See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
STARRED QUESTION NO. 477
TO BE ANSWERED ON 25.03.2026
INITIATIVES UNDER PM GATI SHAKTI TO STRENGTHEN RAILWAY
NETWORK
*477. DR. LATA WANKHEDE:
SMT. SHAMBHAVI:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Government has approved new railway infrastructure
projects to enhance capacity, connectivity and operational efficiency
particularly in Sagar of Madhya Pradesh; Samastipur, Jamui and
Khagaria of Bihar and Rajahmundry of Andhra Pradesh Lok Sabha
Constituencies, if so, the details thereof and if not, the reasons
therefor;
(b) whether these projects include track doubling, multi-tracking or other
measures to reduce congestion and improve mobility particularly in
Madhya Pradesh, Bihar, Andhra Pradesh, if so, the details thereof and if
not, the reasons therefor;
(c) whether such initiatives are being implemented under national
infrastructure programmes such as PM Gati Shakti to strengthen
integrated transport networks, if so, the details thereof and if not, the
reasons therefor;
(d) whether the Government has assessed the expected benefits of these
projects in terms of freight efficiency, passenger convenience and
regional economic development, if so, the details thereof and if not, the
reasons therefor; and
(e) the manner in which these projects are expected to strengthen railway
infrastructure, logistics efficiency and overall economic growth in the
country?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (e): A Statement is laid on the Table of the House.
*****
§STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (e) OF STARRED
QUESTION NO.477 TO BE ANSWERED ON 25.03.2026 IN LOK SABHA
(a) to (e): Capacity enhancement of railway network has been taken up by
Indian Railways in a big way during last 11 years. The details of
commissioning/laying of new track across Indian Railways is given below:-
New track
Period Average commissioning of new tracks
Commissioned
2009-14 7,599 Km 4.2 Km/day
2014-25 34,428 Km 8.6 Km/day (more than 2 times)
Projects Sanctioned:
As on 01.04.2025, across Indian Railways, 431 Railway infrastructure
projects including port-connectivity (154 New Line, 33 Gauge Conversion
and 244 Doubling) of total length 35,966 Km, costing approx. 6.75 lakh
crore are sanctioned. The summary is as under:-
Total Length
Total Exp upto
No of Length Commissioned
Category Mar'25
Projects NL/GC/DL till Mar'25
( in Cr)
(km) (Km)
New Lines 154 16,142 3,036 1,45,318
Gauge
33 4,180 2,997 22,753
Conversion
Doubling /
244 15,644 6,736 1,22,858
Multitracking
Total 431 35,966 12,769 2,90,929
Zone-wise/year-wise details of all Railway projects are made available in
public domain on Indian Railway’s website.
Page 1 of 21The status of projects sanctioned in Madhya Pradesh, Bihar and Andhra
Pradesh are as under:
Madhya Pradesh
Railway Budget:
Budget allocation in the recent years has increased significantly. Budget
allocation for Infrastructure projects and safety works, falling fully/partly in
the State of Madhya Pradesh is as under:
Period Outlay
2009-14 ₹632 crore/year
2025-26 ₹14,745 crore (More than 23 times)
Track construction:
The details of commissioning/laying of new track falling fully/partly in the
State of Madhya Pradesh during 2009-14 and 2014-25 is as under:
New Track Average Commissioning of new
Period
Commissioned tracks
2009-14 145 Km 29 Km/year
2014-25 2651 Km 241 Km/year (More than 8 times)
Projects sanctioned:
As on 01.04.2025, 24 Railway projects (08 New Lines, 02 Gauge Conversion
and 14 Doubling), of total length of 4,740 Km costing ₹89,542 crore falling
fully/partly in the State of Madhya Pradesh are sanctioned. The summary is
as under:
Page 2 of 21Category No. of Total Length Total Exp upto
projects Length Commissioned Mar'25
(in Km) (in Km) (₹ in Cr)
New Lines 8 1914 544 15,069
Gauge
2 809 430 6,766
Conversion
Doubling /
14 2017 1118 19,566
Multitracking
Total 24 4,740 2,093 41,401
Status of major projects falling in Sagar Lok Sabha constituencies of
Madhya Pradesh is as under:
Name of Total Length Commissioned Status of balance
Project Length (in Km) length
(in Km) (in Km)
Katni-Bina 3rd 263 Project -
line commissioned.
Jhansi-Bina 3rd 153 133 Km 20 Km balance.
line commissioned. Works taken up in
Sections balance sections
commissioned: Jakhlaun – Dhaura
Jhansi – Jakhlaun (12 Km) and Agasod –
(107 km) Bina (8 Km)
Dhaura – Agasod (26
Km)
Itarsi-Bina 4th 237 - Recently sanctioned.
line (237 Km)
Zonal Railway wise details of Railway projects are made available in public
domain on Indian Railway’s website.
Details of some of the recently completed projects falling fully/partly in the
State of Madhya Pradesh are as under:
S.No. Name of Project Cost
(₹ in
Crores)
1. Anuppur-Katni 3rd line (165 Km) 2,311
2. Pendra Road-Anuppur 3rd line (50 Km) 394
Page 3 of 21S.No. Name of Project Cost
(₹ in
Crores)
3. Khodri-Anuppur Doubling with flyover at Bilaspur (72 792
Km)
4. Bhopal-Bina 3rd line (145 km) 1,075
5. Bina-Kota Doubling (283 km) 2,477
6. Jabalpur-Gondia Gauge Conversion including 2,005
Balaghat-Katangi (300 Km)
7. Chhindwara-Nagpur Gauge Conversion (150 Km) 1,512
8. Chhindwara-Mandla Fort Gauge Conversion (182 Km) 1,268
9. Ghat Pindari-Balkheda Doubling (6 Km) 29
10. Guna-Ruthiyai Doubling (20 Km) 175
11. Jukhei Chord line, Bye Passing the Katni Yard (2 Km) 12
12. Sontalai-Bagratawa Doubling (7 Km) 110
13. Itarsi-Budhni 3rd line (25 Km) 286
14. Teegaon-Chichonda Ghat Section 3rd line (17 Km) 176
15. Barkhera-Bhopal 3rd line (41 km) 473
16. Nagda-Ujjain Doubling of Gambhir Bridge (2 Km) 28
17. Nimach-Chittaurgarh Doubling (56 Km) 560
18. Budhni-Barkhera 3rd line (27 Km) 1,703
19. Indore-Dewas-Ujjain Doubling (79 Km) 757
20. Powerkheda-Jujharpur Rail flyover (16 Km) 443
21. Guna- Etawah New Line (348 Km) 683
22. Ramna-Singrauli doubling (160 Km) 2,436
23. Karaila Road- ShaktinagarDoubling(32 Km) 763
24. Malkhedi-Mahadeokhedi Doubling (12 Km) 59
Some of the projects falling fully/partly in the State of Madhya Pradesh
which have been taken up are as under:
S. Project Cost
No (₹ in Crores)
1. Shahdol-Singhpur 4th Line (6 Km) 54
2. Katni- Grade separator / Bypass (35 Km) 2,300
3. Katni- Singrauli Doubling (257 Km) 4,377
4. Lalitpur-Satna, Rewa-Singrauli & Mahoba-
8,914
Khajuraho New Line (541 Km)
5. Ramganjmandi-Bhopal New Line (277 Km) 5,073
Page 4 of 21S. Project Cost
No (₹ in Crores)
6. Indore-Budni New Line (198 Km) 7,474
7. Nimach-Badi Sadri New Line (48 Km) 495
8. Gwalior-Sheopurkalan Gauge Conversion with
2,913
extension to Kota (284 Km)
9. Itarsi- Nagpur 3rd line (280 Km) 2,450
10. Jhansi-Bina 3rd line (153 Km) 2,002
11. Mathura-Jhansi 3rd line (274 Km) 5,924
12. Jhansi-Kairar-Manikpur & Khirar-Bhimsen Doubling 4,330
(431 Km)
13. Satna-Rewa Doubling (50 Km) 590
14. Ruthiyai Bye Pass line (3 Km) 54
15. Guna Bye Pass line (2 Km) 179
16. Ujjain Fly Over (2 Km) 100
17. Manmad - Indore New Line (360 Km) 18,529
18. Bhusawal-Khandwa 3rd & 4th Line (131 Km) 3,285
19. Dahod-Indore New Line (205 Km) 9,746
20. Nimach-Ratlam Doubling (133 Km) 1,096
21. Chhota Udepur-Dhar New Line (147 Km) 1,794
22. Ratlam-Nagda 3rd and 4th line (41 Km) 964
23. Vadodara-Ratlam 3rd and 4th line (259 Km) 8,387
24. Ratlam-Khandwa Gauge Conversion (299 Km) 7,265
25. Bina-Itarsi 4th Line (237 km) 4,329
26. Itarsi-Nagpur 4th Line (297 Km) 5,010
Bihar
Railway Budget:
Budget allocation for Infrastructure projects and safety works, falling
fully/partly in the State of Bihar is as under:
Period Outlay
2009-14 ₹1,132 Cr./year
2025-26 ₹10,066 Cr. (Nearly 9 times)
Page 5 of 21Track construction:
The details of commissioning/laying of new track falling fully/partly in the
State of Bihar during 2009-14 and 2014-25 is as under:-
New Track Average Commissioning of new
Period
Commissioned tracks
2009-14 318 Km 63.6 Km/yr
2014-25 1,899 Km 172.6 Km/yr(More than 2.5 times)
Projects sanctioned:
As on 01.04.2025, 52 projects (31 New Lines, 01 Gauge Conversions and 20
Doubling), of a total length of 4,663 km, costing ₹86,107 crore, falling
fully/partly in Bihar, are sanctioned. The summary is as under:-
Length Total Exp
No of Total Length
Commissioned upto
Category sanctioned NL/GC/DL
till Mar'25 Mar'25
Projects (in Km)
(in Km) (₹ in Cr)
New Lines 31 2,691 516 16,814
Gauge
1 69 52 544
Conversion
Doubling/Multi-
20 1,904 446 11,995
tracking
Total 52 4,663 1,014 29,353
Status of major projects falling in Khagaria, Jamui and Samastipur Lok
Sabha constituencies of Bihar is as under:
Name of Total Length Commissioned (in Status of balance
Project Length Km) length
(in Km) (in Km)
Sakri- 84 54 Km commissioned. 30 Km balance.
Hasanpur Sections Commissioned: Works taken up in
new line Sakri-Harnagar (44 Km) balance section
Bithan - HasanpurRoad Harnagar - Bithan (30
(10 Km)
Km)
Doubling of 38 26 Km commissioned. 12 Km balance.
Samastipur Sections Commissioned: Works taken up in
Darbhanga Samastipur – balance section
Page 6 of 21Name of Total Length Commissioned (in Status of balance
Project Length Km) length
(in Km) (in Km)
Rambhadrapur (16 Km) Rambhadrapur –
Thalwara – Darbhanga Thalwara (12 Km)
(10 Km)
Khagaria- 41 19 Km commissioned. 22 Km balance.
Kushwesh Section Commissioned: Works taken up in
warsthan Khagaria – Alauli (19 balance section
new line Km) Alauli –
Kushweshwarstha
n (22 Km)
Jhajha – 20 - Works taken up
Batia new
line
Zonal Railway wise details of Railway projects are made available in public
domain on Indian Railway’s website.
Details of some of the recently completed projects falling fully/partly in the
State of Bihar are as under:
S.No. Project Cost
(₹ in Crore)
1 Munger Bridge (19 km) 2,774
2 Kosi Bridge (22 Km) 516
3 Patna Bridge (40 Km) 3,555
4 Hajipur-Bachwara Doubling (72 km) 930
5 Kiul-Gaya Doubling (123 km) 1,200
6 KarotaPatner-Mankatha - Surface triangle (8 km) 129
7 Rampurhat-Mandarhill New Line and Rampurhat- 1,500
Murarai- 3rd line (160 km)
8 Jaynagar-Darbhanga-Narkatiaganj and Narkatiaganj- 1,193
Bhikhna Tori Gauge Conversion (295 Km)
Page 7 of 21S.No. Project Cost
(₹ in Crore)
9 Sakri-Laukaha Bazar-Nirmali & Saharsa-Forbesganj 2,113
Gauge Conversion (206 Km)
10 Bakhtiyarpur Flyover (4 Km) 402
11 Katareah-Kursela Patch Doubling incl. bridge on river 222
Kosi (7 km)
12 Araria-Galgalia New Line (111 Km) 4, 415
Some of the projects falling fully/partly in the State of Bihar which have
been taken up are as under:
S.No. Project Cost
(₹ in Crore)
1 Sitamarhi-Sheohar New Line (28 Km) 567
2 Sakri-Hasanpur New Line (76 Km) 735
3 Khagaria-Kusheshwarsthan New Line (42 Km) 1,511
4 Neora-Daniawan–Biharsharif-Barbigha-Shekhpura 2,200
New Line (166 Km)
5 Koderma-Tilaiya New Line (65 Km) 1,626
6 Hajipur-Sagauli New Line (151 Km) 2,087
7 Araria-Supaul New Line (96 Km) 1,605
8 Vikramshila-Katareah New Line with Bridge over 2,090
RiverGanga(26 Km)
9 Pirpainti-Jasidih New Line (97 Km) excluding 2,140
Hansdiha-Godda New Line (30 Km)
10 Sonnagar – Patratu multitracking (291 Km) 5,148
11 Samastipur – Darbhanga Doubling (38 Km) 624
12 Rampur Dumra - Tal-Rajendra Pul-Additional bridge 1,677
and doubling (14 Km)
Page 8 of 21S.No. Project Cost
(₹ in Crore)
13 Sagauli-Valmiknagar Doubling (110 Km) 1,280
14 Muzaffarpur-Sagauli Doubling (101 Km) 1,465
15 Barauni- Bachwara 3rd & 4th line (32 Km) 124
16 Son Nagar – Andal Multi tracking (749 Km) 12,334
17 Bakhtiyarpur-Rajgir-Tilaiya doubling (104 Km) 2,192
18 Bakthiyarpur-Fatuha 3rd and 4th line (24 Km) 931
Andhra Pradesh
Railway Budget:
Budget allocation in the recent years has increased significantly. Budget
allocation for infrastructure projects and safety works, falling fully/partly in
the State of Andhra Pradesh is as under:
Period Outlay
2009-2014 ₹ 886 Cr./year (including Telangana)
2025-2026 ₹ 9,417 Cr. (more than 10 times)
Track construction:
The details of commissioning/laying of new track falling fully/partly in the
State of Andhra Pradesh during 2009-14 and 2014-25 is as under:
New Track
Period Average Commissioning of new tracks
Commissioned
2009-14 363 Km 72.6 Km per year
2014-25 1,582 Km 143.8 Km per year (Nearly 2 times)
Projects sanctioned:
Page 9 of 21As on 01.04.2025, 39 projects (12 New Line and 27 Doubling), covering a
total length of 4,499 Km length, costing ₹70,232 crore, falling fully/partly in
the State of Andhra Pradesh, have been sanctioned, out of which 1,178 Km
length has been commissioned and an expenditure of ₹28,039 crore has
been incurred upto March 2025. The status of the work is summarized as:
No. of Total Length Total Exp.
Category projects Length Commissioned till upto March,
(Km) March, 2025 2025
(in Km) (₹ in Cr.)
New Line 12 1595 199 6,413
Multi- 27 2904 979 21,626
tracking/Doubling
Total 39 4,499 1,178 28,039
Rajahmundry constituency is already well connected, being situated on the
Kolkata–Chennai main line. Further, to improve mobility in the region, Rail
over Road line near Nidadavolu Junction Doubling (10 km) work has been
taken up.
Zonal Railway wise details of Railway projects are made available in public
domain on Indian Railway’s website.
Details of some of the recently completed projects falling fully/partly in the
State of Andhra Pradesh are as under:
S.No. Name of Project Cost
( in Crores)
1 Vijayawada–Gudivada–Bhimavaram-Narsapur, 4,688
Gudivada-Machlipatnam & Bhimavaram-Nidadavolu
doubling (221 Km)
2 Guntur-Tenali doubling (24 Km) 205
3 Nandyal-Yerraguntla new line (126 Km) 1,050
Jaggayyapeta-Mellacheruvu-Janpahad new line
4 737
(48 Km)
Page 10 of 21S.No. Name of Project Cost
( in Crores)
Obulavaripalle-Krishnapattnam new line
5 2,300
(113 Km)
6 Vizianagaram-Kottavalsa 3rd line (35 Km) 285
7 Raichur-Guntakal doubling (81 Km) 388
8 Guntakal-Kalluru doubling (41 Km) 410
9 Yelahanka-Penukonda doubling (123 Km) 1,104
10 Gooty-Dharmavaram doubling (90 Km) 1,800
Some of the projects falling fully/partly in the State of Andhra Pradesh
which have been taken up are as under:
S.N Name of Project Cost
( in Crores)
1 Kotipalli-Narsapur new line (57 Km) 2,120
2 Nadikude-Srikalahasti new line (309 Km) 3,122
3 Rayadurg-Kalyandurg-Tumkur new line (207 Km) 2,496
4 Marikuppam-Kuppam new line (24 Km) 297
5 Malugur–Palasamudram new line (18 Km) 342
6 Malkangiri-Bhadrachalam-Pandurangapuram new 3,592
line (174 Km)
7 Errupalem-Amravati-Namburu new line 2,047
(57 Km)
8 Kottavalasa-Koraput doubling (189 Km) 2,500
9 Vijayawada-Gudur 3rd line (287 Km) 6,509
10 Guntakal-Guntur doubling (401 Km) 4,306
11 Pennukonda-Dharmavarm doubling (42 Km) 308
12 Gooty-Pendekallu doubling (29 Km) 352
13 Duvvada-Simhachalam North 3rd & 4th line (21 356
Km)
14 Kottavalasa-Vizianagram 4th line (35 Km) 493
15 Gudur-Renigunta 3rd line (83 Km) 877
16 Nergundi-Palasa-Vizianagaram 3rd line 4,963
(385 Km)
Page 11 of 21Station Redevelopment:
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their
implementation in phases to improve the stations. The master planning
includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement, water
booths
Provision of wider foot over bridge/air concourse commensurate with
passenger traffic
Provision of lift/escalators/ramp
Improvement /Provision of platform surface and cover over platforms
Provision of kiosks for local products through schemes like ‘One
Station One Product’
Parking areas, Multimodal integration
Amenities for Divyangjans
Better passenger information systems
Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity at each
station.
The scheme also envisages sustainable and environment friendly solutions,
provision of ballastless tracks etc. as per necessity, phasing and feasibility
and creation of city centre at the station in the long term.
Page 12 of 21So far, 1,338 stations have been identified for development under Amrit
Bharat Station Scheme. Out of these, 80 stations are located in Madhya
Pradesh, 98 stations are located in Bihar and 73 stations are located in
Andhra Pradesh. Details of the stations identified for development in the
referred constituencies are as following:
Lok Sabha Number of Stations Names of Stations
Constituencies
Sagar 02 Bina, Saugor
Samastipur 01 Samastipur
Jamui 02 Jamui, Simutala
Khagaria 04 Khagaria Junction,
Maheshkhunt, Mansi
Junction, Simri
Bakhtiyarpur
Rajahmundry 03 Anaparthi, Nidadavolu
Junction, Rajahmundry
The names of stations identified for development under Amrit Bharat
Station Scheme in Madhya Pradesh, Bihar and Andhra Pradesh are as
following:
No. of
State Names of Stations
Stations
Madhya 80 Akodia, Amla, Anuppur, Ashoknagar,
Balaghat, Banapura, Bargawan, Beohari,
Pradesh
Berchha, Betul, Bhind, Bhopal, Bijuri,
Bina, Biyavra Rajgarh, Chhindwara, Dabra,
Damoh, Datia, Dewas, Gadarwara,
Ganjbasoda, Ghoradongri, Guna, Gwalior,
Harda, Harpalpur, Indore Jn, Itarsi Jn,
Page 13 of 21Jabalpur, Junnor Deo, Kareli, Katni Jn,
KatniMurwara, Katni South, Khachrod,
Khajuraho Jn, Khandwa, Khirkiya, Laxmi
Bai Nagar, Maihar, Maksi Jn, Mandla Fort,
Mandsor, MCS Chhatarpur, Meghnagar,
Morena, Multai, Nagda Jn, Nainpur Jn,
Narmadapuram, Narsinghpur, Nepanagar,
Nimuch, Orchha, Pandhurna, Pipariya,
Ratlam, Rewa, Ruthiyai, Sanchi, Sant
Hirdaram Nagar, Satna, Saugor, Sehore,
Seoni, Shahdol, Shajapur, Shamgarh,
Sheopur Kalan, Shivpuri, Shridham,
Shujalpur, Sihora Road, Singrauli,
Tikamgarh, Ujjain, Umaria, Vidisha,
Vikramgarh Alot
Bihar 98 Anugraha Narayan Road, Ara, Arariya
Court, Bakhtiyarpur, Banka, Banmankhi,
Bapudham Motihari, Barahiya, Barauni,
Barh, Barsoi Jn, Begusarai, Bettiah,
Bhabua Road, Bhagalpur, Bhagwanpur,
Bihar Sharif, Bihiya, Bikramganj, Buxar,
Chakia, Chausa, Chhapra, Dalsingh Sarai,
Darbhanga, Dauram Madhepura, Dehri On
Sone, Dholi, Dighwara, Dumraon, Durgauti,
Ekma, Fatuha, Gaya, Ghorasahan, Guraru,
Hajipur Jn, Jamalpur Jn, Jamui, Janakpur
Road, Jaynagar, Jehanabad, Jhanjharpur,
Kahalgaon, Karhagola Road, Katihar Jn,
Khagaria Jn, Kishanganj, Kudra, Labha,
Laheria Sarai, Lakhminia, Luckeesarai Jn,
Madhubani, Maheshkhunt, Mairwa, Mansi
Jn, Masrakh, Mokama, Motipur, Munger
(Monghyr), Muzaffarpur Jn, Nabinagar
Road, Narkatiaganj Jn, Naugachia,
Nawadah, Paharpur, Patliputra, Patna Jn,
Piro, Pirpainti, Rafiganj, Raghunathpur.,
Rajendra Nagar Terminal (Patna), Rajgir,
Ram Dayalu Nagar, Raxaul, Sabaur,
Page 14 of 21Sagauli, Saharsa, Sahibpur Kamal, Sakri,
Salauna, Salmari, Samastipur, Sasaram,
Shahpur Patoree, Shivanarayanpur, Simri
Bakhtiyarpur, Simultala, Sitamarhi, Siwan,
Sonpur Jn., Sultanganj, Supaul, Taregna,
Thakurganj, Thawe
Andhra 73 Adoni, Anakapalle, Anantapur, Anaparthi,
Araku, Bapatla, Bhimavaram Town,
Pradesh
Bobbili Jn, Chipurupalli, Chirala, Chittoor,
Cuddapah, Cumbum, Dharmavaram,
Dhone, Donakonda, Duvvada, Elamanchili,
Eluru, Giddalur, Gooty, Gudivada , Gudur,
Gunadala , Guntur, Hindupur, Ichchpuram,
Kadiri, Kakinada Town Jn, Kottavalasa
Jn, Kuppam, Kurnool city, Macherla,
Machilipatnam, Madanapalle Road,
Mangalagiri, Mantralayam Road, Markapur
Road, Nadikude Jn, Nandyal Jn,
Narasapur, Narasaraopet, Naupada Jn,
Nellore, Nidadavolu Jn, Ongole, Pakala Jn,
Palasa, Parvatipuram, Piduguralla, Piler,
Rajahmundry, Rajampet, Rayanapadu,
Renigunta, Repalle, Samalkot,
Sattenapalle, Satya Sai Prashanti Nilayan,
Simhachalam, Singaraykonda, Sri
Kalahasti, Srikakulam Road, Sullurpeta,
Tadepalligudem, Tadipatri, Tenali ,
Tirupati, Tuni, Vijayawada, Vinukonda,
Vishakhapatnam, Vizianagaram Jn
Completed stations:
Development works at railway stations under Amrit Bharat Station
Scheme in Madhya Pradesh, Bihar and Andhra Pradesh have been taken
up at a good pace. Till now, 15 stations in Madhya Pradesh, 02 stations
in Bihar and 06 stations in Andhra Pradesh have been completed. The
Page 15 of 21name of stations completed in Madhya Pradesh, Bihar and Andhra
Pradesh are as following:
State No. of Name of stations
stations
Madhya 15 Beohari, Bhind, Chhindwara, Harpalpur, Junnor Deo,
Pradesh Katni South, MCS Chhatarpur, NainpurJn,
Narmadapuram, Orchha, Sanchi, Seoni, Shajapur,
Shridham, Vidisha
Bihar 02 Pirpainti, Thawe
Andhra 06 Kakinada Town Jn,Nidadavolu Jn.,Mangalagiri,
Pradesh Rayanapadu, Sullurpeta, Tuni
The activities for development at other stations have also been taken
up at good pace and progress of some of the stations is as given below:
Saugor station: The works of improvement of station building, new entry
and exit porches, platform raising and surfacing of platform no. 1,
improvement of waiting hall, new toilet block and Divyangjans facilities
have been completed. The works of circulating area, parking and 12 m
Foot Over Bridge have been taken up.
At Bina station, high level platform, platform shelter, enquiry counter,
retiring room, cloak room, waiting hall, lift, Foot Over Bridge etc.
amenities are available. The works of platform shelter, lift at platform
no. 4/5, seating arrangement and Divyangjan water booths have been
completed in recent years. Further, Bina station has been identified for
development under Amrit Bharat Station Scheme which includes works
of new station building, porch, air concourse, improvement of existing
platforms, parking, lift, escalator and Foot Over Bridge.
Page 16 of 21 Samastipur station: The works of new station building at second entry,
improvement of existing waiting hall, toilet and circulating area have
been taken up.
Khagaria Junction station: The structural work of new station building
till second floor, raising and extension of platform no. 2/3 have been
completed. The works of new entrance porch, new platform shelter,
circulating area and 12 m Foot Over Bridge have been taken up.
Maheshkhunt station: The works of erection of canopy structure in front
of station building and widening of approach road have been completed.
The works of improvement of station building, platform shelter,
circulating area, parking and boundary wall have been taken up.
Mansi Junction station: The structural work of new station building till
second floor has been completed. The works of new platform shelter,
circulating area and 12 m Foot Over Bridge have been taken up.
Simri Bakhtiyarpur station: The works of new station building, platform
shelter, circulating area and parking have been completed. The work of
12 m Foot Over Bridge has been taken up.
Development / upgradation / modernisation of stations including under
Amrit Bharat Station Scheme is generally funded under Plan Head-53
‘Customer Amenities’. The details of allocation and expenditure under Plan
Head-53 are maintained Zonal Railway-wise and not work-wise, or station-
wise or state-wise.
Page 17 of 21Madhya Pradesh is covered under the jurisdiction of seven railway zones,
namely Central Railway, East Central Railway, North Central Railway,
South Central Railway, South East Central Railway, West Central Railway
and Western Railway. For these zones, an allocation (Revised Estimate) of
₹ 5,801 crore has been made for the financial year 2025–26, out of which an
expenditure of ₹ 5,681 crore (up to February, 2026) has been incurred so
far.
Bihar is covered under the jurisdiction of four railway zones, namely
Eastern Railway, Northeast Frontier Railway, North Eastern Railway and
East Central Railway. For these zones, an allocation (Revised Estimate) of
₹ 1,828 crore has been made for the financial year 2025–26, out of which an
expenditure of ₹ 1,793 crore (up to February, 2026) has been incurred so
far.
Andhra Pradesh is covered under the jurisdiction of four railway zones,
namely East Coast Railway, Southern Railway, South Central Railway and
South Western Railway. For these zones, an allocation (Revised Estimate)
of ₹ 3,481 crore has been made for the financial year 2025–26, out of which
an expenditure of ₹ 3,393 crore (up to February, 2026) has been incurred so
far.
Road Over Bridges (ROBs)/Road Under Bridges(RUBs)
Sanctioning of works of Road over Bridge (ROB)/Road under Bridge (RUB) in
lieu of Level crossings (LCs) is a continuous and dynamic process of Indian
Railway. Such works are prioritised and taken up on the basis of its impact
on safety in train operations, mobility of trains & impact for road users and
feasibility etc.
Page 18 of 21No. of ROBs/ RUBs constructed on Indian Railways during the period 2004-
14 vis a vis 2014-26 (Upto Jan’26) is as under:
Period ROBs/ RUBs constructed
2004-14 4,148 Nos.
2014-26 (Upto Jan’26) 14,024 Nos.
As on 01.02.2026, 4,802 Nos. ROBs/ RUBs are sanctioned at cost of ₹
1,14,196 Cr on Indian Railways which are at various stages of planning and
execution. The Lok Sabha constituency-wise list of works taken up is as
under:
S.No Constituency Total ongoing works of Total cost (₹ in
ROBs & RUBs crore)
1. Khagaria 8 447
2. Samastipur 6 464
3. Sagar 16 641
4. Jamui 3 87
5. Rajahmundhry 10 602
Completion of any ROB/RUB work depends on various factors like,
fixing of approach alignment, approval of General Arrangement Drawing
(GAD), land acquisition, removal of encroachment, shifting of infringing
utilities, statutory clearances from various authorities, law and order
situation in the area of project / work sites, number of working months in a
year for particular project / work sites due to climatic conditions etc. All
these factors affect the completion time of the projects / works.
Further, Railways have taken following measures to expedite the
progress of work:
Page 19 of 21i. Joint survey with concerned State Govt./Road Owning Authority is
done before finalizing the General Arrangement Drawing (GAD) to
ensure smooth execution.
ii. Periodic meetings of Railway & State Government officials are done
to resolve various issues related to ROB/RUB works.
iii. Standardization of superstructure drawings for various combinations
of span, skewness and width of road on Railway portion has been
done to avoid delays during the design approval. This has been issued
in the form of compendium, which can be directly adopted for Road
Over Bridge across Railway lines for expeditious planning.
The launch of PM Gati Shakti National Master Plan (NMP) has brought
transformative approach in planning and execution of infrastructural
transportation projects. The NMP, spanning across the entire country has
brought in synergy between the infrastructural sectors such as railways,
shipping, roadways, telecommunications, pipelines, etc. through
collaboration amongst concerned Ministries/State
Governments/Departments, speeding up the clearances needed for the
project completion as well as planning at a faster pace.
Indian Railways has immediately imbibed the principles of Gati Shakti in its
project planning process, expediting appraisal, sanction and execution of
projects. On ground survey, route alignment, deciding alternative route to
avoid passing through forest and wildlife areas, connectivity to ports,
mines, collieries is done through PM Gati Shakti Institutional mechanism
developed by BISAG-N. This has led to enhancement in the quality of
preparation of Detailed Project Report and reduction in project cost.
Now survey of all New Line, Gauge Conversion and Doubling projects are
taken up under PM Gati Shakti Institutional mechanism developed by
Page 20 of 21BISAG-N for the development of multimodal connectivity infrastructure
to various Economic Zones with an objective to have integrated planning,
enhanced logistics efficiency, first and last mile connectivity, throughput
enhancement and remove gaps for seamless movement of people, goods/
commodities i.e. agricultural products, fertilizers, coal, iron ore, steel,
cement, limestone etc.
Railway Infrastructure projects enable socio-economic development of the
region including:
Better connectivity of the region with other parts of the country
Faster movement of goods and services
Improving logistics efficiency and reduction in transportation cost.
Enhance line capacity
Increase in direct and indirect employment opportunities for the
people of the region
Reduced operational bottlenecks
Development of tourism industry and increase in industrial activities
in the region.
Completion of Railway project/s depends on various factors which include
the following:
Land acquisition by State Government
Forest clearance
Shifting of infringing utilities
Statutory clearances from various authorities
Geological and topographical conditions of area
Law and order situation in the area of project site
Number of working months in a year for particular project site etc.
All these factors affect the completion time and cost of the project/s.
*****
Page 21 of 21