See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 5501
TO BE ANSWERED ON 25.03.2026
HIGH DENSITY NETWORK OF RAILWAYS
5501. SHRI G KUMAR NAIK:
Will the Minister of RAILWAYS be pleased to state:
(a) the details of the High Density Network (HDN) of Indian Railways at
present including total route-kilometres covered, corridor-wise length
and their share in overall passenger and freight traffic;
(b) the details of the number of High Density Network corridors identified
during the last ten years and whether any new corridors have been
added or reclassified during this period and if so, the details thereof;
(c) whether any High Density Network corridor passes through the State of
Karnataka and if so, the details thereof and if not, the reasons therefor
including the average line capacity utilisation across various railway
zones; and
(d) the details of the decongestion measures undertaken during the last ten
years on HDN and non-HDN corridors, year-wise and State-wise?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (d) There are 7 High Density Network (HDN) Routes on Indian
Railways. The details are as under:
HDN Route Route km
HDN-1 Delhi – Howrah 1463km
HDN-2 Howrah – Mumbai 1889km
HDN-3 Delhi – Mumbai 1387km
HDN-4 Delhi – Guwahati 1845km
HDN-5 Delhi – Chennai 2048km
§ Page 1 of 6HDN-6 Howrah – Chennai 1113km
(Kharagpur - Vijayawada)
HDN-7 Mumbai – Chennai 1224km
HDN routes cover about 16% of the total rail network and handle about
41% of total rail traffic. The HDN-7, Mumbai–Chennai route passes through
the state of Karnataka.
During last 11 years Indian Railways has undertaken a large number of
capacity augmentation, network expansion and infrastructure
modernization projects across the country to improve the capacity of the
railway network.
The details of commissioning/laying of new track across Indian Railways
are given below:
Period New Track Commissioned Average Commissioning of New
Tracks
2009-14 7,599 km 4.2 km/day
2014-25 34,428 km 8.6 km/day (more than 2 times)
As on 01.04.2025, across Indian Railways, 431 railway infrastructure
projects (154 New Line, 33 Gauge Conversion and 244 Doubling projects) of
total length 35,966 km, costing approximately ₹6.75 lakh crore are
sanctioned. The summary is as under:
Category No. of Total Length Length Total Exp.
Projects NL/GC/DL Commissioned till upto Mar’25
(km) Mar’25 (km) (₹ in Cr)
New lines 154 16,142 3,036 1,45,318
Gauge 33 4,180 2,997 22,753
Conversion
Page 2 of 6Doubling/ 244 15,644 6,736 1,22,858
Multitracking
Total 431 35,966 12,769 2,90,929
In addition to the construction of new lines, gauge conversion,
doubling/multitracking, additional measures taken up to decongest railway
network and upgrade/modernize railway infrastructure include:
Dedicated Freight Corridors (DFC): Ministry of Railways has taken up
construction of two Dedicated Freight Corridors (DFC) viz. Eastern
Dedicated Freight Corridor (EDFC) from Ludhiana to Sonnagar (1337 km)
and the Western Dedicated Freight Corridor (WDFC) from Jawaharlal Nehru
Port Terminal (JNPT) to Dadri (1506 km). The work on EDFC has been
completed and commissioned. In WDFC, 1404 Rkm out of total 1506 Rkm
has been completed and commissioned. The balance work on WDFC from
Vaitarna-JNPT section (102Rkm) has been taken up. DFC has contributed to
creating additional paths on the conventional network by diverting freight
traffic to EDFC and WDFC. Presently, 443 average trains per day are being
run on these corridors.
Karnataka:
Budget allocation in the recent years has increased significantly.Budget
allocation for infrastructure projects and safetyworks, falling fully/partly in
the State of Karnataka is as under:
Period Outlay
2009–14 ₹835 crore/year
2025–26 ₹7,564 crore (more than 9 times)
Page 3 of 6As on 01.04.2025, 25 projects (15 new lines, 10 doubling) of 3,264 km
length, costing ₹ 42,517 crore falling fully/partly in Karnataka are
sanctioned. The summary is as under:
Category No. of Total Length Length Exp upto
sanctioned (in km) Commissioned Mar’25 (₹
Projects upto Mar’25 in cr.)
(km)
New Line 15 2,034 421 8,794
Doubling/ 10 1,230 973 12,516
Multi-
tracking
Total 25 3,264 1,394 21,310
Details of some of the recently completed projects falling fully/partly in the
state of Karnataka are as under:
S. Project Cost (₹ in Crores)
No
1 Kotturu–Harihar new line (65 km) 468
2 Hassan–Bengaluru new line (167 km) 1,290
3 Bidar–Gulbarga new line (110 km) 1,543
4 Shivani–Hosadurga Road doubling (10 km) 50
5 Shivani–Birur doubling (29 km) 143
6 Hosadurga–Chikjajur doubling (29 km) 260
7 Ramanagaram–Mysuru patch doubling (94 km) 998
8 Yelahanka – Channasandra doubling (13 km) 108
9 Yesvantpur–Yelahanka doubling (12 km) 95
10 Netravathi–Mangaluru Central doubling (2 km) 28
11 Kankanadi–Panamburu doubling (19 km) 350
12 Arsikere–Tumakuru doubling (96 km) 758
13 Yelahanka–Penukonda doubling (123 km) 1,104
Page 4 of 614 Daund–Gulbarga doubling (225 km) 3,182
15 Hubballi–Chikjajur doubling (190 km) 1,850
Details of some of the major projects taken up falling fully/partly in the
state of Karnataka are as under:
S. Project Cost (₹ in
No Crores)
1 Hosapete–Hubballi–Londa–Vasco-de-Gama doubling 4,153
(312 km)
2 Hotgi–Gadag doubling (284 km) 2,459
3 Ginigera–Raichur new line (165 km) 3,401
4 Gadag – Wadi new line (257 km) 2,842
5 Bagalkot – Kudachi new line (142 km) 1,649
6 Tumakuru – Rayadurga new line (207 km) 2,496
7 Tumakuru – Davangere new line (182 km) 2,142
8 Kadur – Chikkamagaluru – Belur new line (68 km) 825
9 Baiyyapanahalli – Hosur doubling (48 km) 336
10 Yesvantpur – Channasandra doubling (22 km) 314
11 Hosapete – Ballari 3rd & 4th line (65 Km) 2,372
12 Ballari-Chikjajur doubling (185 KM) 3,342
13 Bypass line between Bettahalsoor-Rajankunte 248
(6 Km)
Details of some of the major projects which are delayed due to land
acquisition are as under:-
S Project Total Land Balance
No. Land acquired Land to be
required (in ha) acquired
(in ha) (in ha)
Page 5 of 61 Shivamogga – Ranibennur new 559 226 333
line (96 km)
2 Belgaum – Dharwad new line 581 0 581
(73 km)
3 Shivamogga – Harihar new line 488 0 488
(79 km)
4 Whitefield–Kolar new line (53 337 0 337
km)
5 Hassan–Belur new line (32 km) 206 0 206
Summary of the status of land acquisition in Karnataka is as under:
Particulars Details
Total Land required for Projects in Karnataka 9,064 ha
Land Acquired 5,707 ha (63%)
Balance Land to be acquired 3,357 ha (37%)
Government of India is geared up to execute projects, however success
depends upon the support of Government of Karnataka.
*****
Page 6 of 6