Parliament Question: Hydrogen-powered Train

Issued by RAILWAYS · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO. 5425 TO BE ANSWERED ON 25.03.2026 HYDROGEN-POWERED TRAIN 5425. SHRI JAI PRAKASH: SHRI DHARAMBIR SINGH: Will the Minister of RAILWAYS be pleased to state: (a) whether the Government has assessed the ongoing trials of Country’s first indigenously designed and manufactured “Hydrogen-powered train", a key initiative under the “Hydrogen for Heritage” project in order to meet net-zero carbon emission targets by the year 2030 and if so, the details thereof; (b) the timeline by when the Hydrogen-powered train is likely to be started; (c) the progress made on introduction of Vande Bharat Sleeper trains; (d) the details of the steps taken to improve passenger amenities and reduce travel time on major corridors; (e) the details of the number of new railway lines and doubling projects sanctioned during the last three years; and (f) whether the Government proposes to strengthen railway connectivity or introduce new railway projects benefiting Bhiwani–Mahendergarh region of Haryana and if so, the details thereof? ANSWER MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND ELECTRONICS & INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW) (a) & (b) Indian Railways (IR) has taken up a state-of-the-art project for running of its first hydrogen train, on pilot basis, as per specifications framed by the Research, Design & Standards Organization (RDSO) to demonstrate the use of hydrogen powered train technology in Railways. The project establishes the commitment of IR towards advancements in § Page 1 of 13alternative energy-powered train travel thereby ensuring a cleaner and greener future for the country’s transportation sector in order to meet net- zero carbon emission targets of IR. This project involved designing from first stages, prototype manufacturing and first-time development of hydrogen traction technology in Indian Railways. Manufacturing of Hydrogen Train-set has been completed. Prominent features of Hydrogen Train-set are as below:  Designed and Developed in India demonstrating IR’s commitment to Atmanirbhar Bharat.  Presently, it is the world’s longest (10 coaches) and most powerful (2400 kW) Hydrogen Train-set on Broad Gauge platform.  The train-set comprises of two Driving Power Cars (DPCs) of 1200 kW each, totalling 2400 kW along with eight passenger cars.  Zero CO2 emissions; only emission is water vapour.  Major step in development of next generation fuel technology in Railways. (c) IR is focussed on providing affordable and good quality services to all sections of society. With a view to improve travel experience of the passengers, IR have introduced indigenously designed and manufactured Vande Bharat Sleeper train services with modern coaches, advanced safety features and passenger amenities. Presently, 02 Vande Bharat Sleeper services are in operation on the Indian Railway network. Broad technological advancements and Safety features, provided in Vande Bharat Sleeper Trains are as below: 1. Jerk Free Semi permanent couplers and Anti Climbers. 2. Fitted with KAVACH. 3. Higher acceleration with design/operating speed of 180/160 KMPH. 4. Crashworthy Design of Car body complying with EN standards. Page 2 of 135. Fire barrier doors at the end of each coach for compliance of fire safety standards. 6. Aerosol based fire detection and suppression system in electrical cabinets and lavatories. 7. Regenerative braking system for energy efficiency. 8. Air conditioning units provided with indigenously developed UV-C lamp-based disinfection system for deactivating 99% harmful bacteria from conditioned air to improve the hygiene standards inside the passenger area. 9. Centrally controlled Automatic Plug Doors and Fully sealed wider gangways. 10. CCTVs in all coaches. 11. Emergency talk-back unit for communication between Passenger and Train Manager/Loco Pilot in case of emergency. 12. For Divyangjan passengers, special lavatory in the driving coaches on each end 13. Centralized Coach Monitoring System for better condition monitoring of passenger amenities such as Air conditioning, Saloon Lighting etc. 14. Ergonomically designed ladder for ease of climbing on to upper berths. (d) Upgradation of passenger amenities is a continuous process depending upon need, volume of the passenger traffic and inter-se priority of work, subject to availability of funds. IR has taken several measures for enhanced passenger amenities like modernization of stations under ‘Amrit Bharat Station’ scheme and upgradation of coaches with modern passenger facilities, deployment of digital platforms for grievance redressal/ monitoring, improvement in onboard services, infrastructure augmentation, advanced signalling systems and rationalisation of timetables. Page 3 of 13(e) & (f) Capacity enhancement of railway network has been taken up by Indian Railways in a big way during last 11 years. The details of commissioning/laying of new track across Indian Railways is given below:- New track Period Average commissioning of new tracks Commissioned 2009-14 7,599 Km 4.2 Km/day 2014-25 34,428 Km 8.6 Km/day (more than 2 times) As on 01.04.2025, across Indian Railways, 431 Railway infrastructure projects including port-connectivity (154 New Line, 33 Gauge Conversion and 244 Doubling) of total length 35,966 Km, costing approx. Rs. 6.75 lakh crore are sanctioned. The summary is as under:- Total Length Total Expupto No of Length Commissioned Category Mar'25 Projects NL/GC/DL till Mar'25 (Rs. in Cr) (km) (Km) New Lines 154 16,142 3,036 1,45,318 Gauge 33 4,180 2,997 22,753 Conversion Doubling / 244 15,644 6,736 1,22,858 Multitracking Total 431 35,966 12,769 2,90,929 Zone-wise/year-wise details of all Railway projects are made available in public domain on Indian Railway’s website. During last 3 years (2022-23, 2023-24, 2024-25) and current Financial Year 2025-26, 300 projects (51 New Line, 17 Gauge Conversion and 232 Page 4 of 13Doubling) of a total length of 13,808 km have been sanctioned across Indian Railways. Some of the major projects sanctioned are as follows: SN Project Name Cost (₹ in Crore) 1 Chopan – Chunar doubling (102 Km) 1,553 2 Guntur – Bibinagar doubling (239 Km) 3,238 3 Mudkhed – Medchal& Mahbubnagar – Dhone doubling 5,655 (418 Km) 4 Samakhiali – Gandhidham Quadrupling (53 Km) 1,571 5 Merta City – Ras& Bypass at Merta Road new line (56 1,038 Km) 6 Lumding – Furkating doubling (140 Km) 2,334 7 Ajmer – Chanderiya doubling (178 Km) 1,813 8 Motumari – Vishnupuram with RoR doubling (100 Km) 1,746 9 Bikramshila – Katareah new line with new bridge on river 2,549 ganga (26 Km) 10 Gunupur – Therubali new line (74 Km) 1,326 11 Malkangiri – Pandurangapuram new line (174 Km) 4,109 12 Badampahar – Kendujhargarh new line (82 Km) 2,106 13 Junagarh – Nabarangpur new line (116 Km) 3,274 14 Buramara – Chakulia new line (60 Km) 1,639 Page 5 of 13SN Project Name Cost (₹ in Crore) 15 Ajanta Caves Rail Connectivity (174 Km) 7,105 16 Bangriposi – Gorumahisani new line (86 Km) 2,549 17 Chandil – Anara – Damodar 3rd line (121 Km) 2,170 18 Bargarh Road – Nawapara Road new line (138 Km) 2,926 19 Sardega – Bhalumuda new double line (37 Km) 1,360 20 Varanasi – Pt. DeenDayalUpadhyayaMultitracking with 2,642 rail cum road bridge on river ganga (15 Km) 21 Jalgaon – Manmad 4th line (160 Km) 2,773 22 Bhusawal – Khandwa 3rd & 4th line (131 Km) 3,514 23 Sambalpur – Jarapada 3rd & 4th line (127 Km) 3,916 24 Jharsuguda – Sason 3rd & 4th line (35 Km) 1,181 25 Gondia – Ballarshah doubling (240 Km) 4,819 26 Kharsia – Naya Raipur – Parmalkasa 5th & 6th line (278 8,741 Km) 27 Wardha – Balharshah Quadrupling (135 Km) 2,381 28 Ballari – Chikjajur doubling (185 Km) 3,342 29 Koderma – Barkakana doubling (133 Km) 3,063 30 Itarsi – Nagpur 4th line (297 Km) 5,451 31 Dangoaposi – Jaroli 3rd & 4th line (43 Km) 1,752 32 Secunderabad – Wadi 3rd & 4th line (173 Km) 5,012 Page 6 of 13SN Project Name Cost (₹ in Crore) 33 Furkating – New Tinsukia doubling (194 Km) 3,634 34 Bakhtiyarpur – Rajgir – Tilaiya doubling (104 Km) 2,192 35 Gondia – Dongargarh 4th line (84 Km) 2,223 36 Wardha – Bhusawal 3rd & 4th line (314 Km) 9,197 37 Hosapete – Bellary quadrupling (65 Km) 2,372 38 Kasara – Manmad 3rd & 4th line (131 Km) 10,154 39 Punarakh – Kiul 3rd & 4th line (50 Km) 2,668 40 Gamharia – Chandil 3rd & 4th line (55 Km) 1,168 41 Sainthia- Pakhur 4th Line (81 Km) 1,569 42 Santragachi- Kharagpur 4th line (111 Km) 2,905 43 Nergundi – Barang&Khurda Road – Vizianagaram 3rd line 5,618 (385 Km) 44 Son Nagar – Andal Multi tracking (375 Km) 13,606 45 Gorakhpur Cantt – Valmiki Nagar doubling (96 Km) 1,270 46 Jaipur – SawaiMadhopur doubling (131 Km) 1,269 47 Luni – Samdari – Bhildi doubling (272 Km) 3,531 48 Narkatiaganj – Raxaul – Sitamarhi – 4,553 Darbhanga&Sitamarhi – Muzaffarpur doubling (256 Km) 49 Prayagraj (Iradatganj) – Manikpur 3rd line (84 Km) 1,640 50 Tirupati – Pakala – Katpadi doubling (104 Km) 1,332 Page 7 of 13SN Project Name Cost (₹ in Crore) 51 Ratlam – Nagda 3rd and 4th line (41 Km) 1,018 52 Aluabari Road – New Jalpaiguri 3rd & 4th line (57 Km) 1,786 53 Aurangabad (ChhatrapatiSambhajinagar) – Parbhani (177 2,179 Km) 54 Bhagalpur – Dumka – Rampurhat doubling (177 Km) 3,169 55 Itarsi – Bina 4th line (237 Km) 4,329 56 Vadodara – Ratlam 3rd & 4th line (259 Km) 8,885 57 DevbhumiDwarka (Okha) – Kanalus doubling (141 Km) 1,457 58 Badlapur – Karjat 3rd and 4th line (32 Km) 1,324 59 Delhi – Ambala Cantt 3rd & 4th line (194 Km) 5,983 60 Gondia – Jabalpur doubling (231 Km) 5,236 61 Manmad – Indore new line (360 Km) 18,529 62 Errupelam – Amaravati – Nambur new line (57 Km) 2,245 63 Vadhavan Port and New Palghar station new double line 1,507 (22 Km) 64 Deshalpar – Hajipir – Luna and Vayor – Lakhpat new line 2,526 (145 Km) Page 8 of 13Haryana Railway Budget: Budget allocation for Infrastructure projects and safety works, falling fully/partly in the State of Haryana is as under: Period Outlay 2009-14 ₹315 crore/year 2025-26 ₹ 3,416 Cr. (nearly 11 times) Projects sanctioned: As on 01.04.2025, 8 projects (01 New Lines and 07 Doubling), covering a total length of 491 km, costing ₹6775 crore, falling fully/partly in Haryana are sanctioned. The summary is as under: Category No. of Total Length Expenditure projects Length Commissioned upto March (in Km) (in Km) 2025 (₹ in Cr) New Lines 1 28 0 925 Doubling / 7 463 0 646 Multitracking Total 8 491 0 1571 Recently completed projects: Details of some of the recently completed projects falling fully/partly in the State of Haryana are as under: Page 9 of 13Cost S. No. Project (Rs. in Cr.) 1 Jind-Sonepat New Line (89 Km) 800 Suratpura-Hanumangarh-Sriganganagar Gauge 2 896 Conversion (241 Km) Jaipur-Ringus-Sikar-Churu& Sikar-Loharu Gauge 3 1105 Conversion (320 Km) 4 Jakhal- Mansa Doubling (45 Km) 163 5 Khukhrana- Panipat Doubling (8 Km) 58 6 Ambala-Dhapper-chandigarh Doubling (45 Km) 339 7 Tughlakhabad-Palwal 4th line (34 Km) 366 8 Mathura – Palwal 4th Line (80 Km) 669 9 Palwal - New Prithala New Line (10 Km) 66 Ongoing projects: Some of the projects falling fully/partly in the State of Haryana which have been taken up are as under: SN. Project Cost (Rs. in Cr.) 1 Bhiwani-Dobh-Bahali Doubling (42 Km) 471 2 Rewari-Khatuwas Doubling (28 Km) 352 3 Manheru-BawaniKhera Doubling (32 Km) 413 4 Delhi-Panipat- Ambala 3rd& 4th line (194 Km) 5983 Bhiwani and Mahendragarh are existing railway stations on Indian Railway Network and connected via Rewari. To further imporve connectivity in this area, following works have been completed/ taken up : Page 10 of 13S. No. Project Status Rewari-Rohtak New Line 1 commissioned (85 Km) Rohtak-Mehem-Hansi 2 commissioned New Line (64 Km) Rewari-Manheru Doubling 3 commissioned (69 Km) Khatuwas-Narnaul 4 commissioned Doubling (24 km) A. Kund-Kathuwas (5 km) commissioned. B. Rewari-Kori-Pali-Kund-Kori (23 km): The status is as under: Rewari-Khatuwas  Land acquisition completed 5 Doubling (28 km)  Works taken up on all 2 major bridges  Works taken up on all 3 RUBs  Works completed on all 3 Station Buildings A. Dobh-Kalanur Kalan (13 km) commissioned. B. Kalanur Kalan-Bhiwani City- BhiwaniJn (29 km).The status is as Bhiwani-Dobh-Bhali under: 6 doubling (42 km)  Land acquisition work taken up.  Work taken up on 1 Major Bridge.  Works completed on all 2 Station Buildings. Page 11 of 13S. No. Project Status A. Manheru-Bhiwani Jn.(14 km) commissioned. B. BhiwaniJn -BhiwaniKhera (18 km): The status is as under: Manheru-BhiwaniKhera 7 Doubling (32 km)  Land Acquisition work taken up.  Works taken up on all 4 RUBs  Works completed on all 03 Station Buildings. Rewari - Sadulpur DPR prepared 8 Doubling (141 km) Jhajjar-CharkhiDadri- Survey sanctioned 9 Loharu New Line (94 km) Bhiwani-Hansi Doubling Survey sanctioned 10 (37km) After preparation of Detailed Project Report (DPR), sanctioning of project requires consultation with various stake-holders including State Governments and necessary approvals viz. appraisal of NITI Aayog, Ministry of Finance etc. As sanctioning of projects is a continuous and dynamic process, exact timelines depend upon appraisals and approvals by various stakeholders. Sanction of any railway project depends upon many parameters/factors which include the following:  Anticipated traffic projections and Remunerativeness of the proposed route  First and last mile connectivity provided by the project Page 12 of 13 Connection of missing links and providing additional route  Augmentation of congested/saturated lines  Demands raised by State Governments/Central Ministries/Public representatives,  Railway’s own operational requirements  Socio-economic considerations  Overall availability of funds Completion of Railway project/s depends on various factors which include the following:  Land acquisition by State Government  Forest clearance  Shifting of infringing utilities  Statutory clearances from various authorities  Geological and topographical conditions of area  Law and order situation in the area of project site  Number of working months in a year for particular project site etc. All these factors affect the completion time and cost of the project/s. ***** Page 13 of 13

Continue your research