GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 4368
TO BE ANSWERED ON 18.03.2026
PASSENGER AMENITIES AT ETAWAH AND FATEHPUR RAILWAY
STATIONS
†4368. SHRI JITENDRA KUMAR DOHARE:
SHRI NARESH CHANDRA UTTAM PATEL:
Will the Minister of RAILWAYS be pleased to state:
(a) the present status of the facilities provided/being provided to the
passengers at railway stations in the country particularly in Uttar
Pradesh;
(b) the details of the passenger amenities available at the railway
stations in Etawah and Fatehpur districts;
(c) the steps taken/being taken by the Government for the upgradation
and expansion of basic amenities like-waiting rooms, drinking water,
sanitation, lighting and Information Technology- based services;
(d) the details of the action taken so far in the said districts;
(e) whether accident-prevention systems, maintenance of tracks
security arrangements at the stations and onboard trains have been
strengthened in view of the passengers' safety; and
(f) if so, the details thereof particularly in Etawah and Fatehpur
districts?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (f) Etawah and Fatehpur stations, located in Uttar Pradesh have
been identified for development under Amrit Bharat Station Scheme.
§At Etawah station, facilities like high level platforms, platform shelter,
waiting hall, drinking water arrangement, urinal, lavatory, seating
arrangement, Foot Over Bridge etc. are available. The works of
improvement of station building, new G+1 station building at second
entry, improvement of waiting hall, Pay & Use toilet, Divyangjan toilet,
new parking, improvement of Passenger Reservation System room,
circulating area at main entry and second entry have been completed.
The work of 12 m Foot Over Bridge has been taken up.
At Fatehpur station, facilities like high level platforms, platform shelter,
waiting hall, drinking water arrangement, urinal, lavatory, seating
arrangement, Foot Over Bridge etc. are available.
The works taken up for development of Fatehpur station have been
completed which includes:
Improvement of main station building
New second entry building
New platform no. 4
Improvement of circulating area and parking
Divyangjan facilities
12 m Foot Over Bridge
In Etawah district, there are 11 stations namely Baidpur, Balrai,
Bharthana, Ekdil, Etawah, Ghasara Halt, Jaswant Nagar, Saiphai,
Samhon, Sarai Bhopat and Udi Mor Jn.
In Fatehpur district, there are 11 stations namely Aung, Bindki Road,
Faizullapur, Fatehpur, Kanspur Gugauli, Katoghan, Khaga, Kurasti Kalan,
Malwan, Rasulabad and Sath Naraini.
Amenities like waiting hall, platform shelter, drinking water
arrangement, urinal, seating arrangement etc. are available at above
stations.Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
So far, 1,338 stations have been identified for development under this
scheme, out of which, 157 stations including Etawah Junction station of
Etawah district and Fatehpur station of Fatehpur district, are located in
Uttar Pradesh. The names of stations identified for development under
Amrit Bharat Station Scheme in Uttar Pradesh are as following:
State No. of Name of Stations
Stations
Uttar 157 Achnera, Agra Cantt., Agra Fort, Aishbagh Jn,
Pradesh Akbarpur Jn, Aligarh, Amethi, Amroha, Anand
Nagar Jn., Aonla, Ayodhya Dham Junction,
Azamgarh, Babatpur, Bachhrawan, Badaun,
Badshahnagar, Badshahpur, Baheri, Bahraich,
Balamau Jn., Ballia, Balrampur, Banaras, Banda,
Barabanki Jn, Bareilly, Bareilly City, Barhni, Basti,
Belthara Road, Bhadohi, Bharatkund, Bhatni,
Bhuteshwar, Bijnor, Bulandsahar, Chandauli
Majhwar, Chandausi, Chilbila, Chitrakut dham
karwi, Chopan, Chunar Jn., Daliganj,
Darshannagar, Deoria Sadar, Dhampur,
Dildarnagar, Etawah Jn., Farrukhabad, Fatehabad,
Fatehpur, Fatehpur Sikri, Firozabad, Gajraula,
Garhmuktesar, Gauriganj, Ghatampur, Ghaziabad,
Ghazipur City, Gola Gokarnath, Gomtinagar,
Gonda, Gorakhpur, Govardhan, Govindpuri,
Gursahaiganj, Haidergarh, Hapur, Hardoi, Hathras
City, Idgah Agra Jn, Izzatnagar, Janghai Jn,State No. of Name of Stations
Stations
Jaunpur City, Jaunpur Jn, Kannauj, Kanpur
Anwarganj, Kanpur Bridge Left Bank, Kanpur
Central, Kaptanganj Jn, Kasganj Jn, Kashi,
Khalilabad, Khorason road, Khurja Jn., Kosi Kalan,
Kunda Harnamganj, Lakhimpur, Lalganj, Lalitpur
Jn, Lambhua, Lohta, Lucknow (Charbagh) NR,
Lucknow city, Lucknow Jn. (NER), Maa Belha Devi
Pratapgarh Junction, Maghar, Maharaja Bijli Pasi,
Mahoba Jn, Mailani Jn, Mainpuri Jn, Malhaur,
Manak Nagar, Manikpur Jn, Mariahu, Mathura Jn,
Mau Jn, Meerut City Jn, Mirzapur, Modinagar,
Mohanlalganj, Moradabad Jn, Muzaffarnagar,
Nagina, Najibabad Jn, Orai, Panki Dham,
Phaphamau Jn, Phulpur, Pilibhit Jn, Pokhrayan,
Prayag Jn, Prayagraj Jn, Pt. Deen Dayal Upadhyay
Jn , Rae Bareli Jn, Raja Ki Mandi, Ramghat Halt,
Rampur Jn, Renukoot, Saharanpur Jn., Salempur,
Seohara, Shahganj Jn, Shahjahanpur, Shamli,
Shikohabad Jn., Shivpur, Siddharth Nagar, Sitapur
Jn., Sonbhadra, Sri Krishna Nagar, Sultanpur Jn,
Suraimanpur, Swaminarayan Chappia, Takia,
Tulsipur, Tundla Jn., Ujhani, Unchahar, Unnao Jn,
Utraitia Jn, Varanasi Cantt., Varanasi City,
Vindhyachal, Virangana Lakshmibai Jhansi,
Vyasnagar, ZafarabadCompleted stations:
Development works at railway stations under Amrit Bharat Station
Scheme in Uttar Pradesh have been taken up at a good pace. Till
now, 23 stations in Uttar Pradesh have been completed. The name of
stations completed in Uttar Pradesh are as following :
State No. of Name of stations
stations
Uttar 23 Ayodhya Dham Junction, Balrampur, Bareilly City,
Pradesh Bijnor, Fatehabad, Fatehpur, Gola Gokarnath,
Gomtinagar, Govardhan, Govindpuri, Hathras City,
Idgah Agra Jn, Izzatnagar, Khalilabad, Mailani Jn,
Panki Dham, Pokhrayan, Ramghat Halt,
Saharanpur Jn., Siddharth Nagar, Suraimanpur,
Swaminarayan Chappia, Ujhani
The activities for development at other stations have also been taken
up at good pace and progress of some of the stations is as given
below:
Ghaziabad station: The structural works of station building at main
entry side and second entry side, foundation work of new Foot Over
Bridge-B at Tundla end, roof plaza, extension work of existing Foot
Over Bridge-A, finishing work of electrical substation at main entry
side and second entry side, Magistrate building, Government Railway
Police and Railway Protection Force buildings have been taken up.
Rampur Junction station: The works of new station building, platform
shelter, platform surfacing, booking office, waiting hall and toilethave been completed. The works of circulating area and Foot Over
Bridge have been taken up.
Shahjahanpur station: The works of platform shelter and platform
surfacing at platform no. 1 and 2/3 have been completed. The works
of improvement of station building, new station building at second
entry, circulating area and Foot Over Bridge have been taken up.
Shikohabad Junction station: The works of new station building,
platform surfacing of platform no. 1/2, improvement of circulating
area, parking and Divyangjan facilities have been completed. The
work of 12 m Foot Over Bridge has been taken up.
Amrit Bharat Station Scheme involves preparation of master plans and
their implementation in phases to improve the stations. The master
planning includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement, water
booths
Provision of wider foot over bridge/air concourse commensurate
with passenger traffic
Provision of lift/escalators/ramp
Improvement /Provision of platform surface and cover over
platforms
Provision of kiosks for local products through schemes like ‘One
Station One Product’
Parking areas, Multimodal integration
Amenities for Divyangjans
Better passenger information systems Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity at each
station
The scheme also envisages sustainable and environment friendly
solutions, provision of ballastless tracks etc. as per necessity, phasing
and feasibility and creation of city centre at the station in the long term.
Amenities for passengers are provided as per laid down norms
depending on category of the station, number of passengers being
handled at the stations and the specific requirements of the station. The
amenities have been generally well provided across stations on Indian
Railways including those falling in Uttar Pradesh. The provision of high
level platforms and Foot Over Bridges is envisaged to be completed in a
phased manner.
Indian Railways is committed to make its railway stations accessible for
Persons with Disabilities (Divyangjans) and passengers with reduced
mobility as part of “Sugamya Bharat Mission” or ‘Accessible India
Campaign’ of Government of India. In compliance of the Rights of
Persons with Disabilities Act, 2016, “Guidelines on accessibility of Indian
Railway stations and facilities at stations for differently abled persons
(Divyangjans) and passengers with reduced mobility” have been
circulated and notified in the Gazette of India. The guidelines include
provisions of facilities for Divyangjans and passengers with reduced
mobility such as entrance ramps, accessible parking, low height ticket
counters/help booths, toilets, drinking water booths, subways/Foot Over
Bridges with ramps/lifts, standard signages including Braille signages
and tactile pathways for visual impairment, etc. which are being
provided in a phased manner and on the principles of reasonable
accommodation.Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways including provision of passenger amenities
like waiting room, drinking water arrangement, lighting etc. is a
continuous and ongoing process and works in this regard are undertaken
as per requirement, subject to inter-se priority and availability of funds.
Development / redevelopment / upgradation / modernisation of a station
is carried out based on category of station/condition/traffic handled etc.
Development / Upgradation of railway stations is complex in nature
involving safety of passengers & trains and requires various statutory
clearances such as fire clearance, heritage, tree cutting, airport
clearance etc. The progress also gets affected due to brownfield related
challenges such as shifting of utilities (involving water/sewage lines,
optical fibre cables, gas pipe lines, power/signal cables, etc.),
infringements, operation of trains without hindering passenger
movement, speed restrictions due to works carried out in close
proximity of tracks and high voltage power lines, etc. and these factors
affect the completion time.
Development / upgradation / modernisation of stations including under
Amrit Bharat Station Scheme is generally funded under Plan Head-53
‘Customer Amenities’. The details of allocation and expenditure under
Plan Head-53 are maintained Zonal Railway-wise and not work-wise, or
station-wise, or constituency wise or state-wise. Uttar Pradesh is
covered under the jurisdiction of five railway zones, namely East Central
Railway, Northern Railway, North Central Railway, North Eastern
Railway and West Central Railway. For these zones, an allocation of ₹
3,794 crore has been made for the financial year 2025-26, out of which
an expenditure (up to February, 2026) of ₹ 3,694 crore has been incurred
so far.Safety:
Safety is accorded the highest priority on Indian Railways. As a
consequence of various safety measures taken over the years, there has
been a steep decline in the number of accidents.
Number of Consequential Train Accidents has reduced as shown in the
table below:-
Year Consequential Accidents
2014-15 135
2025-26 (upto 28.02.2026) 14 (90% lesser)
Another important index showing improvement in safety in train
operations is Consequential Accident Index, the details of which are as
under:-
Consequential Accident Index:-
Year Accident Index
2014-15 0.11
2024-25 0.03 (73% lesser)
This index measures number of consequential accidents as a ratio of
total running kilometers of all trains.
No. of consequential accidents
Accident Index =
No. of trains X million kilometers
run234
s
t
n
e
d
i
c
c
A
165
n
i
a
r
T
l 135
a
it
n
e
u
q
e
s
n
o
C 55
f
o
. o 31
N
14
2005-06 2009-10 2014-15 2019-20 2024-25 2025-26
(Feb 2026)
The various safety measurestaken to enhance safety in train operations
are as under:-
1. On Indian Railways, the expenditure on Safety related activities
has increased over the years as under:-
Expenditure/Budget on Safety related activities (Rs. in Cr.)
2013-14 2022-23 2023-24 2024-25 2025-26 2026-27
39,200 87,336 1,01,662 1,14,022 1,17,693 1,20,389
2. Electrical/Electronic Interlocking Systems with centralized
operation of points and signals have been provided at 6,665
stations up to 28.02.2026 to reduce accidents due to human failure.
3. Interlocking of Level Crossing (LC) Gates has been provided at
10,153 Level Crossing Gates up to 28.02.2026 for enhancing safety
at LC Gates.4. Complete Track Circuiting of stations to enhance safety by
verification of track occupancy by electrical means has been
provided at 6,669 stations up to 28.02.2026.
5. Indian Railways has gone for implementation of indigenously
developed Automatic Train Protection (ATP) system, which required
safety certification of highest order (SIL 4). Kavach has been
adopted as a National ATP system in July 2020. Based on
deployment of Kavach version 3.2 on 1465 RKm on South Central
Railway and experience gained, further improvements were made.
Finally, Kavach specification version 4.0 was approved by RDSO on
16.07.2024.After extensive and elaborate trials, Kavach Version 4.0
has been successfully commissioned on 1,452 Route Kilometres,
covering the high density Delhi- Mumbai and Delhi-Howrah routes
as below:
SN Section Progress Route
(Km)
(1) Delhi-Mumbai route:
i Junction cabin – Palwal – Mathura –Nagda 667
section
ii Vadodara - Ahmedabad section 96
iii Vadodara - Virar section 336
(2) Delhi – Howrah route:
i Gaya Sarmatanr section 93
ii Chota Ambana - Bardhaman – Howrah 260
section
Further, track side Kavach implementation work has been taken up
on 24,427 RKM covering all GQ, GD, HDN and identified sections of
Indian Railways.6. Detailed instructions on issues related with safety of Signalling,
e.g. mandatory correspondence check, alteration work protocol,
preparation of completion drawing, etc. have been issued.
7. System of disconnection and reconnection for S&T equipment as
per protocol has been re-emphasized.
8. All locomotives are equipped with Vigilance Control Devices (VCD)
to improve alertness of Loco Pilots.
9. Retro-reflective sigma boards are provided on the mast which is
located two OHE masts prior to the signals in electrified territories
to alert the crew about the signal ahead when visibility is low due
to foggy weather.
10. A GPS based Fog Safety Device (FSD) is provided to loco pilots in
fog affected areas which enables loco pilots to know the distance
of the approaching landmarks like signals, level crossing gates,
etc.
11. Modern track structure consisting of 60kg, 90 Ultimate Tensile
Strength (UTS) rails, Prestressed Concrete Sleeper (PSC)
Normal/Wide base sleepers with elastic fastening, fan shaped
layout turnout on PSC sleepers, Steel Channel/H-beam Sleepers on
girder bridges is used while carrying out primary track renewals.
12. Mechanisation of track laying activity through use of track
machines like PQRS, TRT, T-28 etc. to reduce human errors.
13. Maximizing supply of 130m/260m long rail panels for increasing
progress of rail renewal and avoiding welding of joints, thereby
improving safety.
14. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws
and timely removal of defective rails.15. Laying of longer rails, minimizing the use of Alumino Thermic
Welding and adoption of better welding technology for rails i.e.,
Flash Butt Welding.
16. Monitoring of track geometry by OMS (Oscillation Monitoring
System) and TRC (Track Recording Cars).
17. Patrolling of railway tracks to look out for weld/rail fractures.
18. The use of Thick Web Switches and Weldable CMS Crossing in
turnout renewal works.
19. Inspections at regular intervals are carried out to monitor and
educate staff for observance of safe practices.
20. Web based online monitoring system of track assets viz. Track
database and decision support system has been adopted to decide
rationalized maintenance requirement and optimize inputs.
21. Detailed instructions on issues related with safety of Track, e.g.
integrated block, corridor block, worksite safety, monsoon
precautions, etc. have been issued.
22. Preventive maintenance of railway assets (Coaches & Wagons) is
undertaken to ensure safe train operations.
23. Replacement of conventional ICF design coaches with LHB design
coaches is being done.
24. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route
have been eliminated by January 2019.
25. Safety of Railway Bridges is ensured through regular inspection of
Bridges. The requirement of repair/rehabilitation of Bridges is
taken up based upon the conditions assessed during these
inspections.
26. Indian Railways has displayed Statutory “Fire Notices” for
widespread passenger information in all coaches. Fire posters are
provided in every coach so as to educate and alert passengersregarding various Do’s and Don’ts to prevent fire. These include
messages regarding not carrying any inflammable material,
explosives, prohibition of smoking inside the coaches, penalties
etc.
27. Production Units are providing Fire detection and suppression
system in newly manufactured Power Cars and Pantry Cars, Fire
and Smoke detection system in newly manufactured coaches.
Progressive fitment of the same in existing coaches is also
underway by Zonal Railways in a phased manner.
28. Regular counselling and training of staff is undertaken.
29. Concept of Rolling Block introduced in Indian Railways (Open
Lines) General Rules vide Gazette notification dated 30.11.2023,
wherein work of integrated maintenance/ repair/replacement of
assets is planned up to 52 weeks in advance on rolling basis and
executed as per plan.
The details of the Safety related works related to better maintenance
practices, Technological improvements, better infrastructure and rolling
stock etc. undertaken by Railways are tabulated below:-
2004-05 to 2014-15 to 2014-25 Vs.
S.N. Item
2013-14 2024-25 2004-14
Technological Improvements
1. Use of high-quality 57,450 Km 1.43 Lakh Km More than
rails 2 times
(60 Kg) (Km)
2. Longer Rail Panels 9,917 Km 77,522 Km Nearly
(260m) (Km) 8 times
3. Electronic 837 Stations 3,691 Stations More than
Interlocking 4 times(Stations)
4. Fog Pass Safety As on As on 288 times
Devices (Nos.) 31.03.14: 31.03.25:
90 Nos. 25,939 Nos.
5. Thick Web Switches Nil 28,301 Nos.
(Nos.)
Better Maintenance Practices
1. Primary Rail Renewal 32,260 Km 49,941 Km 1.5 times
(Track Km)
2. USFD (Ultra Sonic 79.43 Lakh 2 Crore More than
Flaw detection) 2 times
Testing of Welds
(Nos.)
3. Weld failures (Nos.) In 2013-14: In 2024-25: 90%
3699 Nos. 370 Nos. reduction
4. Rail fractures (Nos.) In 2013-14: In 2024-25: More than
2548 Nos. 289 Nos. 88%
reduction
Better Infrastructure and Rolling Stock
1. New Track KM added 14,985 Km 34,428 Km More than
(Track Km) 2 times
2. Flyovers 4,148 Nos. 13,808 Nos. More than
(RoBs)/Underpasses 3 times
(RUBs) (Nos.)
3. Unmanned Level As on As on Removed
crossings 31.03.14: 31.03.24:Nil
(Nos.) on BG 8,948 (All eliminated
by 31.01.19)4. Manufacture of LHB 2,337 Nos. 42,677 More than
Coaches (Nos.) 18 times
Security:
The following steps are taken by the Railways in coordination with
GRP/Local Police and other stakeholders for safety and security of
peoples in trains and at stations:-
1. On vulnerable and identified routes/sections, trains are escorted by
Railway Protection Force in addition to trains escorted by
Government Railway Police of different States daily.
2. For immediate assistance passengers can make complaint on Rail
Madad Portal directly or through Helpline Number 139 [integrated
with Emergency Response Support System (ERSS) No.112].
3. Railways are in regular touch with passengers through various
social media platforms like twitter& facebooketc. to enhance
security of passengers and to address their security concern.
4. Surveillance is kept through CCTV cameras provided in number of
coaches and at railway stations.
5. Frequent announcements are made through Public Address System
to educate passengers to take precautions against theft,
snatching, drugging etc.
6. Under ‘Meri Saheli’ initiative, focused attention has been provided
for safety and security of lady passengers travelling alone by long
distance trains for their entire journey i.e. from originating station
to destination station.
7. State Level Security Committee of Railways (SLSCR) have been
constituted for all State/Union Territories under the Chairmanship
of respective Director General of Police/Commissioner ofStates/Union Territories for regular monitoring and review of
security arrangements of the Railways.
Safety in Coaches:
The inherent design of rolling stock is done duly considering various
safety provisions and passenger amenities etc in the coach. Further,
modification and upgradation of coaches to enhance safety and
amenities is a continuous and ongoing process on lndian Railways (lR).
Following measures have been taken with regard to improving safety in
coaches:
1. Provision of Minimum two Fire Extinguishers in all coaches over
Indian Railways.
2. Fire Detection & Suppression System has been provided in fire prone
areas of Power cars and Pantry cars.
3. Fire and smoke Detection system has been provided in coaches as
per extant guidelines.
4. Water mist type fire suppression system is being provided on pantry
cars and power cars in phased manner.
5. Provision of emergency windows in coaches for evacuation in case
of fire.
6. Use of Fire-retardant material as per global fire-retardant norms in
coaches for seats/berths, panels, flooring, insulation, toilets etc for
improved fire safety.
7. Use of fire retardant E-beam cable in coaches.
8. Use of different level of protection in the form of fuses, Miniature
Circuit breaker (MCBs) and Motor protection Circuit Breakers
(MPCBs) in the electrical circuits to prevent the damage from
electrical faults/surges.9. Provision of Aerosol based fire suppression system in electrical
cabinets.
10. Further, up-gradation of material in line with global standards is
regularly being carried out with fitment of new generation material
in Amrit Bharat & Vande Bharat Sleeper trains.
11. Display of "Fire Notices" for widespread information in all coaches
to inform and alert passengers regarding various “Do’s” and “Don’ts”
to prevent fire. These include messages regarding not to carry any
inflammable material, explosives, prohibition of smoking inside the
coaches and penalties etc.
12. Prohibition of flame based cooking in coaches.
Regular upkeep of various safety equipment/components as per the
prescribed periodicity is carried out by the designated officials at
Depots/Sheds for ensuring their proper functionality.
*****