituency of Maharashtra does not have any eligible unconnected habitations, as per the PMGSY IV guidelines. * **Ahilyanagar District Specifics:** * Since inception of PMGSY, 1818 km of road length was sanctioned, out of which 1642 km is completed and 125 km is under construction. **Impact Analysis** **Central Government (Ministry of Rural Development)** * **Impact:** Oversees the implementation of the PMGSY scheme and monitors progress. * **Action Required:** Finalise and sanction proposals from State Governments, including Maharashtra, as per the guidelines. **State Governments (including Maharashtra)** * **Impact:** Responsible for conducting surveys to identify eligible habitations, proposing projects, and implementing the PMGSY scheme. * **Action Required:** Conduct surveys, upload details of unconnected habitations, and work with the Ministry to finalize and sanction proposals. **Residents of Unconnected Habitations** * **Impact:** Improved connectivity, potentially leading to better access to services, markets, and economic opportunities. * **Action Required:** None specified, but they are the ultimate beneficiaries of the scheme. **Particularly Vulnerable Tribal Groups (PVTGs)** * **Impact:** Specifically targeted for improved road connectivity under PM-JANMAN. * **Action Required:** None specified. **Construction Contractors** * **Impact:** Will be awarded contracts for road construction projects. * **Action Required:** Bid on projects and construct roads according to specifications.

Key Entities Referenced

Pradhan Mantri Gram Sadak Yojana (PMGSY): A rural road connectivity program launched in 2000, aimed at providing all-weather road access to eligible unconnected habitations. Ministry of Rural Development: The primary ministry responsible for the PMGSY program. Maharashtra: The specific state mentioned for details on PMGSY implementation.
Official Source Record View Original Source →
See Full Document Text
O.I.H. GOVERNMENT OF INDIA MINISTRY OF RURAL DEVELOPMENT DEPARTMENT OF RURAL DEVELOPMENT LOK SABHA STARRED QUESTION NO. 224 ANSWERED ON 16/12/2025 CONNECTIVITY OF VILLAGES UNDER PMGSY *224. Shri Bhausaheb Rajaram Wakchaure: Will the Minister of RURAL DEVELOPMENT be pleased to state: (a) the details of villages yet to be connected by road under Pradhan Mantri Gram Sadak Yojana (PMGSY) in the country, State-wise particularly in Shirdi Lok Sabha Constituency of Maharashtra; (b) whether the Government has formulated or proposes to formulate any action plan to connect the villages with access roads located in the most backward areas of the country, State- wise particularly in Maharashtra; (c) if so, the details thereof; and (d) if not, the reasons therefor? ANSWER MINISTER OF RURAL DEVELOPMENT (SHRI SHIVRAJ SINGH CHOUHAN) (a) to (d): A statement is laid on the Table of the House. Page 1 of 8STATEMENT REFERRED TO IN REPLY TO PARTS (a) to (d) OF LOK SABHA STARRED QUESTION NO. *224 TO BE ANSWERED ON 16.12.2025 REGARDING “CONNECTIVITY OF VILLAGES UNDER PMGSY” (a) to (d): 'Rural Roads' is a State subject. Pradhan Mantri Gram Sadak Yojana (PMGSY) was launched in the year 2000 as a one-time special intervention to provide rural connectivity, by way of a single all-weather road, to the eligible unconnected habitations of designated population size in the core network for uplifting the socio- economic condition of the rural population. Subsequently, new interventions, namely, PMGSY-II, Road Connectivity Project for Left Wing Extremism Affected Areas (RCPLWEA), PMGSY-III, Pradhan Mantri Jan Jati Adivasi Nyaya Maha Abhiyan (PM-JANMAN) and PMGSY-IV were added under the ambit of PMGSY for new connectivity and upgradation of rural roads. The unit for PMGSY is a habitation and not a village.  Under PMGSY I programme (2000-2025), 1,62,774 habitations have been provided all weather road connectivity and the sunset date of PMGSY-I has expired on 31st March, 2025 (except Chhattisgarh). State/UT-wise numbers of habitations connected under PMGSY-I is given at Annexure-I.  PMGSY-II was launched for upgradation of select Through Routes and Major Rural Links (MRLs) with a target to upgrade 50,000 km in various states and Union Territories. Under PMGSY II program (2013-2025) 49,082 km of the roads have been upgraded. Under this scheme in Maharashtra the road length sanctioned was 2618.91 km and number of bridges was 108. Out of this 2585.91 km road length is completed along with 108 bridges.  In the year 2013, to provide better connectivity to LWE affected regions, special provision was made to provide connectivity to habitations in the population category of 100-249. Subsequently, in the year 2016, Road Connectivity for Project Left Wing Effected Areas (RCPLWEA) was launched as separate vertical under PMGSY. Under RCPLWEA, out of 12,092 km sanctioned roads 9,763 km has been completed. Under this scheme in Maharashtra the road length sanctioned is 619.68 km Page 2 of 8and number of bridges is 112. Out of this 551.27 km road length is completed along with 107 bridges, so far.  PMGSY III program (2019-2026) envisages consolidation of the existing Rural Road Network by upgradation of existing 1,25,000 km Through Routes and Major Rural Links that connect habitations to Gramin Agricultural Markets (GrAMs), Higher Secondary Schools and Hospitals. Out of the sanctioned 1,21,082 km road, the achievement is about 1,01,900 km. The balance road works are targeted to be completed by 2026. Under this scheme in Maharashtra the road length sanctioned is 6,409.03 km and number of bridges is 213. Out of this 4,820.95 km road length is completed along with 12 bridges, so far.  Under PM-JANMAN (2024 onwards), out of a total target of 8,000 km of rural roads, 7,323.75 km of road length has been sanctioned (including in Maharashtra of 50.14 km length), as on 10-12-2025, for providing connectivity to 2,909 habitations of Particularly Vulnerable Tribal Groups (PVTGs). The sanctioned works are in different stages of construction. The timeline for implementation of PM-JANMAN is till March 2028. State-wise details of length and habitations sanctioned under PM-JANMAN is at Annexure-II.  The Government has launched PMGSY IV on 11th September 2024 for providing road connectivity of 62,500 Kms to 25,000 unconnected habitations which have become eligible due to their population increase. Unconnected habitations having 500+ population in plain areas; 250+ in NE and Hill States/UTs, Special Category Areas (Schedule V Tribal Areas, Aspirational Districts/Blocks, Desert Areas); and 100+ in LWE-affected areas (as notified by MHA in 9 States), as per Census 2011, are eligible for coverage under PMGSY-IV, as per population norms of the programme. The PMGSY IV is being implemented in convergence with two targeted initiatives for ensuring inclusive access in backward and marginalised areas, namely, (i) Dharti Aaba Janjatiya Gram Utkarsh Abhiyan (DA-JGUA): Habitations with 500+ population and 50% or more ST population, or habitations with 50+ ST population in the 250+ category in Aspirational Districts, as per Census 2011, are given priority under PMGSY IV. Page 3 of 8(ii) Pradhan Mantri Anusuchit Jaati Abhyuday Yojana (PM- AJAY): Habitations with 500+ population and 40% or more SC population are given priority under PMGSY-IV.  Under PMGSY IV programme (2024-2029), the States have conducted survey using Gram Sadak Survey application and uploaded the details of 40,547 habitations as unconnected habitations. The details are placed in Annexure-III.  In Maharashtra, the State Government has mapped 196 habitations as unconnected habitations after the survey in 26 districts—Ahilyanagar, Aurangabad, Beed, Buldhana, Dhule, Gadchiroli, Hingoli, Jalgaon, Jalna, Kolhapur, Latur, Nanded, Nandurbar, Nashik, Osmanabad, Parbhani, Pune, Raigad, Ratnagiri, Sangli, Satara, Sindhudurg, Solapur, Thane, Washim, and Palghar—using the Gram Sadak Survey Application.  As the preliminary identification of eligible habitations under PMGSY-IV has been completed by the State Governments, the Ministry is working closely with the State Governments, including Maharashtra, to finalise and sanction proposals as per the guidelines. The timeline for implementation of PMGSY IV is till March 2029.  Parliamentary constituency wise details are not maintained in the Ministry. Shirdi parliamentary constituency comprises parts of the district of Ahilyanagar. In Ahilyanagar district, under PMGSY program, since inception of scheme road length of 1818 km was sanctioned, out of which 1642 km of road construction has been completed and 125 km is under construction. The details of works sanctioned and completed under the verticals of PMGSY in the district are given at Annexure-IV. The State Government survey report indicates that the Shirdi Lok Sabha Constituency of Maharashtra does not have any eligible unconnected habitations, as per the PMGSY IV guidelines. ***** Page 4 of 8Annexure-I Annexure referred to in reply to parts (a) to (d) of Lok Sabha Starred Question No. 224 for answer on 16.12.2025 regarding “Connectivity of Villages under PMGSY” State-wise details of habitations connected under PMGSY-I Sr. Total Eligible Habitation Connected State/UT Name No. (Nos.) 1 Andaman & 7 Nicobar 2 Andhra Pradesh 1,422 3 Arunachal Pradesh 616 4 Assam 13,719 5 Bihar 31,280 6 Chhattisgarh 10,621 8 Goa 1 9 Gujarat 3,047 10 Haryana 1 11 Himachal Pradesh 2,555 12 Jammu And 2,132 Kashmir 13 Jharkhand 10,953 14 Karnataka 295 15 Kerala 402 16 Madhya Pradesh 17,497 17 Maharashtra 1,417 18 Manipur 622 19 Meghalaya 586 20 Mizoram 231 21 Nagaland 107 22 Odisha 16,991 23 Punjab 389 24 Rajasthan 15,970 25 Sikkim 350 26 Tamil Nadu 1,985 27 Tripura 1,979 28 Uttar Pradesh 11,748 29 Uttarakhand 1,860 30 West Bengal 13,224 31 Telangana 703 32 Ladakh 64 Total 162,774 Page 5 of 8Annexure-II Annexure referred to in reply to parts (a) to (d) of Lok Sabha Starred Question No. 224 for answer on 16.12.2025 regarding “Connectivity of Villages under PMGSY” Details of Road length sanctioned under PM JANMAN till 10.12.25 Length Sanctioned Sanctioned State (in km) habitations Andhra Pradesh 865.95 438 Chhattisgarh 2901.95 918 Gujarat 1.55 2 Jharkhand 914.14 304 Karnataka 63.76 42 Madhya Pradesh 1835.00 850 Maharashtra 50.14 29 Manipur 35.00 8 Odisha 211.14 74 Rajasthan 98.69 38 Tamil Nadu 10.96 6 Telangana 66.98 46 Tripura 268.49 154 Total 7323.75 2909 Page 6 of 8Annexure-III Annexure referred to in reply to parts (a) to (d) of Lok Sabha Starred Question No. 224 for answer on 16.12.2025 regarding “Unconnected Habitations surveyed by the State Governments under PMGSY IV” Sr.No State/UT Name Habitations surveyed in GSS application as per PMGSY-IV eligibility criteria by the State Governments 1 Andhra Pradesh 413 2 Arunachal Pradesh 194 3 Assam 4670 4 Bihar 103 5 Chhattisgarh 2692 6 Gujarat 2443 7 Himachal Pradesh 1021 8 Jammu And Kashmir 2262 9 Jharkhand 2787 10 Karnataka 76 11 Kerala 2335 12 Ladakh 31 13 Madhya Pradesh 9246 14 Maharashtra 196 15 Manipur 303 16 Meghalaya 377 17 Mizoram 63 18 Nagaland 224 19 Odisha 2679 20 Punjab 1 21 Rajasthan 1740 22 Sikkim 283 23 Tamil Nadu 5 24 Telangana 173 25 Tripura 435 26 Uttar Pradesh 2174 27 Uttarakhand 873 28 West Bengal 2748 Total 40547 Page 7 of 8Annexure-IV Annexure referred to in reply to parts (a) to (d) of Lok Sabha Starred Question No. 224 for answer on 16.12.2025 regarding “Connectivity of Villages under PMGSY” Details of works sanctioned and completed in the district of Ahilyanagar are as follows: Sanctioned Completed Balance Value Expenditure Road of Road (including Road Vertical No of length No of project No of length No of State Share No of length No of roads bridges (Crore) roads bridges (Crore) roads bridges (km) (km) (km) PMGSY-I 203 1270 15 376 202 1226 15 1 1 0 381 PMGSY-II 19 134 3 73 19 127 3 74 0 0 0 PMGSY-III 59 414 4 322 29 289 1 238 30 125 3 Total 281 1818 22 771 250 1642 19 313 31 125 384 ***** Page 8 of 8

Continue your research