Home India RAILWAYS Parliament Question: Extension and Stoppage of Trains for Hy...
Date: 2026-02-04 Category: Not Applicable State: Union Government Country: India

Parliament Question: Extension and Stoppage of Trains for Hyderabad

Issued by RAILWAYS · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** This document is the official answer from the Minister of Railways to Unstarred Question No. 811, posed in the Lok Sabha, regarding the extension and stoppage of trains for Hyderabad, with a response due date of 04.02.2026. The question concerns the extension of Train No. 17036 to Secunderabad, and the grant of stoppages at Ravindrakhani and Bellampalli stations. The answer provides details of existing train services and the criteria for considering new stoppages and extensions. **Key Points / Main Content** * **Existing Services:** * The Balharshah-Kazipet-Hyderabad sector is currently served by 18 pairs of train services (listed by train number and name). * **Services at Ravindrakhani:** * Ravindrakhani is currently served by 12 train services (listed by train number and name). * The 16031/16032 Andaman Express and 17035/17036 Kazipet-Balharshah Express have scheduled stoppages at Manchiryal/Belampalli. * **Services at Bellampally:** * Bellampally is served by 50 train services (listed by train number and name). * The 12615/12616 Grand Trunk Express has a scheduled stoppage at Manchiryal/Sirpur Kagaznagar. * **Consideration of New Stoppages:** * Provision of new train service stoppages depends on traffic justification, operational feasibility (availability of extra time), and infrastructure (platform length). * **Process for Handling Proposals:** * The Ministry receives proposals/requests/suggestions/representations for introduction/restoration of trains from various sources. * These proposals are continuously examined, and action is taken if found feasible and justified. * **Factors Affecting Train Extension:** * Extension of train services depends on the section's capacity, path availability, rolling stock availability, matching infrastructure, and maintenance requirements. **Impact Analysis** **Stakeholder: Public Representatives and Stakeholders Seeking Extension of Train No. 17036** * **Impact:** Their requests have been acknowledged but the response indicates that there is no immediate commitment to extend the train service. * **Action Required:** None explicitly stated. However, they may need to provide further data or justifications if the ministry seeks further information. **Stakeholder: Daily Commuters, Students, and Employees Seeking Improved Connectivity to Hyderabad** * **Impact:** The response acknowledges their need for better connectivity. The existing train services and the potential for future changes are outlined. * **Action Required:** No direct action. Awareness of existing services is key. **Stakeholder: Residents of Ravindrakhani and Bellampalli Seeking Stoppages for Specific Trains** * **Impact:** The response details existing services and the criteria used to determine new stoppages. * **Action Required:** They can use the information on traffic justification and operational feasibility to support their requests. **Stakeholder: Ministry of Railways** * **Impact:** The Ministry is responsible for assessing and responding to demands for train extensions and stoppages. * **Action Required:** Continue to assess proposals based on established criteria and implement changes as feasible and justified.

Key Entities Referenced

Ministry of Railways: The primary government entity responsible for the policy regarding extension and stoppage of trains. Hyderabad: The city where the extension and stoppage of trains is being considered. Secunderabad: A city in Telangana to which the extension of trains is being considered.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO. 811 TO BE ANSWERED ON 04.02.2026 EXTENSION AND STOPPAGE OF TRAINS FOR HYDERABAD 811. SHRI VAMSI KRISHNA GADDAM: Will the Minister of RAILWAYS be pleased to state: (a) whether the Government has received representations from public representatives and stakeholders seeking extension of Train No. 17036 (Balharshah–Kazipet Passenger) up to Secunderabad to improve connectivity to Hyderabad for daily commuters, students and employees; (b) if so, the details thereof and the action taken by the Government; (c) whether the Government has received requests for providing stoppage at Ravindrakhani (RVKH) Railway Station for Andaman Express (16031/16032) and Kazipet Express (17036), and at Bellampalli Railway Station for Grand Trunk Express (12615/12616); (d) if so, the details of passenger footfall, regional importance and representations received in respect of Ravindrakhani and Bellampalli stations; (e) whether the Government has conducted any feasibility study, traffic survey or operational assessment regarding the extension of Train No. 17036 up to Secunderabad and the grant of stoppages at Ravindrakhani and Bellampalli stations and if so, the details thereof? ANSWER MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND ELECTRONICS & INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW) (a) to (e) Balharshah-Kazipet --Hyderabad sector is presently being served by 18 pairs of train services as listed below: Sl Train No. & Name 1 12213/14 Delhi Sarai Rohilla – Yesvantpur Duronto Express 2 12285/86 Hazrat Nizamuddin – Secunderabad Duronto Express 3 12437/38 Hazrat Nizamuddin – Secunderabad Rajdhani Express 4 12589/90 Gorakhpur – Charlapalli Express 5 12591/92 Gorakhpur – Yesvantpur Express 6 12721/22 Hazrat Nizamuddin – Hyderabad Dakshin Express 1 of 37 12723/24 New Delhi–Hyderabad Deccan Telangana Express 8 12771/72 Raipur – Secunderabad Express 9 12791/92 Danapur – Secunderabad Express 10 15293/94 Muzaffarpur – Charlapalli Amrit Bharat Express 11 17005/06 Raxaul – Hyderabad Express 12 17007/08 Darbhanga – Charlapalli Express 13 17321/22 Jasidh – Vasco-da-Gama Express 14 20101/02 Nagpur–Secunderabad Vande Bharat Express 15 22533/34 Gorakhpur – Yesvantpur Express 16 22691/92 Hazrat Nizamuddin –KSR Bengaluru Rajdhani Express 17 22705/06 Jammu Tawi – Tirupati Humsafar Express 18 22737/38 Hisar – Secunderabad Express Presently, Ravindrakhani is presently being served by 12 train services (listed below). 16031/16032 MGR Chennai-SMVD Katra Andaman Express & 17035/17036 Kazipet-Balharshah Express have scheduled stoppage at Manchiryal/Belampalli. Similarly, Bellampally station is served by 50 train services (listed below). 12615/12616 MGR Chennai-New Delhi Grand Trunk Express has scheduled stoppage at Manchiryal/Sirpur Kagaznagar. Trains serving Ravindrakhani: 1 17233/34 Sirpur Kagaznagar–Secunderabad Bhagyanagar Express 2 17003/04 Kazipet – Sirpur Town Ramgiri Express 3 67771/72 Karimnagar – Sirpur Town MEMU 4 17011/12 Hyderabad – Sirpur Kagaznagar Express 5 17033/34 Bhadrachalam Road – Sirpur Town Singareni Express 6 12757/58 Secunderabad – Sirpur Kagaznagar Express Trains serving Bellampally: 1 11085/86 SMVT Bengaluru–Gwalior Express 2 12511/12 Gorakhpur--Thiruvananthapuram North Rapti Sagar Express 3 12521/22 Barauni–Ernakulam Rapti Sagar Express 4 12589/90 Gorakhpur– Charlapalli Express 5 12591/92 Gorakhpur–Yesvantpur Express 6 12616 New Delhi–MGR Chennai Grand Trunk Express 7 12707/08 Tirupati–Hazrat Nizamuddin Andhra Pradesh Sampark Kranti Express 8 12721/22 Hyderabad– Hazrat Nizamuddin Dakshin Express 9 12723/24 Hyderabad–New Delhi Telangana Express 10 12757/58 Secunderabad–Sirpur Kagaznagar Express 11 12771/72 Secunderabad–Raipur Express 2 of 312 12791/92 Secunderabad–Danapur Express 13 12970 Jaipur–Coimbatore Express 14 12975/76 Mysuru–Jaipur Express 15 15293/94 Muzaffarpur–Charlapalli Amrit Bharat Express 16 16031/32 MGR Chennai–SMVD Katra Andaman Express 17 16093/94 MGR Chennai–Lucknow Express 18 17003/04 Kazipet–Sirpur Kagaznagar Ramgiri Express 19 17011/12 Hyderabad–Sirpur Kagaznagar Express 20 17033/34 Bhadrachalam Road – Balharshah Singareni Express 21 17035/36 Kazipet–Balharshah Express 22 17233/34 Secunderabad–Sirpur Kagaznagar Bhagyanagar Express 23 22645/46 Indore–Thiruvananthapuram North Ahilyanagari Express 24 22647/48 Korba– Thiruvananthapuram North Express 25 22669/70 Ernakulam–Patna Express 26 67771/72 Sirpur Town–Karimnagar MEMU Besides, provision of stoppage of train services, depends on the traffic justification, operational feasibility including availability of extra time on the section & availability of matching infrastructure such as Platform length etc. Further, Proposals/ requests/ suggestions/ representations, both formal and informal inter alia for introduction/restoration of trains are received from Members of Parliament, elected representatives, organizations/rail users etc. at various levels including Railway Board, Zonal Railways, Divisional Office etc. As receipt of such proposals/ requests/ suggestions is a continuous and dynamic process, centralized compendium of such requests is not maintained. However, these are examined and action as found feasible and justified is taken from time to time, which is an on-going process. Besides, extension of train services on any route/section depends on various factors which include- • Capacity of that section • Availability of path • Availability of required rolling stock • Availability of matching infrastructure for rolling stock • Maintenance requirement of railway tracks and other assets ******* 3 of 3

Continue your research