Will the Minister of RAILWAYS be pleased to state:
(a) the present status of implementation of Kavach 4.0 system and
whether the target of covering 1300 route kilometers has been
achieved;
(b) the manner in which the Government is planning to utilise Rs.1.2 lakh
crore security budget to expeditiously deploy Automatic Train
Protection system on high-density rail corridors particularly in Kota
division under West-Central Railway;
(c) whether the AI-enabled intrusion detection system used in wildlife
corridors is being expanded to cover all sensitive ecological zones
across the network and if so, the details thereof; and
(d) the reasons behind integrating the optical fiber networks with the
Kavach system including the manner in which the said integration
strengthens real-time communication in remote areas including Palghar
district in Maharashtra?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (d): 1. Kavach is an indigenously developed Automatic Train
Protection (ATP) system. Kavach is a highly technology intensive
§system, which requires safety certification of highest order (SIL-4).
2. Kavach aids the Loco Pilot in running of trains within specified speed
limits by automatic application of brakes in case Loco Pilot fails to do
so and also helps the trains to run safely during inclement weather.
3. The first field trials on the passenger trains were started in February
2016. Based on the experience gained and Independent Safety
Assessment of the system by Independent Safety Assessor (ISA), three
firms were approved in 2018-19, for supply of Kavach Ver 3.2.
4. Kavach was adopted as National ATP system in July, 2020.
5. Implementation of Kavach System involves following Key Activities:
a) Installation of Station Kavach at each and every station, block
section.
b) Installation of RFID Tags throughout the track length.
c) Installation of telecom Towers throughout the section.
d) Laying of Optical Fibre Cable along the track.
e) Provision of Loco Kavach on each and every Locomotive running
on Indian Railways.
6. Based on deployment of Kavach version 3.2 on 1465 RKm on South
Central Railway and experience gained, further improvements were
made. Finally, Kavach specification version 4.0 was approved by RDSO
on 16.07.2024.
7. Kavach version 4.0 covers all the major features required for the
diverse railway network. This is a significant milestone in safety for
Indian Railways. Within a short period, IR has developed, tested and
started deploying Automatic Train Protection System.8. Major improvement in Version 4.0 includes increased Location
Accuracy, Improved Information of Signal Aspects in bigger yards,
Station to Station Kavach interface on OFC and Direct Interface to
existing Electronic Interlocking System. With these improvements,
Kavach Ver.4.0. is planned for large scale deployment over Indian
Railways.
9. After extensive and elaborate trials, Kavach Version 4.0 has been
successfully commissioned on 1452 Route Kilometres, covering the
high density Delhi- Mumbai and Delhi-Howrah routes as below:
SN Section Progress (Route Km)
(1) Delhi-Mumbai route:
i Junction cabin – Palwal – Mathura 667
–Nagda section
(including high density route of
Kota division of WC Rly)
ii Vadodara - Ahmedabad section 96
iii Vadodara - Virar section 336
(Passes through Palghar distict)
(2) Delhi – Howrah route:
i Gaya Sarmatanr section 93
ii Chota Ambana - Bardhaman – 260
Howrah section
10. Further, track side Kavach implementation work has been taken up on
24,427 RKM covering all GQ,GD,HDN and identified sections of Indian
Railways. The sections mentioned above also pass through Kota
division and state of Maharashtra.11. Progress of key items of Kavach on High density routes including
Delhi– Mumbai & Delhi– Howrah corridors as on 14.03.2026 are as
under:
SN Item Progress
i Laying of Optical Fibre Cable 8570 Km
ii Installation of Telecom Towers 1100 nos
iii Station Data Centre 767 Station
iv Installation of Track side 6776 RKm
equipment
v Provision of Kavach in Loco 4211 nos
12. In addition, work for installation of Kavach in 8979 Locomotives and
1200 EMU/MEMU has been taken up.
13. Specialized training programmes on Kavach are being conducted at
centralized training institutes of Indian Railways to impart training to
all concerned officials. By now more than 55,000 technicians,
operators and engineers have been trained on Kavach technology.
This includes about 47,500 Loco Pilots & Assistant Loco Pilots.
Courses have been designed in collaboration with IRISET.
14. The cost for provision of Track Side including Station equipment of
Kavach is approximately Rs. 50 Lakhs/Km and cost for provision of
Kavach equipment on locomotives is approximately Rs. 80 Lakh/Loco.
15. The funds utilized on Kavach works so far up to Feb'26 is Rs. 2,763.90
Crores. The allocation of funds during the year 2025-26 is Rs. 1673.19
Crores. Requisite funds are made available as per the progress of
works.
16. One of the innovative measures taken is development of AI-enabled
Intrusion Detection System (IDS) for detecting presence of elephantson Railway tracks using Distributed Acoustic Sensors (DAS). The
system components includes Optical Fibre, hardware & pre-installed
signature of elephant locomotion. The system is designed to generate
alerts for loco pilots, station masters and Control Room about the
movement of elephants in proximity of railway tracks, for taking timely
preventive action. Presently, IDS system is working over 141 Route
kms on critical and vulnerable locations identified by forest
department in the Northeast Frontier railway zone. Works of IDS have
also been sanctioned for identified corridors of 1088 Route Kms
across Indian railways covering NFR(403.42 Rkm), ECoR(368.70 Rkm),
SR(55.85 Rkm), NR(52 Rkm), SER(55 Rkm), NER(18 Rkm), WR(115 Rkm)
& ECR(20.3 Rkm).
*****