See Full Document Text
O.I.H.
GOVERNMENT OF INDIA
MINISTRY OF RURAL DEVELOPMENT
DEPARTMENT OF RURAL DEVELOPMENT
LOK SABHA
UNSTARRED QUESTION NO. 5248
ANSWERED ON 24/03/2026
MAINTENANCE AND REPAIR OF RURAL ROADS
5248. Smt. Krishna Devi Shivshankar Patel:
Will the Minister of RURAL DEVELOPMENT be pleased to state:
(a) whether several roads in the rural areas constructed under the
Pradhan Mantri Gram Sadak Yojana has turned dilapidated at
numerous points and essentially call for timely maintenance and
repair, if so, the details thereof;
(b) the number of new roads constructed including those subjected
to reconstruction/strengthening (upgradation) in the country
during the last three years, State-wise particularly including in
Uttar Pradesh;
(c) whether the Government has approved any fresh proposal and
special package for the strengthening/widening of the old roads
and construction of new rural roads;
(d) if so, the details thereof including the Budget approved for the
same; and
(e) whether the Government proposes to enforce any stringent
provisions to ensure the maintenance of roads for a certain
period in the wake of quality control and construction work?
ANSWER
MINISTER OF STATE IN THE MINISTRY OF RURAL DEVELOPMENT
(SHRI KAMLESH PASWAN)
(a): ‘Rural Roads’ is a state subject and Pradhan Mantri Gram Sadak
Yojana (PMGSY) is a one-time special intervention to provide rural
connectivity, by way of a single all-weather road to the eligible
unconnected habitations in the core network. Maintenance of roads
constructed under the programme is the responsibility of the State
Governments and all road works are covered by initial five-year
maintenance contracts to be entered into along with the construction
contract, with the same contractor, as per the Standard Bidding
Document. Maintenance funds to service the contract are required to
Page 1 of 4be budgeted by the State Governments and placed at the disposal of
the State Rural Roads Development Agencies (SRRDAs) in a separate
maintenance account. On expiry of the 5 year post construction
maintenance, PMGSY roads are required to be placed under Zonal
maintenance contracts consisting of 5 year maintenance, including
renewal as per maintenance cycle, from time to time, which are also
financed by the state governments.
Besides the above, several measures have been adopted to ensure
the durability of the roads being constructed under the scheme. The
details are as follows:
i. Roads under PMGSY are constructed following the Indian
Roads Congress (IRC) standards and specifications to ensure
high quality.
ii. Innovative and sustainable construction techniques are
increasingly adopted for roads in challenging terrains.
iii. In light of climate change impacts, efforts are focused on
designing roads that can withstand extreme weather conditions.
This includes improved drainage systems, disaster-resilient
structures, and alignment planning to minimise vulnerabilities.
iv. Training programs are organised for engineers and
contractors to familiarise them with the latest technologies,
materials.
(b): During the last three years, the details of roads
constructed/upgraded across the country, including in the state of
Uttar Pradesh under various verticals of PMGSY, are given below: -
Details of road constructed in the country, including Uttar Pradesh
Financial Year Number of Roads Length (Km)
2022-23 6,073 29,733.45
2023-24 4,442 26,099.69
2024-25 2,830 18,108.36
Details of the road constructed in the State of Uttar Pradesh
Financial Year Number of Roads Length (Km)
2022-23 744 5,011.09
2023-24 911 6,798.80
2024-25 495 2,807.85
Page 2 of 4State-wise details may be accessed at the programme website
https://pmgsy.dord.gov.in ->Progress Monitoring >Financial Year-wise
Achievement.
(c) & (d): The Government has recently launched Pradhan Mantri
Gram Sadak Yojana-IV (PMGSY-IV) for the period 2024-25 to 2028-29.
This fresh intervention aims to provide all-weather connectivity to
approximately 25,000 unconnected habitations through the
construction of 62,500 km of new roads.
The total approved outlay for PMGSY-IV is Rs. 70,125 crore (Central
Share: Rs. 49,087.50 crore; State Share: Rs. 21,037.50 crore). The
eligibility criteria for habitations under this phase, as per Census
2011, are:
(i) Plains: 500+ population.
(ii) North East, Hill States, and Special Category Areas: 250+
population.
(iii) LWE-Affected Districts: 100+ population.
To ensure fiscal discipline and project sustainability, the Ministry has
established the following robust mechanism for the release of funds:
i. States/UTs must sign a Memorandum of Understanding (MoU)
committing to the full budgetary support for the initial 5-year
post-construction maintenance and the subsequent 5-year
renewal cycle.
ii. The release of the Central Share is strictly conditional upon the
timely release of maintenance funds by the State. For fund
proposals submitted after May, States must certify the release
of at least 50% of the annual maintenance requirement; for
proposals after November, 100% certification is mandatory.
iii. Fund flow is managed through the SNA-SPARSH system to
ensure real-time tracking, transparency, and utilisation-linked
releases.
(e): The Government has already incorporated stringent provisions
under the PMGSY to ensure maintenance of roads and adherence to
quality standards. The key provisions are as follows:
i. All PMGSY works are covered under a 5-year Defect Liability
Period, during which the contractor is responsible for routine
maintenance of the road. Any defects observed during this
period must be rectified by the contractor at their own cost.
ii. Maintenance during the DLP is linked with performance-based
payments, ensuring that contractors maintain the road in good
condition to receive payments.
Page 3 of 4iii. After completion of the 5-year DLP, the responsibility of
maintenance is transferred to the respective State
Governments. States are required to make adequate budgetary
provisions for continued maintenance.
iv. The Government has implemented the eMARG platform to
monitor maintenance activities, including post-5-year
maintenance, ensuring transparency and accountability.
v. A three-tier quality control system (PIU, State Quality Monitors,
and National Quality Monitors) is in place to ensure quality
construction and maintenance of roads.
vi. Stringent penal actions, including withholding of payments,
recovery, and debarment of contractors, are enforced in cases
of poor quality or failure to maintain roads as per standards.
*****