GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
STARRED QUESTION NO. 363
TO BE ANSWERED ON 18.03.2026
DEVELOPMENT OF TALGARIA RAILWAY STATION AS A SATELLITE STATION
*363. SHRI DULU MAHATO:
Will the Minister of RAILWAYS be pleased to state:
(a) whether any representation has been received to develop Talgaria
station under South Eastern Railway as a satellite station for the
Bokaro-Chas region and if so, the details thereof;
(b) whether the Government has assessed the techno-economic feasibility
of utilising the Talgaria-Tupkadih line to mitigate engine reversal and
line congestion at Bokaro Steel City station and if so, the details
thereof;
(c) whether any traffic survey has been conducted for providing halts to
major Delhi-Odisha route trains and expanding loop lines at this station
and if so, the details of action taken thereon; and
(d) whether the Government proposes to include this station under the
'Amrit Bharat Station Scheme' to enhance connectivity for the industrial
population of the region and if so, the details thereof?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (d): A Statement is laid on the Table of the House.
*****
§STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (d) OF STARRED
QUESTION NO. 363 TO BE ANSWERED ON 18.03.2026 IN LOK SABHA
(a) to (d): Talgaria Station is situated on Bokaro- Adra section of South
Eastern Railway about 30 km from Bokaro.
There are 06 lines (2 main lines & 4 loop lines) and 04 high level platforms
at Talgaria Station. Average daily footfall at Talgaria Station is about 200
passengers. This station is presently being served by 04 train services as
under:
SN Train Number & Name
1 18013 Adra - Bokaro Steel City Express
2 18014 Bokaro Steel City - Adra Express
3 68079 Bhojudih - Chandrapura MEMU
4 68080 Chandrapura - Bhojudih MEMU
At Talgaria station, all passenger facilities like platform shelter, urinal,
lavatory, waiting hall, drinking water arrangement, seating arrangement,
Foot Over Bridge etc. are available. The works of high-level platform,
platform shelter, booking office cum waiting hall, toilet, water booth,
Divyangjan ramp at platform no. 1 and 3 m Foot Over Bridge have been
completed in recent years.Talgaria Station
To augment capacity of Talgaria Station, Doubling of Talgaria – Bokaro
North Cabin section (38 Km) has been recently completed. Work for
doubling of Bhojudih – Talgaria section (12.5 Km) has been taken up to
augment the capacity further.
There are 09 lines & 03 high level platforms existing at Bokaro Steel City
Station. Further, Bokaro Steel City Station has been identified for
development under Amrit Bharat Station Scheme. At this station, the
following works have been taken up:
One additional island platform
One additional line
Extension of one platform
Improvement of station building
Surfacing of platform no. 1, 2 & 3
Escalators
new waiting hall
retiring room
Parking, approach road, entry/exit gate, boundary wall
Tactile pathway for Divyangjan at platform no. 1 and improvement of
Divyangjan toilet at platform no. 2
Bokaro Steel City StationTo augment capacity of rail network at Bokaro station, following works
have been taken up:
Bokaro Steel City – Bokaro North Cabin (3.75 Km) 3rd and 4th line
work.
Bokaro Steel City – Damrughutu 3rd& 4th line and
Damrughutu – Barbenda(30Km) doubling
Trains serving Odisha and Delhi from Bokaro city are as under:
Trains serving Bokaro Steel City-Puri sector:-
SN Train Number & Name
1 12875/76 Anand Vihar (T)-Puri Express
2 18427/28 Anand Vihar (T)-Puri Express
3 12801/02 Anand Vihar (T)-Puri Express
Trains serving to Bokaro Steel City-Bhubaneshwar sector:-
SN Train Number & Name
1 22805/06 Anand Vihar (T)-Bhubaneswar Express
2 12875/76 Anand Vihar (T)-Puri Express
3 22823/24 New Delhi-Bhubaneswar Rajdhani Express
4 18427/28 Anand Vihar (T)-Puri Express
5 12801/02 Anand Vihar (T)-Puri Express
Trains serving Bokaro Steel City-Delhi sector:-
SN Train Number & Name
1 12801/02 Puri-Anand Vihar (T) Express
2 12817/18 Hatia-Anand Vihar (T) Express
3 12825/26 Ranchi-Anand Vihar (T) Express
4 12875/76 Puri-Anand Vihar (T) Express
5 18427/28 Puri-Anand Vihar (T) Express
6 20839/40 Ranchi-New Delhi Rajdhani Express
7 22805/06 Bhubaneswar-Anand Vihar (T) Express
8 22823/24 Bhubaneswar-New Delhi Rajdhani Express
Further, Talgaria is also connected to Adra by 18013/14 Adra-Bokaro Steel
City Express which is further connected to Delhi and Puri/Bhubaneswar by
the following 05 pairs of train services as listed below:
SN Train Number & Name
1 22805/ 22806 Anand Vihar (T)-Bhubaneswar Express
2 12875/12876 Anand Vihar (T)-Puri Express
3 22823/22824 New Delhi-Bhubaneswar Rajdhani Express
4 18427/18428 Anand Vihar (T)-Puri Express5 12801/12802 Anand Vihar (T)-Puri Express
Besides, provision of stoppages of train services depends on the traffic
justification, operational feasibility including availability of extra time on
the section & availability of matching infrastructure such as Platform
length etc.
The proposals for development of Station as a satellite station are
examined with respect to assessment of passenger footfall, traffic trends,
and earnings of station, keeping in view future growth, and requirements of
further development.
The feasibility of developing Talgaria Station as a satellite terminal has
been taken up.
Jharkhand:
Railway Budget:
Budget allocation in the recent years has increased significantly. Budget
allocation for infrastructure projects falling fully/partly in the State of
Jharkhand is as under:-
Period Outlay
2009-14 ₹457 Cr./Yr
2025-26 ₹7306 Cr. (approx. 16 times)
Projects Sanctioned:
As on 01.04.2025, 26 projects (9 New Lines and 17 Doubling), of total
length of 2363 Km, costing ₹47,729 crore falling fully/partly in the State of
Jharkhand including those which are in planning/approval/construction
stage, out of which, 598 km length has been commissioned and an
expenditure of ₹15,845 crore has been incurred upto March, 2025. The
summary is as under:-
Category No. of Total Length Total Exp. upto
project Length Commissione March, 2025
s (in Km) d till March, (Rs. in Cr.)
2025(in Km)
New Lines 9 749 156 4239
Doubling/Multi- 17 1614 442 11606
tracking
Total 26 2363 598 15845Track Construction:
The details of constructing new tracks falling fully/partly in the State of
Jharkhand is as under:-
Period New Track Commissioned Average Commissioning of new
tracks
2009-14 287 Km 57.4 Km/year
2014-25 1316 Km 119.64 Km/year (More than 2
times)
Recently Completed Projects:
Details of some of the recently completed projects falling fully/partly in the
State of Jharkhand are as under:
SN Name of Project Cost (Rs. in
Cr.)
1 Mandarhill- Dumka – Rampurhat new line (130 Km) 908
2 Giridih-Koderma new line (111 Km) 404
3 Koderma – Ranchi new line (202 Km) 3800
Ranchi-Lohardaga Gauge Conversion & its
4 665
extension upto Tori (111 Km)
5 Sahibganj-Pirpainti Doubling (23 km) 129
6 Tinpahar-Sahebganj Doubling (38 Km) 246
7 Sini-Adityapur Doubling (23 Km) 215
8 Goeilkera-Manoharpur Doubling (28 Km) 425
9 Dongaposi-Rajkharswan 3rd line (75 Km) 629
10 Danea-Ranchi Road Doubling (25 Km) 324
11 Chakardharpur-Goilkera 3rd line (34 Km) 383
12 Garhwa Road-Ramna doubling (32 Km) 427
13 Manoharpur-Bondamanda 3rd line (30 Km) 359
14 Jarangdih-Danea Patch Doubling (29 km) 500
15 Ranchi Road- Patratu doubling (31 Km) 348
16 Talgaria-Bokaro doubling (38 Km) 514
17 Ramna-Singrauli doubling (160 Km) 2436
Ongoing Projects:
Details of some of the projects falling fully/partly in the State of Jharkhand
which have been taken up are as under:SN Project Cost (Rs. in
Cr.)
1 Dhanbad-Chandrapura via Tundu-Nichitpur new 629
line (26 Km)
2 Namkum-Kandra new line (106 Km) 2,120
3 Buramara-Chakulia new line (60 Km) 1,459
4 Dhanbad-Sonnagar 3rd line (429 Km) 4,500
5 Ranchi Road- Patratu doubling (31 Km) 291
6 Bondamunda-Ranchi doubling (166 Km) 1,660
7 Kharagpur-Adityapur 3rd line (132 Km) 1,116
8 Chandil- Anara- Burnpur - 3rd line (125KM) 1,647
9 Muri-Barkakhana doubling (58 Km) 580
10 Sainthia-Pakur 4th line (81 Km) 1,569
11 Gamharia-Chandil 3rd and 4th line (26 Km) 1,168
Sanction of any railway project depend upon many parameters/factors
which include the following:
Anticipated traffic projections and Remunerativeness of the proposed
route
First and last mile connectivity provided by the project
Connection of missing links and providing additional route
Augmentation of congested/saturated lines
Demands raised by State Governments/Central Ministries/Public
representatives,
Railway’s own operational requirements
Socio-economic considerations
Overall availability of funds
Completion of Railway project/s depends on various factors which include
the following:
Land acquisition by State Government
Forest clearance
Shifting of infringing utilities
Statutory clearances from various authorities
Geological and topographical conditions of area
Law and order situation in the area of project site
Number of working months in a year for particular project site etc.
All these factors affect the completion time and cost of the project/s.Amrit Bharat Station Scheme:
Development / redevelopment / upgradation / modernisation of stations on
Indian Railways is a continuous and ongoing process and works in this
regard are undertaken as per requirement, subject to inter-se priority and
availability of funds. Development / redevelopment / upgradation /
modernisation of a station is carried out based on category of
station/condition/traffic handled etc.
Representations / suggestions / proposals, both formal and informal for
Railway projects / Works across the country are received on the basis of
demands raised by State Governments, Members of Parliament, Ministries
of Central Government, elected representatives, Railways' own
requirements, organizations / rail users etc., at various levels including
Railway Board, Zonal Railways, Division office etc. Receipt of such
suggestions / representations is a continuous and dynamic process and
these are examined and action as found feasible and justified is taken from
time to time.
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their implementation
in phases to improve the stations. The master planning includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement, water
booths
Provision of wider foot over bridge/air concourse commensurate with
passenger traffic
Provision of lift/escalators/ramp
Improvement /Provision of platform surface and cover over platforms
Provision of kiosks for local products through schemes like ‘One
Station One Product’
Parking areas, Multimodal integration
Amenities for Divyangjans
Better passenger information systems
Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity at each
station.The scheme also envisages sustainable and environment friendly solutions,
provision of ballastless tracks etc. as per necessity, phasing and feasibility
and creation of city centre at the station in the long term.
So far, 1,338 stations have been identified for development under the Amrit
Bharat Station Scheme. Out of these, 57 stations are located in Jharkhand.
The name of stations identified under Amrit Bharat Station Scheme in
Jharkhand are as following:
No. of
State Name of Stations
Stations
Jharkhand 57 Balsiring, Bano, Barajamda Jn, Barkakana,
Basukinath, Bhaga, Bokaro Steel City, Chaibasa,
Chakradharpur, Chandil, Chandrapura,
Daltonganj, Dangoaposi, Deoghar, Dhanbad,
Dumka, Gamharia, Gangaghat, Garhwa Road,
Garhwa Town, Ghatsila, Giridih, Godda, Govindpur
Road, Haidar Nagar, Hatia, Hazaribagh Road,
Jamtara, Japla, Jasidih Jn, Katrasgarh, Koderma
Jn, Kumardubi, Latehar, Lohardaga, Madhupur Jn,
Manoharpur, Muhammad Ganj, Muri Jn, N.S.C.B.
Jn Gomoh, Nagar Untari, Namkom, Orga, Pakur,
Parasnath, Piska, Rajkharswan, Rajmahal,
Ramgarh Cantt, Ranchi Jn, Sahibganj, Sankarpur,
Silli, Sini, Tatanagar, Tatisilwai, Vidyasagar
Development works at railway stations under Amrit Bharat Station Scheme
in Jharkhand have been taken up at a good pace. Details of stations
completed in Jharkhand are as under:
No. of
State Name of stations
stations
Jharkhand 9 Godda, Govindpur Road, Lohardaga, Madhupur Jn,
Muri Jn, Piska, Rajmahal, Sahibganj, Sankarpur
The activities for development at other stations have also been taken up at
good pace and progress of some of the above stations is as given below:
Kumardubi station: The structural work of new station building,
retiring room, waiting hall, toilet and booking counter have been
completed. The finishing works of new station building, improvement
of circulating area and signage have been taken up. Balsiring station: The works of improvement of station building,
platform shelter, parking, approach road, Divyangjan toilet and ticket
counter have been completed. The works of platform surfacing and
Foot Over Bridge have been taken up.
Bano station: The works of improvement of station building,
circulating area, approach road, station lighting and ramp have been
completed. The works of platform shelter, platform surfacing, drinking
water booth and Divyangjan toilet have been taken up.
Tatisilwai station: The works of improvement of station building,
entrance porch, platform shelter, waiting hall, circulating area,
approach road and signage have been completed. The work of Foot
Over Bridge has been taken up.
Stations are selected based on the proposals received from Zonal
Railways, stations located in major cities and places of tourist and
pilgrimage importance.
Development / Upgradation of stations is complex in nature involving safety
of passengers & trains and requires various statutory clearances such as
fire clearance, heritage, tree cutting, airport clearance etc. The progress
also gets affected due to brownfield related challenges such as shifting of
utilities (involving water/sewage lines, optical fibre cables, gas pipe lines,
power/signal cables, etc.), infringements, operation of trains without
hindering passenger movement, speed restrictions due to works carried out
in close proximity of tracks and high voltage power lines, etc. and these
factors affect the completion time.
Development / Upgradation / Modernization of stations including Amrit
Bharat Station Scheme is generally funded under Plan Head-53 ‘Customer
Amenities’. The details of allocation and expenditure under Plan Head-53
are maintained Zonal Railway-wise and not work-wise or station-wise or
state-wise. Jharkhand is covered under the jurisdiction of three railway
zones, namely, Eastern Railway, East Central Railway and South Eastern
Railway. For these zones, an allocation of ₹ 1,469 crore has been made for
the financial year 2025-26, out of which an expenditure (up to February,
2026) of ₹ 1,447 crore has been incurred so far.
*****