See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 5455
TO BE ANSWERED ON 25.03.2026
POTABLE WATER FACILITIES AT RAILWAY STATIONS IN RAJASTHAN
†5455. SHRI MURARI LAL MEENA:
Will the Minister of RAILWAYS be pleased to state:
(a) whether it is a fact that potable water facilities for passengers are not
available at several railway stations in Rajasthan particularly in Dausa
and if so, the details thereof;
(b) whether regular testing of water quality is conducted at railway
stations where drinking water facilities are available;
(c) if so, the details of reports of water quality tests conducted in
Rajasthan particularly at Dausa station during the last three years,
year-wise;
(d) whether the Government has received complaints that water available
at certain stations is not fit for consumption or water purification plants
are non-functional and if so, the action taken in this regard; and
(e) whether the Government is going to implement any specific action plan
to ensure time- bound arrangements for RO-based safe drinking water,
water coolers and regular maintenance at all major and sub-divisional
stations including Dausa in Rajasthan and if so, the details thereof?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (e) At Dausa station, located in Rajasthan, facilities like high level
platforms, platform shelter, waiting hall, drinking water arrangement,
urinal, lavatory, seating arrangement and Foot Over Bridge etc. are
available.
§ Page 1 of 6Dausa station has been identified for development under Amrit Bharat
Station Scheme. Development works at Dausa station have been taken up
at good pace. The works of improvement of station building, platform
shelter, improvement of waiting hall, toilet, circulating area and 12 m Foot
Over Bridge have been completed. The work of lift has been taken up.
Ministry of Railways is committed to provide safe and potable drinking
water facilities free of cost at all stations over Indian Railways including
Dausa station, located in Rajasthan, as one of the minimum essential
amenities.
Further, Indian Railways ensure ample water supply at railway stations by
assessing expected consumption, making alternative arrangements for
shortfalls and collaboration with municipalities, local water tanker
suppliers, and other sources as needed.
To ensure the quality of drinking water being made available at the railway
stations, instructions exist for periodical checking and required corrective
action to be taken. Regular inspection and maintenance of drinking water
facilities is carried out and complaints are attended promptly.
Indian Railways has a well established mechanism to monitor
implementation of projects including their reviews, inspection, check for
quality of works and audits. Works are carried out adhering to the
standards and specifications laid down in various codes and manuals.
Inspections/audits/checks are carried out from time to time by various
agencies/officials/multi-disciplinary teams as per laid down instructions
and actions for correction including damages are taken immediately. This
is a continuous and ongoing process.
Further, development / redevelopment / upgradation / modernisation of
stations including provision of drinking water arrangement at stations on
Indian Railways is a continuous and ongoing process and works in this
regard are undertaken as per requirement, subject to inter-se priority and
availability of funds. Development / redevelopment / upgradation /
modernisation of a station is carried out based on category of
station/condition/traffic handled etc.
Page 2 of 6Water coolers at railway stations are provided as per extant policy
guidelines. At present, 06 water coolers are available at Dausa station.
Regular maintenance of water coolers at all major and sub-divisional
stations is being done in Rajasthan.
‘RailMadad’ is Indian Railways grievance redressal mechanism that
provides passengers an integrated platform for grievances, assistance and
inquiry. In RailMadad, passengers can seek redressal through multiple
channels such as Helpline number-139, RailMadad Web App and SMS.
RailMadad also allows passengers to share feedback on the resolution of
their grievances.
Grievances related to water availability in train coaches and at stations are
received in RailMadad. However, no separate data regarding water is not fit
for consumption/water purification plants are non functional at stations is
maintained in RailMadad.
Apart from that, representations, both formal and informal for Railway
projects / works across the country are received on the basis of demands
raised by State Governments, Members of Parliament, Ministries of Central
Government, elected representatives, Railways' own requirements,
organizations / rail users etc., at various levels including Railway Board,
Zonal Railways, Division Office etc. Receipt of such proposals / requests /
suggestions / representations is a continuous and dynamic process and
these are examined and action as found feasible and justified is taken from
time to time.
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their implementation
in phases to improve the stations. The master planning includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement, water
booths
Page 3 of 6 Provision of wider foot over bridge/air concourse commensurate with
passenger traffic
Provision of lift/escalators/ramp
Improvement /Provision of platform surface and cover over platforms
Provision of kiosks for local products through schemes like ‘One
Station One Product’
Parking areas, Multimodal integration
Amenities for Divyangjans
Better passenger information systems
Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity at each
station.
The scheme also envisages sustainable and environment friendly solutions,
provision of ballastless tracks etc. as per necessity, phasing and feasibility
and creation of city centre at the station in the long term.
So far, 1,338 stations have been identified for development under the Amrit
Bharat Station Scheme. Out of these, 85 stations including Dausa station
are located in Rajasthan. The name of stations identified under Amrit
Bharat Station Scheme in Rajasthan are as following:
No. of
State Name of Stations
Stations
Rajasthan 85 Abu Road, Ajmer, Alwar, Anupgarh, Asalpur
Jobner, Balotra, Bandikui, Baran, Barmer,
Bayana, Beawar, Bharatpur, Bhawani Mandi,
Bhilwara, Bijainagar, Bikaner, Bundi, Chanderiya,
Chhabra Gugor, Chittorgarh Jn., Churu, Dakaniya
Talav, Dausa, Deeg, Degana, Deshnoke, Dholpur,
Didwana, Dungarpur, Falna, Fatehnagar, Fatehpur
Shekhawati, Gandhinagar Jaipur, Gangapur City,
Gogameri, Gotan, Govind Garh, Hanumangarh,
Hindaun City, Jaipur Jn, Jaisalmer, Jalor, Jawai
Bandh, Jhalawar City, Jhunjhunu, Jodhpur,
Kapasan, Khairthal, Kherli, Kota Jn, Lalgarh Jn,
Mandal Garh, Mandawar Mahwa Road, Marwar
Bhinmal, Marwar Jn, Mavli Jn, Merta Road Jn,
Page 4 of 6No. of
State Name of Stations
Stations
Nagaur, Naraina, Nim ka Thana, Nokha, Pali
Marwar, Phalodi Jn, Phulera Jn, Pindwara, Rai
singh nagar, Rajgarh, Ramdevra, Ramganj Mandi
Jn, Ranapratapnagar, Rani, Ratangarh Jn, Ren,
Ringas, Sadulpur, Sanganer, Sawai Madhopur,
Shri Mahaveerji, Sikar, Sojat Road, Somesar, Sri
ganganagar, Sujangarh, Suratgarh, Udaipur City
Completed stations:
Development works at railway stations under Amrit Bharat Station Scheme
in Rajasthan have been taken up at a good pace. Till now, works of 12
stations have been completed. The name of stations completed in
Rajasthan are as following:
No. of
State Name of stations
stations
Rajasthan 12 Barmer, Bundi, Deshnoke, Fatehpur Shekhawati,
Gangapur City, Gogameri, GovindGarh,
Jaisalmer, Khairthal, Mandal Garh,
MandawarMahwa Road, Rajgarh
The activities for development at other stations have also been taken up at
good pace and progress of some of the stations is as given below:
Churu station: The works of new station building, concourse,
improvement of platform shelter at platform no. 1 & 2, booking office,
waiting room, retiring room, toilet, entry/exit gate, coach indication
board and signages have been completed. The works of lift and 12 m
Foot Over Bridge have been taken up.
Gotan station: The works of improvement of station building, porch,
platform shelter, waiting room, toilet, circulating area, parking,
entry/exit gate, coach indication board and signages have been
completed. The works of lift and 12 m Foot Over Bridge have been
taken up.
Page 5 of 6 Lalgarh station: The works of improvement of station building,
concourse, platform shelter, waiting room, toilet, circulating area,
parking, coach indication board and signages have been completed.
The works of 12 m Foot Over Bridge have been taken up.
Sujangarh station: The works of new station building, porch,
improvement of existing station building, raising of platform no. 1,
platform shelter, improvement of waiting room, retiring room, toilet,
parking, coach indication board and entry/exit gate have been
completed. The works of improvement of station building, circulating
area, signages and 12 m Foot Over Bridge have been taken up.
Jalor station: The works of station building, porch, toilet, entry/exit
gate and boundary wall have been completed. The works of
circulating area and Foot Over Bridge have been taken up.
Development / Upgradation / Modernization of stations including Amrit
Bharat Station Scheme is generally funded under Plan Head-53 ‘Customer
Amenities’. The details of allocation and expenditure under Plan Head-53
are maintained Zonal Railway-wise and not work-wise or station-wise or
state-wise. Rajasthan is covered under the jurisdiction of five railway
zones, namely, Northern Railway, North Central Railway, North Western
Railway, Western Railway and West Central Railway. For these zones, an
allocation (Revised Estimate) of ₹ 4,797 crore has been made for the
financial year 2025-26, out of which an expenditure of ₹ 4,761 crore (up to
February, 2026) has been incurred so far.
*****
Page 6 of 6