Home India Ministry of Jal Shakti Parliament Question: Large dams exceeding their lifespan...
Date: 2026-03-30 Category: RAJYASABHA_QNA State: Union Government Country: India

Parliament Question: Large dams exceeding their lifespan

Issued by Ministry of Jal Shakti · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF JAL SHAKTI DEPARTMENT OF WATER RESOURCES, RIVER DEVELOPMENT & GANGA REJUVENATION RAJYA SABHA UNSTARRED QUESTION NO. 4072 ANSWERED ON 30.03.2026 LARGE DAMS EXCEEDING THEIR LIFESPAN 4072 Dr. ASHOK KUMAR MITTAL: Will the Minister of Jal Shakti be pleased to state: (a) the total number of large dams in the country that have exceeded their designed lifespan and pose a severe structural threat; (b) whether multiple State Governments have failed to establish functional State Dam Safety Organizations as mandated by the Dam Safety Act; (c) the details of recent dam failures or structural breaches reported and the consequent loss of life and property; (d) the reasons for the severe underutilization of funds allocated for the Dam Rehabilitation and Improvement Project (DRIP); and (e) the steps taken to legally prosecute authorities failing to conduct mandatory pre-monsoon safety audits? ANSWER THE MINISTER OF STATE FOR JAL SHAKTI (SHRI RAJ BHUSHAN CHOUDHARY) (a) There is no prescribed lifespan of a dam in our country. A dam’s effective life extends as long as it reliably performs its intended functions without compromising public safety. A dams’ age alone does not determine its stability or risk of structural failure. These critical infrastructures can maintain a viable operational lifespan when subjected to rigorous technical evaluations and proper upkeep. Accordingly, dams that are old but well-maintained and rehabilitated as per safety protocols continue to function safely, while any dam found to be under distress condition is addressed through the statutory framework under the Dam Safety Act, 2021. As per the National Register of Specified dams 2025, compiled by the National Dam Safety Authority (NDSA), there are 6,545 completed and functional specified dams in the country. As per the latest post monsoon inspections of 2025, three specified dams have been classified under Category-I (i.e., deficiencies in dams which, if left unattended, may lead to failure), 243 specified dams are in Category-II (i.e., major deficiencies in dams requiring prompt remedial measures). Rest of the specified dams of the country are in Category-III. 1(b) In compliance with the provisions of the Act, all 31 dam-owning States and Union Territories have constituted their respective State Committees on Dam Safety (SCDSs) and established the State Dam Safety Organisations (SDSOs). These institutional mechanisms are operational, thereby ensuring structured oversight, coordination, and implementation of dam safety measures at the State/UT level. (c) A summary of dam incidents and failures reported after the enactment of the Dam Safety Act, 2021 highlighting their causes, and other details is given at Annexure. (d) Significant progress has been achieved under the externally aided Dam Rehabilitation and Improvement Project (DRIP-II) Scheme. The participating States and implementing agencies have accelerated key interventions, including dam rehabilitation works, safety improvement works, instrumentation, preparation of safety documentation, and capacity-building activities. Project execution has gained momentum with improved coordination among stakeholders, timely mobilization of technical resources and strengthened monitoring mechanisms. However, the progress of works, and consequently fund utilization, at certain implementing agencies has been relatively slow. This is primarily attributable to delays in submission of comprehensive rehabilitation proposals and in converting approved proposals into awarded contracts. Further constraints include limited working seasons for execution of dam rehabilitation works, inadequate bidder participation in certain tenders, and the requirement for revisions in design and drawings during execution, particularly in technically complex rehabilitation projects. (e) As per the provisions of Section 31 of the Dam Safety Act, 2021, every owner of a specified dam is statutorily mandated to carry out pre-monsoon and post-monsoon inspections each year for every dam under their jurisdiction. Following the enactment of the Act, there has been a significant and measurable enhancement in the frequency and coverage of dam inspection activities across the country. At present, nearly all specified dams are being inspected biannually by the respective dam owners, and detailed inspection reports are prepared and submitted to the concerned State Dam Safety Organisation (SDSO) as well as the National Dam Safety Authority (NDSA). Further, these inspection activities are being closely monitored by both the SDSO and NDSA to ensure strict adherence to timelines and prescribed standards of reporting. The findings and recommendations emerging from these inspection reports are being utilized by the States for prioritization and implementation of requisite safety measures and remedial actions. In instances where inspections have not been carried out, the SDSO and NDSA have issued necessary directions to the concerned dam authorities to initiate immediate corrective action and ensure compliance in a time-bound manner. *** 2ANNEXURE ANNEXURE REFERRED TO IN REPLY TO PART (c) OF UNSTARRED QUESTION NO. 4072 TO BE ANSWERED IN RAJYA SABHA ON 30.03.2026 REGARDING “LARGE DAMS EXCEEDING THEIR LIFESPAN”. Max. Date of Category Sl.N Name of Year of State Height Failure/ Details of failure/ Incident (Incident o Project Completion (M) Incident / Failure) 1 Madhya Karam Dam 52 Under 11-08-2022 Slope failure and piping. On August 11, 2022 due to heavy rainfall in catchment area Incident Pradesh Construction water has been impounded upto RL 296 m and piping was observed at RD 430 m. 2 Madhya Ardala Dam 2015 12-09-2022 leakage observed with rising water level Incident Pradesh 3 Kerala Parambikulam 73.15 1967 22/09/2022 On 21.09.2022 at around 2:00 AM, Spillway Shutter No. 2 was suddenly damaged Incident Dam and broke out, resulting in the release of approximately 20,000 cusecs of water from the reservoir. The failure appears to have occurred due to the breaking of the left-side chain link arrangement that connected the shutter to the counterweight. As a result, the counterweight became unbalanced, causing the chain to be pulled out from the gear assembly. This led to the downward movement of the counterweight. 4 Andhra Sree Pothuluri 50.5 2006 13/12/2022 The construction of the main dam was completed during 1999-2000 and first filling Incident Pradesh Veera of the Dam was during 2005-06. Sweating and oozing was observed when the Brahmendra reservoir was filled upto the level 210.30 m. In December-2022, when the water level Swamy was +213.070 M and the corresponding Storage is 15.94 TMC, heavy seepage to the Reservoir tune of 8 litres per second is observed in the reach from RD 1620 m to 1650 m. Sand (SPVBR) and metal filters are laid in the oozing area for safe discharge of the seepage water. 5 Himachal Malana-II 53 2012 24/07/2023 Overtopped due to jammed radial gates from slush and boulders, causing scouring on Incident Pradesh HEP the left bank. 6 Madhya PondiJaitgarh 12.15 2008 25/07/2023 Due to heavy rainfall between 23/07/23-24/07/23 the water in the reservoir reached Failure Pradesh Dam FTL and started to spill out from waste weir. Seepage started from 24/07/2023 evening which was increasing at fast rate. Dam breached on 25/07/2023 morning between RD 220 m and RD 270 m 7 Telangana Kaddam Dam 31 1955 27/07/2023 Excessive inflow Incident 8 Sikkim Teesta Basin 60 2017 04-10-2023 Sudden outburst in South Lhonak Glacial Lake in Sikkim lead to Flooding (GLOF) in Failure dams (Teesta Teesta River on the night of 03-04 October 2023 lead to washing way of Teesta –III 3III dam, dam and heavy damages to Teesta-V dam. TLDP-II dam and TLDP-IV dam are also Teesta-V affected but no major damage has been reported dam, Teesta- VI Barrage (Under- Construction), TLDP-III Dam, TLDP- IV Dam), Sikkim and West Bengal 9 Telangana (Kaleshwaram20.1 2019 21/10/2023 Settlement of pier of Medigadda Barrage on the night of 21/10/2023 lead to sudden Failure Project) release of 2.7 lakh cusec. Construction of the Barrage was completed in 2019. Medigadda Observed leakage of water in the D/S of Annaram (Saraswathi) Barrage, Telangana (Lakshmi ) (The piers from 16 to 21, along with the raft have sunk to varying depths and piers Barrage tilted to varying degrees) Annaram and Sundilla 10 Assam Subansiri 130 Underconstru 27/10/2023 Landslide lead to obstruction of diversion tunnel and water flow through the river Incident Lower HEP ction 11 Punjab Ranjit Sagar 147 2001 02/02/2024 Two consecutive incidences of sliding of upstream left side spillway approach Incident Dam & channel benches of Ranjit Sagar Dam on 02.02.2024 & 17.04.2024. 17/04/2024 12 Maharasht Lohara 15.35 2017 15/07/2024 On 15th July 2024, due to heavy rainfall and a cloudburst-like situation in the Failure ra Storage tank catchment area of the Lohara Storage Tank, there was a sudden increase in inflow of water. A total of 64 mm rainfall was recorded at the UrdhavPenganga Project rain gauge, Sirasm (Dist. Hingoli). As a result, the main body wall (32 m length, chainage 148 m–180 m) was partially washed out on the downstream side. Additionally, the embankment between CH 180–216 (top) and CH 195–205 (bottom) was completely drained out into the nalla portion. 13 Telangana Peddavagu 22 1981 19/07/2024 Heavy rainfall and the malfunctioning of one of the three crest gates resulted in Failure & AP Dam overtopping. The left flank bund and a portion of the right flank bund were breached due to heavy floods, with a discharge of 76,000 cusecs, exceeding the design capacity of 40,500 cusecs. (19/07/2024) 414 Himachal Malana II 53 2012 31/07/2024 Cloud burst occurred in Malana catchment in the night of 31.07.2024 and damage to Failure Pradesh the Malana dam. Reportedly, the incident has caused damages in the downstream area due to excessive discharge from the dam 15 Himachal Malana-I HEP 17 2001 31/07/2025 Cloud burst occurred in Malana catchment in the night of 31.07.2024 and damage to Failure Pradesh the Malana dam. Reportedly, the incident has caused damages in the downstream area due to excessive discharge from the dam 16 Himachal Pandoh Dam 76.2 1977 01-08-2024 Cloud burst occurred in the upper reaches of the Beas River during early morning of Incident Pradesh 01-08-2024 which lead to very heavy ingress of trash & silt in the Pandoh reservoir. The very heavy silt load has resulted in jamming of 02 no. spillway gates of the Pandoh Dam 17 ChhattisgaVenika Dam 20.5 2019 02-08-2024 Overtopping of Venika dam on Mahan River which is owned by private company. Failure rh Reportedly, the incident has caused damages in the downstream area due to uncontrolled spilling of water from the dam due to non-opening of radial gates. 18 Karnataka Tungabhadra 49.39 1953 10-08-2024 Spillway gate no. 19 was washed away from the groove of the spillway on Incident Dam 10.08.2024 at 10:50 PM. 19 Jharkhand Bokaro 11.56 1953 03-08-2024 Incident of collapse of two gates (no. 4 &8)in the morning on 3/8/24 due to heavy Incident barrage rainfall in Damodar River catchment resulted in large inflow into the reservoir. 20 Uttar Matatila Dam 45.72 1964 05-05-2025 Damage to drain chute, gauge, pitching of Matatila Dam due to waves driven by Incident Pradesh Lalitpur, strong winds. 21 Punjab Shahpurkandi 55.57 Underconstru 07-06-2025 Seepage of Water Through Temporary Dyke at Power House No. 2. Water entered Incident Dam Project ction the working area of the Tail Race Channel portion downstream of Power House No. 2, filling the area from Elevation Level (EL) 338.00 m to EL 344.50 m. No construction activity was going on at site at that time and no damage occurred to the structure. 22 Himachal Parbati Stage- 83.7 Underconstru 25/06/2025 PARBATI-II Incident Pradesh II ction Cloud burst incident leading to heavy silt/ sludge up to 10 to 12 feet has been deposited in the MIV floor, Protecton/ Protection wall and TRC (Tail race channel) of powerhouse has been completely Damaged, extensive damage to Jiwa Trench weir, Intake Gate, Silt Flushing Channel and other structures at the site, extensive damage to Hurla Trench weir, and other structures at the site etc. 23 Himachal Parbati Stage- 43 2014 25/06/2026 Parbati-III Incident Pradesh III Damages have been observed downstream of Dam Plunge pool. PP gabion crates, Wire crates and concrete blocks have been washed out on left and right bank of the plunge pool, both DT Gates have been stuck in silt. 524 Madhya Padariya 16.13 2013 12-07-2025 Due to excessive rainfall in the catchment, Dam overflown led to embankment Failure Pradesh Dam, breached (RD 510-590 m). Chhatarpur, 25 Chhattisg Luti Tank 12.8 1982 02-09-2025 Due to very heavy rainfall in the catchment, the dam has failed due to overtopping Failure arh resulting in loss of lives of people 26 Chhattisg Rajadera Tank 18.69 1982 02-11-2025 A seepage issue was reported at the dam site on 1 November 2025, as observed by Failure arh the Executive Engineer. The seepage occurred on the downstream slope near the toe portion and was attributed to piping. Subsequently, on 2 November 2025 at approximately 5:00 A.M., the dam breached along the right flank portion. Although some newspaper reports mentioned agricultural loss in the downstream village, the field assessment confirmed that there was no loss of life or agricultural damage. The expert team assessed that the piping failure may have occurred due to animal burrowing. 27 Karnataka Mangala 13.1 1969 17/12/2025 On 17.12.2025 at about 1:30 a.m., a 2 m portion of the UCR wall near the sluice vent Incident of Mangala Reservoir collapsed, causing seepage of approximately 580 cusecs. Emergency repair works were immediately undertaken using boulders and sandbags, and about 90% of the leakage has been controlled. Around 5–8 cusecs of leakage is still observed, and further repair works are in progress. 28 Karnataka Hipparagi 26 2004 06-01-2026 On 06-01-2026, the gate plate of Gate No. 22 of Hipparagi Barrage was damaged, Incident Barrage with about 1.30 m of the 8.23 m high gate collapsing, while the remaining 6.93 m remains intact. Water is flowing downstream through the upper portion of the collapsed gate, with an estimated discharge of approximately 6000 cusecs. ***** 67

Continue your research