GOVERNMENT OF INDIA
MINISTRY OF CULTURE
RAJYA SABHA
UNSTARRED QUESTION NO. 1467
TO BE ANSWERED ON 12.02.2026
CONSERVATION AND PROTECTION OF MONUMENTS IN J&K
1467 SHRI SAT PAUL SHARMA:
Will the Minister of CULTURE be pleased to state:
(a) whether the Archaeological Survey of India is taking measures for
conservation and protection of monuments in J&K;
(b) if so, the details of repair, restoration and structural stabilization works being
carried out in J&K using modern tools such as LiDAR mapping, GIS, drone-
based surveys;
(c) whether Government has proposed integrated and phased development of
heritage sites in J&K;
(d) if so, the details of sites planned for completion by 2025-26 along with the
estimated expenditure;
(e) whether awareness and capacity-building programmes have been initiated
for conservation of heritage sites in J&K; and
(f) if so, the outcomes in promoting tourism and preserving cultural heritage in
J&K?
ANSWER
THE MINISTER OF CULTURE AND TOURISM
(SHRI GAJENDRA SINGH SHEKHAWAT)
(a) There are 56 Centrally Protected Monuments under care and maintenance of
Archaeological Survey of India (ASI) in Jammu & Kashmir. ASI undertakes
regular conservation, preservation and protection of Centrally Protected
Monuments under its jurisdiction in J&K.
(b) Repair, restoration and structural stabilization works are being carried out
regularly at various monuments as per the need and availability of resources.
However, the use of modern documentation tools such as LiDAR mapping,
GIS and drone-based surveys have been proposed for selected monuments,
including the Group of Temples at Naranag, Sun Temple Martand, and the
Ancient Temple at Buniyar, for detailed documentation and future
conservation planning.(c) ASI has proposed integrated and phased development of selected heritage
sites in Jammu & Kashmir with emphasis on conservation, visitor amenities
and heritage awareness.
(d) The list of monuments where conservation/development works are planned
for completion during financial year 2025-26 till date is enclosed at
Annexure-I. The allocation and expenditure during the year 2025-26 is given
below.
(In Crores)
Year Allocation Expenditure upto
27.01.2026
2025-26 5.75 4.97
(e) Heritage awareness and capacity-building programmes are being undertaken
through outreach activities, involvement of local communities and education
institutions.
(f) These initiatives have resulted in enhanced public awareness and promotion
of tourism while ensuring preservation of the cultural heritage of Jammu &
Kashmir.Annexure - I
STATEMENT REFERRED TO IN REPLY TO PART (d) OF THE RAJYA SABHA
UNSTARRED QUESTION NO. 1467 FOR 12.02.2026
The details of sites planned for completion by 2025-26
Sl. No. Name of Monument Name of work
Conservation works
01. Akhnoor fort Akhnoor, District S/R to Akhnoor Fort Akhnoor
Jammu
02. Pratapswamin temple, Tapper S/R to Pratapswamin temple, Tapper
Baramulla
03. Avantisvara temple, Avantipur, S/R to Avantisvara temple, Avantipur
Pulwama
04. Hari Hara Shiva Temple, S/R to Hari Hara Shiva Temple, Billawar
Billawar, Kathua
05. Trilochan Nath temple, S/R to Trilochan Nath temple, Mahadera,
Mahadera, Basholi Kathua Basholi
06. Ancient Stupa, Monastery and S/R to West Side Stupa at Parihaspora Pattan
Chaitya at Parihaspora Baramulla
07. Group of arched terraces at Pari S/R to Restoration of stair case at Group of
Mahal, Srinagar Arched terraces Structural Pari Mahal
08. Sugandesha temple Baramulla S/R to Sugandesha temple Pattan
09. Mughal Arcade Verinag, District S/R to Mughal Arcade Verinag
Anantnag
10. Ancient Stupa, Monastery and S/R to Main structure & laying of stone in Apron
Chaitya at Parihaspora Baramulla of Chaitya at Parihaspora Pattan
Baramulla
11. Zaina – ul Abdin’s Mothers tomb, S/R to Zaina – ul Abdin’s Mothers tomb, Zaina
Zaina Kadal, Srinagar Kadal, Srinagar
12. Akhoon Mulla Shah, Mosque S/R to Akhoon Mulla Shah, Mosque
13. Group of temples at Naranag S/R to Group of temples at Naranag
Development works
15. Avantisvara temple, Avantipur, S/R to Avantisvara temple, Avantipur
Pulwama
16. Hari Hara Shiva Temple, S/R to Hari Hara temple Billawar
Billawar, Kathua
17. Mughal Arcade Verinag, District Development of amenities at Mughal Arcade
Anantnag Verinag
18. Ancient temple Martand Upgradation of pathway & fixing of CCTV
Cameras at Ancient temple Martand
19. Avantiswamin temple Avantipur Job work under up-gradation of toilet block and
ticket counter at Avantiswamin temple
Avantipur
20 Ancient Palace at Ramnagar Job work under up-gradation of existing grill
fencing over dwarf wall on southern side of the
Ancient Palace at Ramnagar
*****