GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 4258
TO BE ANSWERED ON 18.03.2026
NANDYAL-BANAGANAPALLE-BETHAMCHERLA-ORVAKAL-KURNOOL NEW
RAIL LINE
4258. DR. BYREDDY SHABARI:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Government has received any proposals, requests, or
surveys for the introduction of a new railway line connecting the
Nandyal–Banaganapalle–Bethamcherla–Orvakal–Kurnool route;
(b) if so, the current status of such proposals including dates of
submission, approvals and reasons for any delay in sanctioning or
budget allocation;
(c) whether a Final Location Survey (FLS) has been conducted for this
route and if so, details of the findings, estimated project cost, and
timeline for implementation; and
(d) whether the Government proposes to sanction and allocate funds for
this route to improve intra-state connectivity and regional
development and if so, the tentative timelines and priorities?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (d): Banaganapalle, Bethamcherla and Nandyal are already
connected through existing railway network. Bethamcherla is connected to
Kurnool via Dhone. However, for direct connectivity of Bethamcherla to
Contd…2
§-2-
Kurnool via Orvakal, Final Location Survey (FLS) for Dupadu (Kurnool)-
Bethamcherla via Orvakal new line (48 Km) has been sanctioned for
preparation of Detailed Project Report (DPR). The field survey work has
been completed.
After preparation of DPR, sanctioning of project requires consultation with
various stake-holders including State Governments and necessary
approvals viz. appraisal of NITI Aayog, Ministry of Finance etc. As
sanctioning of projects is a continuous and dynamic process, exact
timelines cannot be fixed.
Sanction of any railway project depends upon many parameters/factors
which include the following:
Anticipated traffic projections and remunerativeness of the proposed
route
First and last mile connectivity provided by the project
Connection of missing links and providing additional route
Augmentation of congested/saturated lines
Demands raised by State Governments/Central Ministries/Public
representatives,
Railway’s operational requirements
Socio-economic considerations
Overall availability of funds
*****