**Executive Summary**
This document addresses Lok Sabha Starred Question No. 167 concerning the installation of Kavach, the Train Collision Avoidance System (TCAS), on Indian Railways. It details the safety measures taken, the progress of Kavach implementation, and the plans for extending its coverage. The document includes safety expenditure data, accident statistics, and technological improvements until 31.01.2026.
**Key Points / Main Content**
* **Safety Performance and Expenditure:**
* There has been a steep decline in consequential train accidents.
* The number of consequential train accidents has reduced from 135 in 2014-15 to 12 (90% lesser) in 2025-26 (up to 31.01.2026).
* The Consequential Accident Index has decreased from 0.11 in 2014-15 to 0.03 (73% lesser) in 2024-25.
* Expenditure on safety-related activities has increased over the years.
* **Safety Measures Undertaken:**
* Electrical/Electronic Interlocking Systems were provided at 6,660 stations up to 31.12.2025.
* Interlocking of Level Crossing Gates was provided at 10,097 gates up to 31.12.2025.
* Complete Track Circuiting was provided at 6,665 stations up to 31.12.2025.
* All locomotives are equipped with Vigilance Control Devices (VCD).
* GPS-based Fog Safety Devices (FSD) are provided to loco pilots in fog-affected areas.
* Modern track structures are used in primary track renewals.
* Unmanned level crossings (UMLCs) on Broad Gauge (BG) routes have been eliminated by January 2019.
* The concept of Rolling Block was introduced with Gazette notification dated 30.11.2023.
* **Kavach Implementation:**
* Kavach version 4.0 was approved on 16.07.2024 and covers all major features for the railway network.
* Kavach version 4.0 has been successfully commissioned on 1297 Route Kilometres on Delhi-Mumbai and Delhi-Howrah routes.
* Trackside Kavach implementation is underway on 23,360 RKM covering GQ, GD, HDN, and identified sections.
* Progress of Key Items: Laying of Optical Fibre Cable (8570 Km), Installation of Telecom Towers (938 Nos), Station Data Centre (767 Stations), Installation of Track side equipment (5672 Rkm), Provision of Kavach in Loco (4154).
* A tender has been finalised for equipping 6,300 Electric Locomotives with Kavach 4.0, and another tender is under finalization for 2,679 Diesel Locomotives.
* **Kavach Training & Costs:**
* Specialized training programs on Kavach are being conducted. About 48,000 technicians, operators and engineers have been trained.
* The cost for trackside Kavach equipment is approximately Rs. 50 Lakhs/Km and Rs. 80 Lakh/Loco for locomotives.
* Funds utilized on Kavach works up to Dec'25 is Rs. 2,573.36 Crores. The allocation of funds for 2025-26 is Rs. 1673.19 Crores.
**Impact Analysis**
**Stakeholders:**
* **Ministry of Railways**
**Impact:** To provide safety and improve train operations.
**Action Required:** The Ministry needs to continue the implementation of Kavach, monitor its progress, and allocate sufficient funds.
* **Railway Staff (Loco Pilots, Technicians, Operators, Engineers)**
**Impact:** Requires training and adoption of new technologies for safer operation.
**Action Required:** Required to undergo specialized training programmes on Kavach and adhere to updated safety protocols.
* **Passengers**
**Impact:** Increased safety and reduced risk of train accidents.
**Action Required:** Passengers are required to follow the statutory “Fire Notices” to prevent fire accidents.
Key Entities Referenced
Kavach: Indigenously developed Train Collision Avoidance System (TCAS) intended to ensure zero-collision railway operations.
Ministry of Railways: The government ministry responsible for the implementation of Kavach across the railway network.
Indian Railways: The railway system in India which is undertaking various safety measures and implementing the Kavach system.
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
STARRED QUESTION NO. 167
TO BE ANSWERED ON 11.02.2026
INSTALLATION OF KAVACH ON ALL RAILWAY ROUTES
*167. SHRI KUNDURU RAGHUVEER:
Will the Minister of RAILWAYS be pleased to state:
(a) whether Kavach, the indigenously developed Train Collision Avoidance
System (TCAS) has been installed on all trains and railway routes
across the country and if so, the details thereof and if not, the reasons
therefor;
(b) the total number of trains and route kilometers currently covered under
Kavach implementation, zone-wise;
(c) whether any major train accidents have occurred during the last two
years due to non- installation/failure of Kavach and if so, the details
thereof; and
(d) the timeline by which 100 per cent coverage of Kavach is expected and
the steps taken/being taken by the Government to ensure zero-collision
railway operations across the country?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (d): A Statement is laid on the Table of the House.
*****
§STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (d) OF STARRED
QUESTION NO.167 TO BE ANSWERED ON 11.02.2026 IN LOK SABHA
(a) to (d): Safety is accorded the highest priority on Indian Railways. As a
consequence of various safety measures taken over the years, there has
been a steep decline in the number of accidents.
Number of Consequential Train Accidents has reduced as shown in the
table below:-
Year Consequential Accidents
2014-15 135
2025-26 (upto 31.01.2026) 12 (90% lesser)
Another important index showing improvement in safety in train operations
is Consequential Accidents Index, the details of which are as under:-
Consequential Accident Index:-
Year Accident Index
2014-15 0.11
2024-25 0.03 (73% lesser)
This index measures number of consequential accidents as a ratio of total
running Kilometers of all trains.
Accident Index =
234
165
135
55
31
12
2005-06 2009-10 2014-15 2019-20 2024-25 2025-26
(upto Jan)
stnediccA
niarT
laitneuqesnoC
fo
.oN
No. of consequential accidents
No. of trains X million kilometers run-2-
The various safety measures taken to enhance safety in train operations are
as under:-
1. On Indian Railways, the expenditure on Safety related activities has
increased over the years as under:-
Expenditure/Budget on Safety related activities (Rs. in Cr.)
2013-14 2022-23 2023-24 2024-25 2025-26
39,200 87,336 1,01,662 1,14,022 1,17,693
2. Electrical/Electronic Interlocking Systems with centralized operation of
points and signals have been provided at 6,660 stations up to
31.12.2025 to reduce accidents due to human failure.
3. Interlocking of Level Crossing (LC) Gates has been provided at 10,097
Level Crossing Gates up to 31.12.2025 for enhancing safety at LC Gates.
4. Complete Track Circuiting of stations to enhance safety by verification
of track occupancy by electrical means has been provided at 6,665
stations up to 31.12.2025.
5. Detailed instructions on issues related with safety of Signalling, e.g.
mandatory correspondence check, alteration work protocol, preparation
of completion drawing, etc. have been issued.
6. System of disconnection and reconnection for S&T equipment as per
protocol has been re-emphasized.
7. All locomotives are equipped with Vigilance Control Devices (VCD) to
improve alertness of Loco Pilots.
8. Retro-reflective sigma boards are provided on the mast which is located
two OHE masts prior to the signals in electrified territories to alert the
crew about the signal ahead when visibility is low due to foggy weather.
9. A GPS based Fog Safety Device (FSD) is provided to loco pilots in fog
affected areas which enables loco pilots to know the distance of the
approaching landmarks like signals, level crossing gates, etc.
10. Modern track structure consisting of 60kg, 90 Ultimate Tensile Strength
(UTS) rails, Prestressed Concrete Sleeper (PSC) Normal/Wide base
sleepers with elastic fastening, fan shaped layout turnout on PSC
sleepers, Steel Channel/H-beam Sleepers on girder bridges is used while
carrying out primary track renewals.
11. Mechanisation of track laying activity through use of track machines
--3/--3-
like PQRS, TRT, T-28 etc. to reduce human errors.
12. Maximizing supply of 130m/260m long rail panels for increasing
progress of rail renewal and avoiding welding of joints, thereby
improving safety.
13. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws and
timely removal of defective rails.
14. Laying of longer rails, minimizing the use of Alumino Thermic Welding
and adoption of better welding technology for rails i.e., Flash Butt
Welding.
15. Monitoring of track geometry by OMS (Oscillation Monitoring System)
and TRC (Track Recording Cars).
16. Patrolling of railway tracks to look out for weld/rail fractures.
17. The use of Thick Web Switches and Weldable CMS Crossing in turnout
renewal works.
18. Inspections at regular intervals are carried out to monitor and educate
staff for observance of safe practices.
19. Web based online monitoring system of track assets viz. Track database
and decision support system has been adopted to decide rationalized
maintenance requirement and optimize inputs.
20. Detailed instructions on issues related with safety of Track, e.g.
integrated block, corridor block, worksite safety, monsoon precautions,
etc. have been issued.
21. Preventive maintenance of railway assets (Coaches & Wagons) is
undertaken to ensure safe train operations.
22. Replacement of conventional ICF design coaches with LHB design
coaches is being done.
23. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route have
been eliminated by January 2019.
24. Safety of Railway Bridges is ensured through regular inspection of
Bridges. The requirement of repair/rehabilitation of Bridges is taken up
based upon the conditions assessed during these inspections.
25. Indian Railways has displayed Statutory “Fire Notices” for widespread
passenger information in all coaches. Fire posters are provided in every
coach so as to educate and alert passengers regarding various Do’s and
Don’ts to prevent fire. These include messages regarding not carrying
any inflammable material, explosives, prohibition of smoking inside the
coaches, penalties etc.
--4/--4-
26. Production Units are providing Fire detection and suppression system in
newly manufactured Power Cars and Pantry Cars, Fire and Smoke
detection system in newly manufactured coaches. Progressive fitment
of the same in existing coaches is also underway by Zonal Railways in a
phased manner.
27. Regular counselling and training of staff is undertaken.
28. Concept of Rolling Block introduced in Indian Railways (Open Lines)
General Rules vide Gazette notification dated 30.11.2023, wherein work
of integrated maintenance/ repair/replacement of assets is planned up
to 52 weeks in advance on rolling basis and executed as per plan.
The details of the Safety related works related to better maintenance
practices, Technological improvements, better infrastructure and rolling
stock etc. undertaken by Railways are tabulated below:-
2004-05 to 2014-15 to 2014-25 Vs.
S.N. Item
2013-14 2024-25 2004-14
Technological Improvements
1. Use of high-quality 57,450 Km 1.43 Lakh Km More than 2
rails (60 Kg) (Km) times
2. Longer Rail Panels 9,917 Km 77,522 Km Nearly 8
(260m) (Km) times
3. Electronic 837 3,691 Stations More than 4
Interlocking (Stations) Stations times
4. Fog Pass Safety As on As on 31.03.25: 288 times
Devices (Nos.) 31.03.14: 25,939 Nos.
90 Nos.
5. Thick Web Switches Nil 28,301 Nos.
(Nos.)
Better Maintenance Practices
1. Primary Rail Renewal 32,260 Km 49,941 Km 1.5 times
(Track Km)
2. USFD (Ultra Sonic 79.43 Lakh 2 Crore More than 2
Flaw detection) times
Testing of Welds
(Nos.)
--5/--5-
3. Weld failures (Nos.) In 2013-14: In 2024-25: 90 %
3699 Nos. 370 Nos. reduction
4. Rail fractures (Nos.) In 2013-14: In 2024-25: More than
2548 Nos. 289 Nos. 88%
reduction
Better Infrastructure and Rolling Stock
1. New Track KM added 14,985 Km 34,428 Km More than 2
(Track Km) times
2. Flyovers 4,148 Nos. 13,808 Nos. More than 3
(RoBs)/Underpasses times
(RUBs) (Nos.)
3. Unmanned Level As on As on Removed
crossings 31.03.14: 31.03.24:Nil
(Nos.) on BG 8,948 (All eliminated
by 31.01.19)
4. Manufacture of LHB 2,337 Nos. 42,677 More than 18
Coaches (Nos.) times
Implementation of Kavach:
1. Kavach is an indigenously developed Automatic Train Protection (ATP)
system. Kavach is a highly technology intensive system, which requires
safety certification of highest order (SIL-4).
2. Kavach aids the Loco Pilot in running of trains within specified speed
limits by automatic application of brakes in case Loco Pilot fails to do
so and also helps the trains to run safely during inclement weather.
3. The first field trials on the passenger trains were started in February
2016. Based on the experience gained and Independent Safety
Assessment of the system by Independent Safety Assessor (ISA), three
firms were approved in 2018-19, for supply of Kavach Ver 3.2.
4. Kavach was adopted as National ATP system in July, 2020.
5. Implementation of Kavach System involves following Key Activities:
a. Installation of Station Kavach at each and every station, block
section.
--6/--6-
b. Installation of RFID Tags throughout the track length.
c. Installation of telecom Towers throughout the section.
d. Laying of Optical Fibre Cable along the track.
e. Provision of Loco Kavach on each and every Locomotive running on
Indian Railways.
6. Based on deployment of Kavach version 3.2 on 1465 RKm on South
Central Railway and experience gained, further improvements were
made. Finally, Kavach specification version 4.0 was approved by RDSO
on 16.07.2024.
7. Kavach version 4.0 covers all the major features required for the diverse
railway network. This is a significant milestone in safety for Indian
Railways. Within a short period, IR has developed, tested and started
deploying Automatic Train Protection System.
8. Major improvement in Version 4.0 includes increased Location
Accuracy, Improved Information of Signal Aspects in bigger yards,
Station to Station Kavach interface on OFC and Direct Interface to
existing Electronic Interlocking System. With these improvements,
Kavach Ver.4.0. is planned for large scale deployment over Indian
Railways.
9. After extensive and elaborate trials, Kavach Version 4.0 has been
successfully commissioned on 1297 Route Kilometres, covering the high
density Delhi- Mumbai and Delhi-Howrah routes. On the Delhi–Mumbai
route Kavach ver 4.0 has been commissioned on Junction cabin-Palwal–
Mathura–Nagda section (667 Rkm), Vadodara- Virar section (336 Rkm)
and Vadodara - Ahmedabad section (96 Rkm), and on the Delhi–Howrah
route Kavach ver 4.0 has been commissioned on Gaya Sarmatanr
section (93 Rkm) and Howrah–Bardhaman section (105 Rkm).
10. Further, track side Kavach implementation work has been taken up on
23,360 RKM covering all GQ, GD, HDN and identified sections of Indian
Railways.
11. Progress of key items of Kavach on High density routes including
Delhi– Mumbai & Delhi– Howrah corridors as on 30.01.26 are as under:
--7/--7-
SN Item Progress
i. Laying of Optical Fibre Cable 8570 Km
ii. Installation of Telecom Towers 938 Nos
iii. Station Data Centre 767 Station
Installation of Track side 5672 Rkm
iv.
equipment
v. Provision of Kavach in Loco 4154
12. Tender has been finalised for equipping 6,300 Electric Locomotives
with Kavach version 4.0 and another tender for equipping 2,679 Diesel
Locomotives is under finalisation.
13. Specialized training programmes on Kavach are being conducted at
centralized training institutes of Indian Railways to impart training to all
concerned officials. By now about 48,000 technicians, operators and
engineers have been trained on Kavach technology. This includes about
45,000 Loco Pilots & Assistant Loco Pilots. Courses have been designed
in collaboration with IRISET.
14. The cost for provision of Track Side including Station equipment of
Kavach is approximately Rs. 50 Lakhs/Km and cost for provision of
Kavach equipment on locomotives is approximately Rs. 80 Lakh/Loco.
15. The funds utilized on Kavach works so far up to Dec'25 is Rs. 2,573.36
Crores. The allocation of funds during the year 2025-26 is Rs. 1673.19
Crores. Requisite funds are made available as per the progress of works.
*****