**Executive Summary**
The document is an answer to an unstarred question in Lok Sabha regarding the implementation of Phase-IV of the Pradhan Mantri Gram Sadak Yojana (PMGSY), specifically concerning the DhartiAabaJanjatiya Gram UtkarshAbhiyan (DA-JGUA) and the Pradhan MantriAnusuchitJaatiAbhyudayYojana (PM-AJAY). PMGSY-IV was launched in September 2024 and will be implemented from Financial Year 2024-25 to 2028-29. Currently, the focus is on executing existing verticals of PMGSY.
**Key Points / Main Content**
* **PMGSY-IV Launch and Coverage:**
* PMGSY-IV was launched in September 2024.
* Aims to provide all-weather connectivity to unconnected habitations based on Census 2011.
* Covers habitations with:
* 500+ population in plain areas.
* 250+ population in North-Eastern and Hill States, Special Category areas (including Tribal Schedule-V, Aspirational Districts or Blocks, and Desert Areas).
* 100+ population in districts affected by Left Wing Extremism.
* Implementation period is Financial Year 2024-25 to 2028-29.
* **Integration of DA-JGUA and PM-AJAY:**
* Ministry of Rural Development integrated road connectivity components of DhartiAabaJanjatiya Gram UtkarshAbhiyan (DA-JGUA) and Pradhan MantriAnusuchitJaatiAbhyudayYojana (PM-AJAY) through convergence with PMGSY-IV.
* Priority given to unconnected habitations under DA-JGUA with:
* 500+ population and at least 50% Scheduled Tribe population, or those in Aspirational Districts with 250+ population and at least 50 Scheduled Tribe members.
* Under PM-AJAY, priority to unconnected habitations with 500+ population and at least 40% Scheduled Caste population as per Census 2011.
* **Uttar Pradesh Status:**
* Survey work to identify eligible habitations completed in Uttar Pradesh.
* 70 unconnected habitations identified under DA-JGUA parameters and 165 under PM-AJAY parameters.
* State is preparing Detailed Project Reports (DPRs) for these habitations.
* Specific details of road length approved and works completed will be determined after DPR submission and formal sanction.
* **Road Sanction Mechanism:**
* Roads are sanctioned under a well-settled mechanism.
* Appraised at the Pre Empowered Committee (Pre EC) and Empowered Committee (EC) levels.
* State submits a compliance report to observations raised during meetings.
* Clearance issued after meeting program guidelines and obtaining necessary approvals.
* **Future Plans:**
* Current focus is on execution of existing PMGSY verticals.
* No proposal for a new vertical under PMGSY is currently under consideration.
**Impact Analysis**
**Stakeholder: States and Union Territories**
* **Impact:** Must converge their rural road development efforts under DA-JGUA and PM-AJAY with PMGSY-IV to avail benefits.
* **Action Required:** Prioritize unconnected habitations as per the defined criteria (population and Scheduled Tribe/Caste percentages) and submit Detailed Project Reports (DPRs) for identified habitations.
**Stakeholder: State of Uttar Pradesh**
* **Impact:** Has completed the survey and identified habitations, now needing to progress to project planning and execution.
* **Action Required:** Expedite the preparation of Detailed Project Reports (DPRs) for the 70 DA-JGUA and 165 PM-AJAY identified habitations for submission and formal sanction.
**Stakeholder: Ministry of Rural Development**
* **Impact:** Oversees the PMGSY-IV implementation and the convergence of DA-JGUA and PM-AJAY.
* **Action Required:** Continue to monitor the progress of the program, focusing on existing PMGSY verticals and evaluating DPRs submitted by states, providing necessary approvals.
Key Entities Referenced
Pradhan Mantri Gram Sadak Yojana (PMGSY): A rural road connectivity program. This document discusses Phase-IV (PMGSY-IV) of the program.
Ministry of Rural Development: The central ministry responsible for the implementation of PMGSY and related schemes.
DhartiAabaJanjatiya Gram UtkarshAbhiyan (DA-JGUA): A program that integrates road connectivity with PMGSY for specific tribal villages.
Pradhan MantriAnusuchitJaatiAbhyudayYojana (PM-AJAY): A program that integrates road connectivity with PMGSY for villages with significant Scheduled Caste populations.
Uttar Pradesh: A state in India where the implementation of PMGSY, DA-JGUA, and PM-AJAY is being surveyed and planned.
GOVERNMENT OF INDIA
MINISTRY OF RURAL DEVELOPMENT
DEPARTMENT OF RURAL DEVELOPMENT
LOK SABHA
UNSTARRED QUESTION NO. 619
ANSWERED ON 03/02/2026
IMPLEMENTATION OF PMGSY
619. Shri Karan Bhushan Singh:
Will the Minister of RURAL DEVELOPMENT be pleased to state:
(a) the details of the implementation of Phase-IV of the Pradhan
Mantri Gram SadakYojana (PMGSY) in respect of the
DhartiAabaJanjatiya Gram UtkarshAbhiyan (DA-JGUA) and the
Pradhan MantriAnusuchitJaatiAbhyudayYojana (PM-AJAY);
(b) the steps taken, habitations identified and roads sanctioned
for the benefit of Scheduled Castes (SCs) and Scheduled Tribes
(STs) along with the number of habitations covered, road
length approved, works completed in the State of Uttar
Pradesh, district-wise; and
(c) whether the Government intends to introduce further phases
under PMGSY, if so, the details thereof?
ANSWER
MINISTER OF STATE IN THE MINISTRY OF RURAL DEVELOPMENT
(SHRI KAMLESH PASWAN)
(a) to (c): A new vertical under the Pradhan Mantri Gram
SadakYojana called PMGSY-IV was launched in September 2024 to
provide all-weather connectivity to unconnected habitations based
on Census 2011. This phase covers habitations with a population of
500 or more in plain areas, 250 or more in North-Eastern and Hill
States, Special Category areas including Tribal Schedule-V,
Aspirational Districts or Blocks, and Desert Areas, and 100 or more
in districts affected by Left Wing Extremism. The implementation
period for this scheme extends from the Financial Year 2024-25 to
2028-29.
The Ministry of Rural Development has integrated the road
connectivity components of the DhartiAabaJanjatiya Gram
UtkarshAbhiyan (DA-JGUA) and the Pradhan
MantriAnusuchitJaatiAbhyudayYojana (PM-AJAY) through
Page 1 of 2convergence with PMGSY-IV. This convergence framework applies
to all States and Union Territories. Under this model, priority is
given to unconnected habitations identified under DA-JGUA that
have a population of 500 or more with at least 50% Scheduled Tribe
population, or those in Aspirational Districts with a population of
250 or more including at least 50 Scheduled Tribe members.
Similarly, under PM-AJAY, priority is extended to unconnected
habitations with a population of 500 or more and at least 40%
Scheduled Caste population as per Census 2011.
Regarding the State of Uttar Pradesh, the survey work to
identify eligible habitations has been completed. The State has
reported the identification of 70 unconnected habitations under the
DA-JGUA parameters and 165 unconnected habitations under the
PM-AJAY parameters. However, the State is currently in the process
of preparing the Detailed Project Reports (DPRs) for these identified
habitations. Consequently, the specific details regarding road length
approved and works completed will be determined once these DPRs
are submitted by the State and formally sanctioned. There is a well
settled mechanism for sanction of the roads under PMGSY. It is
appraised at the level of Pre Empowered Committee (Pre EC) and
then at the level of the Empowered Committee (EC). Subsequently,
the State submits the compliance report to the observations raised
during the meetings. If the proposal meets all the parameters of the
programme guidelines, then clearance is issued after getting the
necessary approvals.
Presently, the focus is on execution of existing verticals of
PMGSY and no proposal for the launch of a new vertical under
PMGSY is under consideration.
*****