Parliament Question: New Railway line between Nashik Road-Shirdi via Sinnar

Issued by RAILWAYS · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** This document is an answer to Unstarred Question No. 2990 in the Lok Sabha regarding the new railway line between Nashik Road-Shirdi via Sinnar and the development of Nashik Road railway station. It provides an update on the feasibility studies and surveys conducted for the new railway line and details of the upgrades at Nashik Road station under the Amrit Bharat Station Scheme. The response was issued on 17.12.2025. Exact timelines for sanctioning of projects cannot be fixed. **Key Points / Main Content** * **New Railway Line (Nashik Road-Shirdi via Sinnar):** * The feasibility study for the Nashik Road - Sinnar - Shirdi new line (83 km) has been completed. * Final Location Survey (FLS) for Nashik - Sinnar - Sainagar Shirdi new line (96 km) has been completed recently, and the Detailed Project Report (DPR) has been prepared. * Sanctioning of the project requires consultation with stakeholders, including State Governments, NITI Aayog, and the Ministry of Finance. * Exact timelines cannot be fixed. * **Nashik Road Station Upgrades:** * The work for provision of 2 stabling lines in down direction has been sanctioned. Track laying for stabling line No.1 is completed and work for stabling line No.2 has been taken up. * Nashik Road railway station has been identified for redevelopment under the Amrit Bharat Station Scheme. * Work for provision of new 12m wide foot over bridge, enroute coach watering, Mela Tower Control Center, Circulating Area Development, Boundary Wall, platform Surfacing, 16 toilet blocks, divyangjan toilets, signages, furniture, 6m wide foot over bridge, east side new building, circulating area and parking has been sanctioned and work awarded. * Work for provision of RCC overhead tank, underground tank, new pump room, pipeline work to improve watering facility, up-gradation of Nashik Road Railway Station, dismantling of existing old foot over bridge, passenger information system, and platform shelter at platform no. 2, 3 & 4 have been sanctioned. * **Amrit Bharat Station Scheme:** * The scheme envisages the development of stations on a continuous basis with a long-term approach, including the preparation of master plans and their implementation in phases. * Improvements include: * Access to station and circulating areas * Integration of station with both sides of city * Station building * Waiting halls, toilets, sitting arrangement, water booths * Wider foot over bridge/air concourse * Lifts/escalators/ramps * Platform surface and cover * Kiosks for local products ('One Station One Product') * Parking areas, Multimodal integration * Amenities for Divyangjans * Passenger information systems * Executive lounges, spaces for business meetings, landscaping * Sustainable and environment friendly solutions, ballast less tracks etc. as per necessity, phasing and feasibility and creation of city centre at the station in the long term **Impact Analysis** **Stakeholder: Passengers / Commuters** **Impact** Improved railway infrastructure, including new railway line, better station facilities (waiting areas, toilets, access, amenities), enhanced accessibility, and improved information systems. **Action Required** No immediate action is required from passengers; however, they can expect gradual improvements at Nashik Road station as the Amrit Bharat Station Scheme is implemented. **Stakeholder: Ministry of Railways** **Impact** Responsible for overseeing the implementation of the new railway line project and upgrades at Nashik Road station under the Amrit Bharat Station Scheme. **Action Required** Continued monitoring and management of the project, including consultation with stakeholders, securing necessary approvals, and ensuring timely completion of the work. **Stakeholder: State Government of Maharashtra** **Impact** Involved in consultations and approvals for the new railway line project, as well as the development of Nashik Road station. **Action Required** Participate in consultations and provide necessary approvals for the new railway line project and upgrades at Nashik Road station. **Stakeholder: Local Businesses** **Impact** Potential opportunity to participate in 'One Station One Product' Scheme. **Action Required** Participate in the Scheme.

Key Entities Referenced

Ministry of Railways: The Indian government ministry responsible for the country's railway system. Amrit Bharat Station Scheme: A scheme for the development of railway stations with a long-term approach. Nashik-Shirdi via Sinnar: The location of a new railway line project. NITI Aayog: A policy think tank of the Government of India.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO. 2990 TO BE ANSWERED ON 17.12.2025 NEW RAILWAY LINE BETWEEN NASHIK ROAD-SHIRDI VIA SINNAR 2990. SHRI RAJABHAU PARAG PRAKASH WAJE: Will the Minister of RAILWAYS be pleased to state: (a) the details of current status of the work of Reconnaissance Engineering cum Traffic Survey for new line between NK (Nashik)-Shirdi via Sinnar (72 km) and the timelines fixed for completion/getting final report; (b) the details of current status of work of Final Location Survey for New BG Line from Nashik-Shirdi via Sinnar (82.81 kms) and timelines fixed for completion/getting final report; (c) the details of timeline for sanctioning of funds and start of actual work on the said project; and (d) the current status of the works of provision of two stabling lines in Down direction at NK station, provision of enroute coach watering of nominated trains at NK and provision of 12 m wide new Foot Over Bridge at NK? ANSWER MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND ELECTRONICS & INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW) (a) to (d): Feasibility study for Nashik Road - Sinnar - Shirdi new line (83 km) was completed. To assess latest traffic projections and cost, Final Location Survey (FLS) for Nashik - Sinnar - Sainagar Shirdi new line (96 Contd….2/--:2:- km) has also been completed recently and Detailed Project Report (DPR) has been prepared. After preparation of DPR, sanctioning of project requires consultation with various stake-holders including State Governments and necessary approvals viz. appraisal of NITI Aayog, Ministry of Finance etc. As sanctioning of projects is a continuous and dynamic process, exact timelines cannot be fixed. The work for provision of 2 stabling lines in down direction at Nashik Road has been sanctioned. Track laying work of stabling line No.1 is completed and work for stabling line No.2 has been taken up. Nashik Road railway station falling in Maharashtra has been identified for redevelopment under Amrit Bharat Station Scheme. At Nashik Road Railway station, work for provision of new 12m wide foot over bridge, provision of enroute coach watering on requirement basis, the work for provision of Mela Tower Control Center, Circulating Area Development, Boundary Wall, platform Surfacing, the work of improvement of 16 toilet blocks, provision of divyangjan toilets, signages, provision of furniture, construction of 6m wide foot over bridge, construction of east side new building, development of circulating area and parking has been sanctioned and work awarded. Further, the work for provision of RCC overhead tank, underground tank, new pump room, pipeline work to improve watering facility at station, up-gradation of Nashik Road Railway Station, dismantling of existing Contd….3/--:3:- old foot over bridge, work for provision of passenger information system and work for provision of platform shelter at platform no. 2, 3 & 4 have been sanctioned. The Amrit Bharat Station scheme envisages development of stations on a continuous basis with a long-term approach. The scheme involves preparation of master plans and their implementation in phases to improve the stations. The master planning, keeping in view the necessity at each station, includes:-  Improvement of access to station and circulating areas  Integration of station with both sides of city  Improvement of station building  Improvement of waiting halls, toilets, sitting arrangement, water booths  Provision of wider foot over bridge/air concourse commensurate with passenger traffic  Provision of lift/escalators/ramp  Improvement/Provision of platform surface and cover over platforms  Provision of kiosks for local products through schemes like ‘One Station One Product’  Parking areas, Multimodal integration  Amenities for Divyangjans  Better passenger information systems  Provision of executive lounges, nominated spaces for business meetings, landscaping, etc. Contd….4/--:4:- The scheme also envisages sustainable and environment friendly solutions, provision of ballast less tracks etc. as per necessity, phasing and feasibility and creation of city centre at the station in the long term. *****