**Executive Summary**
This document is a response to Unstarred Question No. 907 in the Lok Sabha concerning the Guwahati-Tezpur and Tezpur-Silghat railway line projects. The Minister of Railways provided updates on the Detailed Project Reports (DPRs) for new line projects and the Amrit Bharat Station Scheme for station redevelopment, also discussing fund allocation for Assam. The response was prepared in anticipation of a hearing on February 4, 2026.
**Key Points / Main Content**
* **New Railway Line Projects:**
* Detailed Project Reports (DPRs) have been prepared for the following:
* Agthori (Guwahati) - Dekargaon (Tezpur) New Line Project (129 km)
* Dekargaon (Tezpur) - Silghat New Line Project (25 km)
* Sanctioning of the project requires consultation with stakeholders (including State Governments), NITI Aayog, and Ministry of Finance. Timelines depend on appraisals and approvals from stakeholders.
* **Existing Rail Infrastructure in Tezpur:**
* Dekargaon serves as the main station for Tezpur.
* Dekargaon is served by 6 pairs of train services.
* **Amrit Bharat Station Scheme:**
* The Ministry of Railways has launched the Amrit Bharat Station Scheme for long-term station redevelopment.
* The scheme involves phased master plan preparation and implementation with the following components:
* Improvement of access to station and circulating areas
* Integration of station with both sides of city
* Improvement of station building
* Improvement of waiting halls, toilets, sitting arrangement, water booths
* Provision of wider foot over bridge/air concourse commensurate with passenger traffic
* Provision of lift/escalators/ramp
* Improvement /Provision of platform surface and cover over platforms
* Provision of kiosks for local products through schemes like ‘One Station One Product'
* Parking areas, Multimodal integration
* Amenities for Divyangjans
* Better passenger information systems
* Provision of executive lounges, nominated spaces for business meetings, landscaping, etc.
* The scheme also envisages sustainable and environment friendly solutions, provision of ballastless tracks, and creation of city centre at the station.
* 1337 stations have been identified for development under the scheme, with 50 stations located in Assam.
* One station (Haibargaon) in Assam has been completed.
* Work is underway at Rangapara North Jn, Majbat, Viswanath Chariali, and Fakiragram Jn stations.
* **Funding and Implementation:**
* Development/Upgradation/Modernization is continuous.
* Implementation is subject to inter-se priority and availability of funds.
* Development/Upgradation is complex and requires statutory clearances.
* Amrit Bharat Station Scheme is funded under Plan Head-53 'Customer Amenities'.
* For the current year, ₹ 435 crore has been allocated, and expenditure of ₹ 365 crore has been incurred (up to December, 2025) for the Northeast Frontier Railway.
**Impact Analysis**
**Stakeholder: Railway Passengers**
* **Impact:** Improved railway infrastructure and amenities, increased connectivity and frequency of passenger rail services, enhanced passenger experience at stations.
* **Action Required:** None explicitly mentioned for railway passengers.
**Stakeholder: Residents of Tezpur and Surrounding Areas**
* **Impact:** Potential for boosted economic development due to improved railway connectivity.
* **Action Required:** None explicitly mentioned.
**Stakeholder: State Governments (including Assam)**
* **Impact:** Collaboration required for project approvals and implementation of railway projects, potential for regional development and enhanced transport infrastructure.
* **Action Required:** Consultation with the Ministry of Railways and providing necessary approvals for project sanctioning.
**Stakeholder: Ministry of Finance and NITI Aayog**
* **Impact:** Appraisal of project proposals and provision of necessary approvals for funding and implementation.
* **Action Required:** Review and approval of DPRs for the new railway line projects.
**Stakeholder: Ministry of Railways**
* **Impact:** Responsible for planning, funding, and implementing railway infrastructure development projects, coordinating with various stakeholders, ensuring statutory clearances, and managing the Amrit Bharat Station Scheme.
* **Action Required:** Secure approvals, allocate funds, and oversee the execution of projects.
Key Entities Referenced
Amrit Bharat Station Scheme: Scheme launched by the Ministry of Railways for the redevelopment of railway stations with a long-term approach. The scheme focuses on improving infrastructure and amenities at stations.
Ministry of Railways: The Indian government ministry responsible for the country's railway infrastructure and operations. They are answering questions on railway projects.
Guwahati-Tezpur and Tezpur-Silghat Railway Line: Proposed new railway line project in Assam, India. This line and its status are the primary subject of the parliamentary question.
Assam: State in India where the railway line projects and station upgrades are located. Several stations in the state are part of the Amrit Bharat Station Scheme.
NITI Aayog: Think tank of the Government of India that is involved in the approval process of railway projects.
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 907
TO BE ANSWERED ON 04.02.2026
GUWAHATI-TEZPUR AND TEZPUR-SILGHAT RAILWAY LINE
†907. SHRI RANJIT DUTTA:
Will the Minister of RAILWAYS be pleased to state:
(a) the present status of the approved Final Location Survey (FLS) for the
new railway lines specifically the proposed Guwahati-Tezpur line and
the Tezpur-Silghat line;
(b) the expected timeline for the implementation and completion of these
projects;
(c) the details of the steps taken to improve the existing rail infrastructure
in Tezpur district including upgrading and modernizing stations and
providing better passenger amenities;
(d) whether the Government proposes to increase the connectivity,
frequency and quality of passenger rail services in this region and if so,
the details thereof;
(e) whether the Government proposes additional initiative to strengthen the
overall railway network and boost enconomic development in Tezpur
and surrounding areas; and
(f) if so, the details thereof and if not, the reasons therefor?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (f): Detailed Project Report (DPR) for Agthori (Guwahati) - Dekargaon
(Tezpur) New Line Project (129 Km) and Dekargaon (Tezpur) - Silghat New
Line Project (25 Km), has been prepared.
After preparation of Detailed Project Report (DPR), sanctioning of project
Contd...2/--:2:-
requires consultation with various stake-holders including State
Governments and necessary approvals viz. appraisal of NITI Aayog,
Ministry of Finance etc. As sanctioning of projects is a continuous and
dynamic process, exact timelines depend upon appraisals and approvals by
various stakeholders.
Serving station for Tezpur is Dekargaon which is served by 06 pairs of train
services detailed as under:-
SN Train Number and Name
1 15813/14 Dekargaon - Murkongselek Express
2 15815/16 Guwahati - Dekargaon Intercity Express
3 55821/22 Rangiya - Dekargaon Passenger
4 55823/24 Rangapara North - Dekargaon Passenger
5 55819/20 Mendipathar - Guwahati Passenger
6 55861/62 Rangiya - Dekargaon Passenger
Station Redevelopment
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their implementation
in phases to improve the stations. The master planning includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Contd...3/--:3:-
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement, water
booths
Provision of wider foot over bridge/air concourse commensurate with
passenger traffic
Provision of lift/escalators/ramp
Improvement /Provision of platform surface and cover over platforms
Provision of kiosks for local products through schemes like ‘One
Station One Product’
Parking areas, Multimodal integration
Amenities for Divyangjans
Better passenger information systems
Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity at each
station
The scheme also envisages sustainable and environment friendly solutions,
provision of ballastless tracks etc. as per necessity, phasing and feasibility
and creation of city centre at the station in the long term.
So far, 1337 stations have been identified for development under this
scheme, out of which 50 stations are located in Assam. The names of
stations identified for development under Amrit Bharat Station Scheme in
Assam are as following:
Contd...4/--:4:-
State No. of Name of Stations
Stations
Amguri, Arunachal, Chaparmukh, Dhemaji,
Dhubri, Dibrugarh, Diphu, Duliajan, Fakiragram
Jn., Gauripur, Gohpur, Golaghat, Gosai gaon hat,
Guwahati, Haibargaon, Harmuti, Hojai, Jagi
Road, Jorhat Town, Kamakhya Jn, Kokrajhar,
Lanka, Ledo, Lumding Jn, Majbat, Makum Jn,
Margherita, Mariani Jn, Murkongselek,
Assam 50
Naharkatiya, Nalbari, Namrup, Narangi, New
Bongaigaon Jn, New Haflong, New Karimganj
Jn, New Tinsukia Jn, North Lakhimpur,
Pathshala, Rangapara North Jn, Rangiya Jn,
Sarupathar, Sibsagar Town, Silapathar, Silchar,
Simaluguri, Tangla, Tinsukia, Udalguri,
Viswanath Chariali
Development works at railway stations under Amrit Bharat Station Scheme
in Assam have been taken up at a good pace. Till now, works of 1 station
(Haibargaon) in Assam have been completed under this scheme. The works
at other stations have also been taken up at good pace and progress of
some of the above stations is as given below:
Rangapara North Jn station: The works of Prefabricated Passenger
(PP) shed and platform extension work of platform no. 5 have been
completed. The works of circulating area, 12 m wide Foot Over
Bridge, 1st and 2nd entry of station, improvement to station building
and platform surfacing have been taken up.
Contd...5/--:5:-
Majbat station: The works of improvement to station building,
improvement of circulating area and approach road, platform
extension, drainage, entrance porches and executive lounge have
been completed. The work of lift has been taken up.
Viswanath Chariali station: The works of improvement to station
building, improvement of circulating area and approach road,
Prefabricated Passenger (PP) shed, platform extension, toilets, porch
and executive lounge have been completed. The works of lift and
tactile pathway have been taken up.
Fakiragram Jn station: The works of improvement to station building,
approach road, Prefabricated Passenger (PP) shed, baby feeding
room, toilets, porch and executive lounge have been completed. The
works of 12 m wide Foot Over Bridge, lift and tactile pathway have
been taken up.
Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways is a continuous and ongoing process and works
in this regard are undertaken as per requirement, subject to inter-se
priority and availability of funds. Development / redevelopment /
upgradation / modernisation of a station is carried out based on category
of station/condition/traffic handled etc.
Development / Upgradation of railway stations is complex in nature
involving safety of passengers & trains and requires various statutory
clearances such as fire clearance, heritage, tree cutting, airport clearance
etc. The progress also gets affected due to brownfield related challenges
such as shifting of utilities (involving water/sewage lines, optical fibre
Contd...6/--:6:-
cables, gas pipe lines, power/signal cables, etc.), infringements, operation
of trains without hindering passenger movement, speed restrictions due to
works carried out in close proximity of tracks and high voltage power lines,
etc. and these factors affect the completion time. Therefore, no time frame
can be indicated at this stage.
Further, development / upgradation / modernization of stations including
Amrit Bharat Station Scheme is generally funded under Plan Head-53
‘Customer Amenities’. The details of allocation and expenditure under Plan
Head-53 are maintained Zonal Railway-wise and not work-wise or station-
wise or state-wise. Assam is covered under the jurisdiction of Northeast
Frontier Railway. For the current year, ₹ 435 crore has been allocated while
an expenditure of ₹ 365 crore has been incurred (up to December, 2025).
*****