GOVERNMENT OF INDIA
MINISTRY OF TOURISM
RAJYA SABHA
STARRED QUESTION NO.218
ANSWERED ON 12.03.2026
PILGRIM DESTINATIONS UNDER PRASHAD SCHEME IN J&K
218 SHRI SAT PAUL SHARMA:
Will the Minister of TOURISM be pleased to state:
(a) the pilgrimage destinations in Jammu & Kashmir supported under the PRASHAD scheme
during the last year;
(b) whether carrying capacity and crowd-flow studies were conducted at those sites;
(c) if so, the details thereof;
(d) how safety, sanitation and accessibility gaps were addressed at those sites;
(e) whether coordination with the Union Territory administration and shrine/temple authorities
has improved operations;
(f) if so, the details thereof; and
(g) the outcomes observed during peak pilgrimage seasons in the Union Territory?
ANSWER
THE MINISTER OF TOURISM (SHRI GAJENDRA SINGH SHEKHAWAT)
(a) to (g): A Statement is laid on the Table of the House.
********STATEMENT IN REPLY TO PARTS (a) TO (g) OF RAJYA SABHA STARRED QUESTION
NO.218 ANSWERED ON 12.03.2026 REGARDING PILGRIM DESTINATIONS UNDER
PRASHAD SCHEME IN J&K RAISED BY SHRI SAT PAUL SHARMA
(a): Ministry of Tourism under the “Pilgrimage Rejuvenation and Spiritual, Heritage
Augmentation Drive” (PRASHAD) provides financial assistance to the State Governments (SGs)
and Union Territory Administrations (UTAs) for development of tourism infrastructure at identified
religious and heritage sites across the country including Jammu & Kashmir. The Ministry of
Tourism has sanctioned a project namely ‘Development at Hazratbal’ in the year 2016-17 at a cost
of ₹40.46 crore in Jammu & Kashmir under PRASHAD Scheme, which stands completed.
However, no project has been sanctioned in Jammu & Kashmir during the last year.
(b) to (c): Carrying capacity and crowd-flow parameters form an integral part of project
planning under the PRASHAD Scheme. As per the scheme guidelines, selection of pilgrimage
destinations takes into account the carrying capacity of a destination to manage pilgrim inflows.
(d): To address gaps of safety, sanitation and accessibility, key interventions have been sanctioned
under the said project which includes site development (boundary walls, landscaping, illumination
of shrine precincts), approach road, public convenience block and entrance gateway, tensile
structure for shading, aerators for rejuvenation of dal lake, construction of prefabricated shopping
kiosks, cast iron fencing of lake shore from naseem bagh till hazratbal, signage, illumination, multi-
storied parking etc.
(e) to (f): In accordance with the Scheme Guidelines respective State Government /UT
administration formulates comprehensive Detailed Project Report (DPR) for projects in
consultations with the respective administration, local bodies and other stakeholders. The projects
sanctioned under the said scheme are implemented by the State/UT Government concerned. The
funding pattern under the Scheme outlines that the 5th installment of the project i.e., 5% of the
project cost is released after successful operation and maintenance. Further, the infrastructure so
created are handed over to the respective temple shrine/religious trusts through the concerned State
Government/ UT administration.
(g): The vital facilities created under the PRASHAD Scheme such as pathways, lighting, drinking
water, toilets and access arrangements at the sites help local authorities in managing the movement
of pilgrims and in providing essential services during periods of high footfall.
******