Infrastructure Development under Samagra Shiksha Abhiyan
†*225. Shri Alok Sharma:
Shri Balabhadra Majhi:
Will the Minister of EDUCATION be pleased to state:
(a) the details of progress made under Samagra Shiksha Abhiyan including infrastructure
development, teachers' capacity building and quality enhancement measures aligned with the
National Education Policy, 2020, State/UT-wise particularly Bulandshahr and Siddharthnagar in
Uttar Pradesh, Bengaluru in Karnataka, Nabarangpur, Shimla, Jalgaon and Bharatpur Lok Sabha
Constituencies;
(b) the measures taken to ensure time-bound implementation and improved learning outcomes in
districts such as Bulandshahr in alignment with the National Education Policy, 2020;
(c) the details of schools upgraded, new residential schools/hostels established, additional
classrooms constructed and Information and Communication Technology (ICT) enabled smart
schools developed during the last three years and the current year in the said districts, Lok Sabha
Constituencies/States/UTs along with their impact on enrollment and retention;
(d) whether the Government proposes to introduce any additional performance-based/linked
incentives or special support mechanisms for States/UTs including aspirational districts/backward
Parliamentary Constituencies such as the Nabarangpur Lok Sabha Constituency that have
demonstrated outstanding outcomes/exemplary results under Samagra Shiksha Abhiyan; and
(e) whether geographical conditions in hilly and remote regions entail additional costs and
challenges in developing educational infrastructure and if so, whether there is any proposal to
provide additional performance-based incentives or special assistance mechanisms for such States
and if so, the details thereof?
ANSWER
MINISTER OF EDUCATION
(SHRI DHARMENDRA PRADHAN)
(a) to (e): A statement is laid on the Table of the House.STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (e) OF LOK SABHA
STARRED QUESTION NO. 225 ANSWERED ON 09TH MARCH, 2026 ASKED BY
HON’BLE MPs SHRI ALOK SHARMA AND SHRI BALABHADRA MAJHI REGARDING
INFRASTRUCTURE DEVELOPMENT UNDER SAMAGRA SHIKSHA ABHIYAN:
(a) & (b) : Samagra Shiksha scheme is an integrated scheme for school education covering
the entire gamut from pre-school to class XII. The scheme treats school education as a continuum
and is in accordance with Sustainable Development Goal for Education (SDG-4). The scheme has
been aligned with the recommendations of NEP 2020 to ensure that all children have access to
quality education with an equitable and inclusive classroom environment which should take care of
their diverse background, multilingual needs, different academic abilities and make them active
participants in the learning process.
Samagra Shiksha Scheme supports creation of infrastructure and basic facilities in
Government Schools, both through direct programme funding and also in convergence with other
relevant schemes of the Central and State Governments. State-wise approval of infrastructure
facilities under Samagra Shiksha in last 3 year is attached at Annexure-I. Further, basic
infrastructure facilities approved for Bulandshahr and Siddharthnagar in Uttar Pradesh, Bengaluru
in Karnataka, Nabarangpur, Shimla, Jalgaon and Bharatpur Lok Sabha Constituencies are attached
at Annexure-I(A). Current status of State-wise basic infrastructure facilities is available on
UDISE+ portal at <http://udiseplus.gov.in/#/en/page/publications>.
Under Samagra Shiksha, there is a dedicated component of Quality and Innovation with a
focus on improving the learning levels of students, wherein funds are provided to states for
interventions such as Learning Enhancement Programme, Youth and Eco Clubs; Holistic Progress
Card; Composite School Grant for providing a conducive learning environment; Libraries; Sports
and Physical Education, etc.
Strengthening of teacher capacity building and quality enhancement measures under the
Centrally Sponsored Scheme of Samagra Shiksha is aligned with the recommendations of the
National Education Policy (NEP), 2020. ΝΕΡ 2020 recommends that teachers be given continuous
opportunities for self-improvement and to learn the latest innovations and advances in their
profession. The Samagra Shiksha scheme provides academic and financial support to States/UTs for
continuous professional development of teachers, institutional strengthening and improvement of
classroom practices.
In-service teacher and teacher educators training is an integral part of Samagra Shiksha
scheme. These trainings are conducted by the concerned States and UTs through State Councils of
Educational Research and Training (SCERTs) and the District Institutes of Education and Training
(DIETs). The details of financial approvals made under the in-service teacher training component of
the Quality and Innovation intervention during the last three years are provided at Annexure–II.
Initiatives such as National Initiative for School Heads’ and Teachers’ Holistic Advancement
(NISHTHA), Digital Infrastructure for Knowledge Sharing (DIKSHA), Integrated Teacher
Education Program (ITEP- Pre-service teacher training) are also being taken for teachers' capacity
building and quality enhancement measures aligned with the National Education Policy, 2020.
National Mission for Mentoring (NMM), as envisaged in para 15.11 of NEP 2020,
conceptualizes the creation of a large pool of outstanding professionals willing to provide
mentoring to school teachers. These potential mentors, regardless of age or position, will contributetowards realizing 21st century developmental goals of our nation. NMM underlines the importance
of short and long-term mentoring/professional support. It brings an opportunity to leverage cross-
learning amongst different individuals leading to their continuous professional development.
Mentors empower school teachers to reach their full potential, improve their teaching practices,
knowledge skills and attitude to positively impact student learning outcomes.
National Professional Standards for Teachers (NPST), as envisaged in Para 5.20 of NEP
2020, focuses to improve the teachers’ personal and professional development by providing them an
understanding of what is expected in terms of their performance and what needs to be done to
enhance the same.
The Government of India has taken several measures to strengthen accountability
mechanisms for teachers and school administrators in achieving better learning outcomes including
Bulandshahr. A key initiative in this regard is the establishment of the National Assessment Centre,
PARAKH, which serves as a central body for setting standards, conducting large-scale assessments,
and providing evidence-based policy recommendations to improve the quality of education.
PARAKH plays a crucial role in developing standardized assessment frameworks, ensuring
consistency in evaluation across different education boards, and promoting competency-based
assessments aligned with the National Education Policy (NEP) 2020. Additionally, the introduction
of the Holistic Progress Card (HPC) has transformed student assessment by providing a 360-degree
evaluation of learners, focusing on cognitive, socio-emotional, and skill-based development rather
than just academic performance.
To improve the Learning Outcomes at Foundational Stage (3 years of Balvatika and Grades
1 & 2), the National Curricular Framework for Foundational Stage (NCF-FS) was released on 20th
October, 2022 providing a structure for the syllabus, Training of Teachers, Learning Teaching
Material (LTM), etc. Accordingly, Jaadui Pitara for Balvatika (3 years of pre-school) and Books for
Grades 1 & 2 have been provided by NCERT for use by States/UTs.
To improve learning outcomes among primary school students, a National Mission called
“National Initiative for Proficiency in Reading with Understanding and Numeracy (NIPUN
Bharat)” has been launched on 5th July, 2021 to ensure that every child in the country attains
foundational literacy and numeracy by the end of Grade 2. Keeping holistic development in mind, a
3 months play based ‘School Preparation Module and Guidelines’ for Grade I named ‘Vidya
Pravesh’ was launched on 29th July, 2021.
PARAKH Rashtriya Sarvekshan (PRS) 2024 (formerly National Achievement Survey) was
conducted by the National Assessment Centre-PARAKH, NCERT under the aegis of the
Department of School Education & Literacy, Ministry of Education to measure the baseline
performance under the National Education Policy (NEP) 2020 in development of competencies
among students at the end of the Foundational, Preparatory and Middle Stages (Grades 3, 6 and 9
respectively) of schooling.
At the foundational level (assessed in Grade 3), the scores for Language and Mathematics
from PARAKH Rashtriya Sarvekshan (PRS) 2024 highlight significant improvement when
compared to National Achievement Survey (NAS) 2021, thereby, indicating early gains from the
NIPUN Bharat Mission launched under the flagship Samagra Shiksha scheme in 2021.National, State and District level report cards for PARAKH Rashtriya Sarvekshan 2024
providing insights on variation in learning outcomes, achievement of stage-specific competencies
and suggested interventions to improve low-performing competencies, are available at
https://dashboard.parakh.ncert.gov.in/en, a dedicated dashboard designed to disseminate the
findings of the assessment.
(c) The details of schools upgraded and additional classrooms constructed in Bulandshahr and
Siddharthnagar in Uttar Pradesh, Bengaluru in Karnataka, Nabarangpur, Shimla, Jalgaon and
Bharatpur under Samaagra Shiksha are as under:
Upgradation of Upgradation of
New School
Additional Primary Schools Upper Primary
Districts (Sr.
Classroom to Upper Primary Schools to
Secondary)
Schools (VI -VIII) Secondary Schools
Bengaluru* 1 - - -
Bharatpur - 85 11 -
Bulandshahr 1 64 - 1
Jalgaon - 1 - -
Nabarangpur 17 104 6 3
Shimla - 20 - -
Siddharthnagar 1 209 - -
*Includes Bengaluru Urban South/North and Bengaluru Rural
*Source: PRABANDH
State-wise list of New/Upgraded Schools approved during last 3 years is attached at Annexure-III.
As per UDISE+ 2022-23, 2023-24 and 2024-25, the details of Government Schools (Grade
VI and above) with ICT Labs and Smart Classrooms facilities in Bulandshahr and Siddharthnagar
Districts of Uttar Pradesh State, Bengaluru U South, Bengaluru Rural, Bengaluru U North Districts
of Karnataka State, Nabarangpur District of Odisha State, Shimla District of Himachal Pradesh,
Jalgaon District of Maharashtra State and Bharatpur District of Rajasthan is as under: -
Schools with ICT Lab Schools with Smart Classroom
Name of the State District
2022-23 2023-24 2024-25 2022-23 2023-24 2024-25
Bulandshahr 34 20 10 619 375 253
Uttar Pradesh
Siddharthnagar 43 36 30 342 230 202
Bengaluru U
101 103 105 304 273 211
South
Karnataka Bengaluru Rural 65 63 73 211 193 152
Bengaluru U
66 63 64 194 158 109
North
Odisha Nabrangpur 173 193 173 481 241 175
Himachal
Shimla 355 371 319 389 363 284
PradeshSchools with ICT Lab Schools with Smart Classroom
Name of the State District
2022-23 2023-24 2024-25 2022-23 2023-24 2024-25
Maharashtra Jalgaon 42 52 40 410 392 360
Rajasthan Bharathpur 130 132 257 239 193 116
Source: UDISE
State-wise number of ICT Labs established and Smart Classroom developed in schools since
inception is attached at Annexure-IV.
Amongst the said districts 2 residential schools/Hostels in the district of Shimla have been
approved under Netaji Subhas Residential School doing 2025-26.
Under Kasturba Gandhi Balika Vidyalaya (KGBVs), which are residential schools from
class VI to XII for girls belonging to Socio-Economically Disadvantaged Groups (SEDGs) such as
SC, ST, OBC and others; 2 KGBVs in Bharatpur District, 11 in Bulandshahr and 7 in
Siddharthnagar have been upgraded in last 3 years amongst the said districts.
In convergence with Ministry of Tribal Affairs, Government of India, under Dharti Aaba
Janjatiya Gram Utkarsh Abhiyan (DAJGUA) Program 9 hostels of 100 capacity each has been
sanctioned to Nabrangpur Lok Sabha Constituency which comprises 3 districts: Nabrangpur (4),
Malkangiri (3) and Koraput (2), with total NR cost of Rs. 3433.05 Lakh. In Malkangiri District- 16
hostels of total 1300 capacity (100 bedded) have been sanctioned under another scheme of MoTA
named Pradhan Mantri Janjati Adivasi Nyaya Maha Abhiyan (PM JANMAN) with the total NR
cost Rs. 4130 Lakhs.
State-wise number of Hostels approved under PM JANMAN is attached at Annexure-V and
Hostls approved under DAJGUA programs during last 3 years (2023-24 to 2025-26) are attached at
Annexure-V(A).
(d) & (e): Under Samagra Shiksha preference is given under the scheme to Educationally Backward
Blocks (EBBs), LWEs, Border areas and aspirational districts, etc. Accordingly, different
interventions are approved on a priority basis in these districts to improve access and quality of
education. Annual work Plan and Budget (AWP&B) is prepared by the State/UT based on their
requirements and priorities at the beginning of every year. The proposal of State/UT having various
activities/components are appraised and approved by Project Approval Board (PAB) in consultation
with the State as per the programmatic & financial norms of the scheme.
Release of Central share of funds is done in instalments depending on the financial progress
of utilization of funds released earlier, incentivising the State/UTs to utilize more funds.
The cost of construction works in Hilly and Remote region is comparatively higher due to
difficult terrain, limited availability of construction materials, higher transportation cost, and
logistical challenges. As per Samagra Shiksha norms, while calculating unit cost of activities the
rates are taken as per specified standards and State Schedule of Rates (SSOR) or CPWD Rates,
whichever is lower, thus incorporating the variation of cost.Support is also provided under Samagra Shiksha for reaching out to children in sparsely
populated, or hilly and remote regions, including densely forested areas with difficult geographical
terrain and border areas, through the following specific provisions:
• Favourable Funding Pattern: While the standard Centre-State funding ratio is 60:40, it is
relaxed to 90:10 for the 8 North-Eastern States and 3 Himalayan States (Himachal Pradesh,
Uttarakhand, and Jammu & Kashmir), ensuring the central government bears the bulk of the
financial burden.
• Residential schools/Hostel: In areas where building a school is unviable due to sparse
population or extreme terrain, the scheme provides for Netaji Subhash Chandra Bose
Avasiya Vidyalayas i.e., Residential Schools/Hostels. In addition, expanded hostel facilities
for tribal students are provided under the umbrella of the Samagra Shiksha under the PM
JANMAN and DAJGUA scheme.
• Transport and Escort Facility: For children in remote habitations, the scheme provides a
transport allowance of up to ₹6,000 per child per annum up to grade 10 to ensure they can
reach schools safely.
• Residential Quarters for Teachers: To ensure teacher retention in remote and difficult
areas, the scheme provides financial support for the construction of staff quarters.
***ANNEXURE-I
ANNEXURE REFERRED TO IN REPLY TO PART (a) & (b) OF LOK SABHA STARRED
QUESTION NO. 225 ANSWERED ON 9TH MARCH, 2026 ASKED BY HON’BLE MPs
SHRI ALOK SHARMA AND SHRI BALABHADRA MAJHI REGARDING
INFRASTRUCTURE DEVELOPMENT UNDER SAMAGRA SHIKSHA ABHIYAN
Basic Infrastructure Facilities approved during the last three years
Labs
Drinki
Additional Boys Girls Major (Phy,
S.NO State/UT ng Ramps Electricity Library
Classrooms Toilets Toilets Repair Ch,
water
Bio, Sci)
1 A & N Islands 0 0 0 0 0 0 1 0 8
2 Andhra Pradesh 216 173 0 0 298 81 115 389 557
3 Arunachal 0 226 233 273 0 0 34 173 109
Pradesh
4 Assam 12 3192 1221 856 1016 0 0 1186 2051
5 Bihar 1854 6615 6022 7041 213 191 12 0 14593
6 Chandigarh 0 0 0 0 0 0 0 0 0
7 Chhattisgarh 70 1148 568 414 43 0 60 494 76
8 DND & DNH 0 0 0 0 0 0 0 68 0
9 Delhi 0 9 0 0 0 0 0 0 0
10 Goa 0 0 0 0 4 0 0 0 0
11 Gujarat 0 732 252 217 0 0 3 292 4
12 Haryana 0 1695 0 0 0 0 168 0 986
13 Himachal 1 189 74 50 6 67 235 354 268
Pradesh
14 Jammu & 45 2824 1094 1135 65 13 147 610 391
Kashmir
15 Jharkhand 262 965 398 249 0 0 1 1229 866
16 Karnataka 67 0 245 73 0 200 0 399 347
17 Kerala 69 0 422 496 150 69 0 110 61
18 Ladakh 59 125 89 90 32 96 10 114 4
19 Lakshadweep 0 0 0 0 0 0 0 0 0
20 Madhya 153 976 490 506 21 5060 168 1590 1215
Pradesh
21 Maharashtra 0 99 1061 716 0 0 45 482 535
22 Manipur 111 186 230 228 0 0 32 167 88
23 Meghalaya 410 18 102 143 389 100 0 66 0
24 Mizoram 30 15 12 11 223 92 3 20 20
25 Nagaland 0 24 16 18 0 10 0 59 65
26 Odisha 237 1360 2172 1360 799 1673 0 1 344
27 Puducherry 0 4 0 0 0 0 0 0 0
28 Punjab 0 1960 1797 1969 0 0 167 704 317
29 Rajasthan 495 1242 68 349 0 0 872 40 3430
30 Sikkim 5 4 141 133 116 5 0 71 11
31 Tamil Nādu 0 107 0 549 274 0 0 1003 0
32 Telangana 0 209 0 0 0 0 0 0 598
33 Tripura 0 301 186 285 578 50 33 202 113
34 Uttarakhand 0 338 242 273 0 48 38 506 357
35 Uttar Pradesh 332 5412 48 51 34 0 9 1688 8
36 West Bengal 0 812 99 0 0 0 0 1341 4300
Total 4428 30960 17282 17485 4261 7755 2153 13358 31722
Source:PRABANDHANNEXURE-I(A)
ANNEXURE REFERRED TO IN REPLY TO PART (a) to (b) OF LOK SABHA STARRED
QUESTION NO. 225 ANSWERED ON 9TH MARCH, 2026 ASKED BY HON’BLE MPs
SHRI ALOK SHARMA AND SHRI BALABHADRA MAJHI REGARDING
INFRASTRUCTURE DEVELOPMENT UNDER SAMAGRA SHIKSHA ABHIYAN
Basic infrastructure facilities approved for Bulandshahr and Siddharthnagar in Uttar Pradesh,
Bengaluru in Karnataka, Nabarangpur, Shimla, Jalgaon and Bharatpur Lok Sabha Constituencies
New
Scho Labs
Additio Boy Girl CWS
ol Drinki (Physic,
nal s s N Electrificat Library Major
Districts (Sr. ng Che,
Classro Toil Toil Ram ion room Repairs
Seco Water Bio,
om et et ps
ndar Sci.)
y)
Bengaluru 1 - - - - - - - - 14
Bharatpur - 9 85 3 10 - - 35 - 71
Bulandshahr 1 12 64 - 1 - - - 8 -
Jalgaon - - 1 18 21 - - - 3 7
Nabarangpur 17 - 104 50 37 21 142 - - 15
Shimla - - 20 14 7 - 23 33 53 16
Siddharthnagar 1 4 209 1 1 - - - 85 -
Source: PRABANDHANNEXURE-II
ANNEXURE REFERRED TO IN REPLY TO PART (a) & (b) OF LOK SABHA STARRED
QUESTION NO. 225 ANSWERED ON 9TH MARCH, 2026 ASKED BY HON’BLE MPs
SHRI ALOK SHARMA AND SHRI BALABHADRA MAJHI REGARDING
INFRASTRUCTURE DEVELOPMENT UNDER SAMAGRA SHIKSHA ABHIYAN
Financial approvals made under the in-service teacher training component of the Quality and
Innovation intervention during the last three years
(₹) In Lakh
Approved
S.No. State/UT
2023-24* 2024-25 2025-26
1. Andaman & Nicobar Islands 24.05 40.80 57.48
2. Andhra Pradesh 1887.31 3821.68 2129.43
3. Arunachal Pradesh 447.55 218.38 182.80
4. Assam 1975.97 2734.32 1905.27
5. Bihar 6979.40 10793.37 20982.30
6. Chandigarh 96.96 45.83 53.18
7. Chhattisgarh 1468.86 1446.02 1271.51
8. Dadra & Nagar Haveli and
119.18 100.03 110.85
Daman & Diu
9. Delhi 697.83 1080.95 1281.02
10. Goa 50.38 76.08 21.18
11. Gujarat 777.22 0.00 7082.47
12. Haryana 427.48 926.24 738.29
13. Himachal Pradesh 134.89 399.55 327.71
14. Jammu & Kashmir 1650.49 1734.15 1501.45
15. Jharkhand 331.38 861.97 487.80
16. Karnataka 1986.93 4423.59 5828.84
17. Kerala 0.00 0.00 0.00
18. Ladakh 59.48 28.81 27.06
19. Lakshadweep 1.58 3.70 5.30
20. Madhya Pradesh 7829.74 5515.39 2830.89
21. Maharashtra 3014.80 3200.64 1661.18
22. Manipur 356.65 460.48 90.25
23. Meghalaya 0.00 114.06 136.42
24. Mizoram 28.61 0.00 47.75
25. Nagaland 317.37 5.98 13.41
26. Odisha 0.00 0.00 18.84
27. Puducherry 8.10 227.30 80.33
28. Punjab 946.85 541.81 319.12
29. Rajasthan 775.87 1803.89 1854.75
30. Sikkim 84.54 9.13 0.68
31. Tamil Nadu 856.25 11350.15 11910.80
32. Telangana 575.76 1949.61 1925.70
33. Tripura 414.03 425.78 467.35
34. Uttarakhand 386.98 144.83 421.38
35. Uttar Pradesh 5701.58 7491.53 5333.62
36. West Bengal 649.06 1967.50 1349.90
Total 41063.11 63943.50 72456.26
Source: PRABANDHANNEXURE-III
ANNEXURE REFERRED TO IN REPLY TO PART (c) OF LOK SABHA STARRED
QUESTION NO. 225 ANSWERED ON 9TH MARCH, 2026 ASKED BY HON’BLE MPs SHRI
ALOK SHARMA AND SHRI BALABHADRA MAJHI REGARDING INFRASTRUCTURE
DEVELOPMENT UNDER SAMAGRA SHIKSHA ABHIYAN
New /Upgraded Schools Approved State-Wise from 2023-24 to 2025-26
Sl No State 2023-2024 2024-2025 2025-2026 Grand Total
1 Andaman & Nicobar Islands 0 0 0 0
2 Andhra Pradesh 2 0 0 2
3 Arunachal Pradesh 4 0 0 4
4 Assam 1 5 2 6 28 69
5 Bihar 0 0 0 0
6 Chandigarh 0 0 0 0
7 Chhattisgarh 1 4 0 0 14
8 Dadra & Nagar Haveli 0 6 0 6
9 Gujarat 1 0 1 7 11 38
10 Haryana 0 0 0 0
11 Himachal Pradesh 0 0 0 0
12 Jammu & Kashmir 1 0 2 3
13 Jharkhand 0 0 0 0
14 Karnataka 1 4 1 4 21 49
15 Kerala 0 0 0 0
16 Ladakh 1 3 2 6
17 Madhya Pradesh 2 4 0 42 66
18 Maharashtra 0 2 0 2
19 Manipur 1 3 6 0 19
20 Meghalaya 1 9 0 0 19
21 Mizoram 1 4 0 0 14
22 Nagaland 0 0 0 0
23 Odisha 1 0 8 0 206 314
24 Punjab 3 2 1 5 0 47
25 Rajasthan 7 8 1 3 0 91
26 Sikkim 2 1 0 3
27 Tamil Nadu 0 0 0 0
28 Tripura 9 3 4 16
29 Uttar Pradesh 2 9 6 3 69 161
30 Uttarakhand 1 3 1 5
31 West Bengal 0 0 0 0
Grand Total 390 172 386 948
*Source: PRABANDHANNEXURE-IV
ANNEXURE REFERRED TO IN REPLY TO PART (c) OF LOK SABHA STARRED
QUESTION NO. 225 ANSWERED ON 9TH MARCH, 2026 ASKED BY HON’BLE MPs
SHRI ALOK SHARMA AND SHRI BALABHADRA MAJHI REGARDING
INFRASTRUCTURE DEVELOPMENT UNDER SAMAGRA SHIKSHA ABHIYAN
State-wise list of ICT Labs established and Smart Classroom developed in schools since inception
ICT Smart Classroom
(From 2005-06 to till date) (2020-21 to till date)
States/UTs Name
Approval Functional Approval Functional
Andaman and Nicobar Islands 162 147 49 0
Andhra Pradesh 9671 9040 6840 4691
Arunachal Pradesh 794 480 345 141
Assam 8400 7536 7146 6023
Bihar 4942 3410 11586 3422
Chandigarh 155 139 186 186
Chhattisgarh 6965 2341 10771 5857
DND - DNH 153 141 192 137
Delhi 2208 1181 5696 1018
Goa 463 460 87 24
Gujarat 6179 5851 7155 7293
Haryana 5446 3553 3556 3226
Himachal Pradesh 3893 2558 2858 2262
Jammu and Kashmir 4341 3036 4428 1352
Jharkhand 5447 4966 2459 1244
Karnataka 9536 3468 4099 437
Kerala 2489 2409 752 373
Ladakh 200 172 165 123
Lakshadweep 28 11 0 0
Madhya Pradesh 8489 4037 12573 5758
Maharashtra 11387 10134 6006 2257
Manipur 997 826 565 544
Meghalaya 545 464 25 25
Mizoram 1166 724 244 229
Nagaland 811 649 712 703
Odisha 10084 8315 11776 6973
Puducherry 258 188 152 145
Punjab 8965 3971 3938 3568
Rajasthan 13408 8807 16891 7612
Sikkim 385 381 301 301
Tamil Nadu 16595 13351 9832 865
Telangana 7419 5292 6248 3982
Tripura 1782 1456 1162 889
Uttar Pradesh 20098 9613 34533 26925
Uttarakhand 1108 856 2829 1537
West Bengal 4184 2788 581 0
Total 179153 122751 176738 100122ANNEXURE-V
ANNEXURE REFERRED TO IN REPLY TO PART (c) OF LOK SABHA STARRED
QUESTION NO. 225 ANSWERED ON 9TH MARCH, 2026 ASKED BY HON’BLE MPs
SHRI ALOK SHARMA AND SHRI BALABHADRA MAJHI REGARDING
INFRASTRUCTURE DEVELOPMENT UNDER SAMAGRA SHIKSHA ABHIYAN
Total Hostels approved under PM JANMAN
STATE / UTs Total Hostel Sanctioned
Andhra Pradesh 87
Bihar 15
Chhattisgarh 40
Gujarat 13
Jharkhand 39
Karnataka 7
Kerala 4
Madhya Pradesh 106
Maharashtra 25
Manipur 6
Odisha 76
Rajasthan 21
Tamil Nadu 8
Telangana 16
Tripura 32
Uttrakhand 3
Uttar Pradesh 2
Total 500
*Source: PRABANDHANNEXURE-V(A)
ANNEXURE REFERRED TO IN REPLY TO PART (c) OF LOK SABHA STARRED
QUESTION NO. 225 ANSWERED ON 9TH MARCH, 2026 ASKED BY HON’BLE MPs
SHRI ALOK SHARMA AND SHRI BALABHADRA MAJHI REGARDING
INFRASTRUCTURE DEVELOPMENT UNDER SAMAGRA SHIKSHA ABHIYAN
Total Hostels approved under DAJGUA
S.NO STATE/UTs HOSTELS SANCTIONED
1 Madhya Pradesh 104
2 Arunachal Pradesh 45
3 Jharkhand 5
4 Telangana 10
5 Tripura 15
6 Sikkim 5
7 Rajasthan 58
8 Bihar 19
9 Maharashtra 22
10 Andhra Pradesh 4
11 Karnataka 14
12 Nagaland 23
13 Odisha 40
14 Manipur 44
15 Assam 209
16 Gujarat 9
17 Uttar Pradesh 3
18 Uttarakhand 3
19 Ladakh 1
20 Mizoram 13
21 Himachal Pradesh 2
22 Chhattisgarh 42
23 Kerala 2
TOTAL 692
*Source: PRABANDH
***