GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
STARRED QUESTION NO. 273
TO BE ANSWERED ON 11.03.2026
PROGRESS OF AMRIT BHARAT STATION SCHEME
*273. SHRI LUMBARAM CHOUDHARY:
SHRI SATISH KUMAR GAUTAM:
Will the Minister of RAILWAYS be pleased to state:
(a) the current progress of the Amrit Bharat Station Scheme, including the
number of stations under redevelopment, ongoing works and projects
completed so far specially in Jalore and Sirohi Lok Sabha
Constituencies, Chhattisgarh, Karnataka, Palghar district of
Maharashtra, Himatnagar station in Sabarkantha Gujarat, Himachal
Pradesh, under Ambala Division and Jammu Division of Northern
Railway, Chhattisgarh particularly Surguja district, Jharkhand;
(b) the progress achieved under the Amrit Bharat Station scheme in
Rajasthan particularly in the Pali Lok Sabha Constituency;
(c) the details of the multimodal integration and tourism circuits developed;
(d) whether the Government has assessed the impact of the Amrit Bharat
station Scheme on passenger satisfaction in the country including
Karnataka and if so, the findings thereof;
(e) whether the stations under the scheme have been developing within the
targeted timeline and if so, the details thereof;
§(f) the details of stations covered in Maharashtra including Jalgaon Lok
Sabha Constituency along with project cost, completion timelines and
funding status; and
(g) whether the Government is constructing ROBs and RUBs under the said
scheme particularly at Kirari, Ghewra, Narela, Siraspur, Khera Kalan,
Tikri Kalan, Holambi Kalan, Bhorgarh and the ROB from Badli Station to
Rohini Sector-18 Metro Station and if so, the details thereof?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (g): A Statement is laid on the Table of the House.
*****STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (g) OFSTARRED
QUESTION NO.273 TO BE ANSWERED ON 11.03.2026 IN LOK SABHA
(a) to (g) Ministry of Railways has launched Amrit Bharat Station Scheme
for redevelopment of stations with a long-term approach. So far, 1,337
stations have been identified for development under the Amrit Bharat
Station Scheme. Development works at railway stations under Amrit Bharat
Station Scheme have been taken up at a good pace. Till now, works have
been completed at 180 stations. Names of stations completed so far are as
following:
Alnavar, Amb Andaura, Ambikapur, Amgaon, Anandpur Sahib, Anara,
Angamali For Kaladi, Ayodhya Dham, Badami, Bagalkot, Baijnath Paprola,
Balrampur, Bantawala, Barabhum, Baramati, Bareilly City, Baripada,
Barmer, Barpali, Begumpet, Beohari, Bhanupratappur, Bhilai, Bhind, Bijnor,
Bimalgarh, Bommidi, Bundi, Chanda Fort, Chalakudi, Changanassery,
Chennai Park,Chhindwara, Chidambaram, Chinchpokli, Chinna Salem,
Chirayinkeezh, Cuttack, Dakor, Derol, Deshnoke, Devlali, Dharwad, Dhule,
Dongargarh, Fatehabad, Fatehpur, Fatehpur Shekhawati, Ferok, Gadag,
Gangapur City, Godda, Godhra Jn., Gogameri, Gokak Road, Gola Gokarnath,
Gomti Nagar, Govardhan, Govind Garh, Govindpuri, Govindpur Road,
Hafizpeta, Haibargaon, Haldia, Hapa, Harpalpur, Hathras City, Hodal, Idgah
Agra Jn., Izzatnagar, Jaisalmer, Jam Jodhpur, Jam Wanthali, Joychandi
Pahar,Junnor Deo, Kakinada Town, Kalyani Ghoshpara, Kamakhyaguri,
Kanalus Jn., Karaikkudi Jn., Karamsad, Karimnagar, Katni South, Kedgaon,
Khairthal, Khambhaliya, Khalilabad, Koppal, Kosamba Jn., Kulitturai,
Kuttipuram, Lasalgaon, Limbdi, Lohardaga, Lonand Jn., Mahe, Mahuva,
Mailani, Mandal Garh, MandawarMahwa Road, Madhupur, Mambalam,
Manaparai, Mandi Dabwali, Mangalagiri, Mannargudi, Matunga, M.C.S.Chhatarpur, Mithapur, Morappur, Morbi, Muktsar, Munirabad, Muri Jn.,
Murtizapur Jn., Nainpur Jn., Nandura, Narmadapuram (Hoshangabad),
Netaji Subhash Chandra Bose Itwari Junction, Nidadavolu Jn., Nilambur
Road, Okha, Orchha, Palitana, Panagarh, Panki Dham, Parel,
Parlakhemundi, Pirpainti, Piska, Pokhrayan, Pollachi Jn., Polur, Porbandar,
Rajgarh, Rajmahal, Rajula Jn., Ramagundam, Ramghat Halt, Rayanpadu,
Saharanpur Jn., Sahibzada Ajit Singh Mohali, Sahebgunj, Samakhiyali,
Samalpatti, Sanchi, Sankarpur, Savda, Seoni, Shahad, Shajapur,
Sholavandan, Shoranur Jn., Shridham, Siddharth Nagar, Sihor Jn., Siuri, Sri
Bala Brahmeswara Jogulamba, Srirangam, Srivilliputtur, St.Thomas Mount,
Sullurpeta, Suraimanpur, Swaminarayan Chappia, Talcher, Tamluk, Thawe,
Thiruvarur Jn., Tiruvannamalai, Tripunithura, Tuni, Ujhani, Urkura, Utran,
Vadakara, Vadala Road, Vidisha,Vriddhachalam Jn., Wadakancheri,
Warangal.
The activities for development at other stations have also been taken up at
good pace and progress of some of the stations is as given below:
Jalore Lok Sabha Constituency:
Jalor station: The works of station building, porch, toilet, entry/exit
gate and boundary wall have been completed. The works of
circulating area and Foot Over Bridge have been taken up.
Marwar Bhinmal station: The works of station building, porch,
platform surfacing and platform shelter at platform no. 1, toilet,
entry/exit gate and boundary wall have been completed. The works of
circulating area and Foot Over Bridge have been taken up. Pindwara station: The works of station building and platform shelter
have been completed. The works of circulating area and 12 m Foot
Over Bridge have been taken up.
Chhattisgarh:
Bhilai Power House station: The works of new second entry station
building, improvement of main entry station building, platform
upgradation, improvement of waiting areas, development of
circulating area, parking, lifts, escalators and 12 m Foot Over Bridge
have been completed. The finishing works of station building and
improvement of illumination on platforms have been taken up.
Dallirajhara station: The works of improvement of station building,
waiting areas, toilet, platform upgradation and Public Address System
have been completed. The works of improvement of circulating area,
landscaping, art & culture works, signage and improvement of
illumination on platforms have been taken up.
Raipur Junction station: The works of utility shifting and relocation at
second entry side have been completed. The structural works of
second entry station building, multi level parking facility on both main
and second entry side, service buildings and development of
circulating area at second entry side have been taken up.
Sarona station: The works of new second entry station building,
improvement of main entry station building, platform upgradation,
improvement of waiting areas, development of circulating area,
parking, Public Address System, lifts, escalators and 12 m Foot Over
Bridge have been completed. The finishing works of station building,landscaping, art & culture and improvement of illumination on
platforms have been taken up.
Delhi:
Narela station: The works of platform shelter, platform surfacing,
modern toilet, circulating area, parking and Divyangjan facilities have
been taken up.
Subzi Mandi station: The works of new station building, platform
shelter, platform surfacing, modern toilet, circulating area, parking,
Divyangjan facilities, lift and 12 m Foot Over Bridge have been taken
up.
Tilak Bridge station: The works of new station building, platform
shelter, platform surfacing, modern toilet, circulating area, parking,
Divyangjan facilities and lift have been taken up.
Karnataka:
Bangalore Cantonment station: The works of diversion road on South
side, training centre, hostel on North side and electric substation
building have been completed. The works of South side station
building, North side station building, circulating area and Foot Over
Bridge have been taken up.
Chamaraja Nagar station: The works of improvement of station
building, entrance porch, platform shelter, platform surfacing, waiting
hall, booking counter, circulating area and parking have beencompleted. The works of lift, escalator and 12 m Foot Over Bridge
have been taken up.
Ghataprabha station: The works of platform surfacing, platform
shelter, circulating area, lift, escalator and 12 m Foot Over Bridge
have been taken up.
Hosapete station: The works of improvement of station building,
platform shelter, improvement of waiting hall and coach indication
board at platform no. 1 have been completed. The works of platform
surfacing, coach indication board at platform no. 2/3, lift, escalator
and 12 m Foot Over Bridge have been taken up.
Ranibennur station: The works of improvement of station building,
entrance porch, platform shelter, platform surfacing, waiting hall,
toilet, circulating area, parking and entry arch have been completed.
The works of lift, escalator and 12 m Foot Over Bridge have been
taken up.
Maharashtra including Palghar district:
Palghar station: The works of new platform shelter at platform no. 2/3,
platform surfacing, new coping blocks and tactile tile work at
platform no. 4 have been completed. The works of utility shifting and
12 m Foot Over Bridge have been taken up.
Diva station: The works of improvement of station building,
circulating area and parking on East side, new entry gate, platform
raising and flooring of platform no. 5/6 and 7/8, platform shelter at
platform no. 7/8, new toilet block, sewage treatment plant on Westside, improvement of Foot Over Bridge at Kalyan end and Mumbai end
have been completed. The work of new 6 m Foot Over Bridge has
been taken up.
Mumbra station: The works for improvement of platform surface,
seating arrangement, new toilet block, improvement of booking
office, circulating area, sewage treatment plant and flooring of Foot
Over Bridge have been completed. The work of escalator has been
taken up.
Titwala station: The works for station building, entrance gate,
platform surfacing, improvement of ticket booking office, toilet block,
sewage treatment plant, improvement of two wheeler parking and
approach road on East and West side have been completed. The work
of new 6 m Foot Over Bridge has been taken up.
Vikhroli station: The works for improvement of station building on
West side, platform surfacing, platform shelter, new toilet block at
Mumbai end, improvement of toilet block at Kalyan end and Foot Over
Bridge have been completed. The works of new booking office,
circulating area on East and West side and parking of East side have
been taken up.
Igatpuri station: The structural work new station building,
improvement of existing station building, entrance gate, booking
office, toilet block, platform surfacing, platform shelter, circulating
area and sewage treatment plant have been completed. The finishing
work of new station building has been taken up.Gujarat including Sabarkantha district:
Himmatnagar station: The works of new station building,
improvement of existing station building, water booth, toilet,
circulating area, parking and 12 m Foot Over Bridge have been taken
up.
Dahod station: The works of improvement of station building, porch,
platform surfacing of platform no. 1, improvement of booking counter,
waiting hall, waiting room, pay and use toilet, circulating area,
entry/exit gate and signages have been completed. The work of 12 m
Foot Over Bridge has been taken up.
Limkheda station: The works of new station building, raising of
platform no. 1 & 2, improvement of platform surface, toilet at platform
no. 1 & 2/3, improvement of circulating area and entry/exit gate have
been completed. The works of signages and 6 m Foot Over Bridge
have been taken up.
Asarva station: The works of new station building, porch, new waiting
room, booking counter and toilet block have been completed. The
works of new platform shelter, platform surfacing, circulating area,
parking, Divyangjan facilities and finishing work of concourse area
have been taken up.
Sehore station: The works of platform surface, platform shelter,
waiting hall, toilet, circulating area, approach, signage and station
illumination have been completed. The work of 12 m Foot Over Bridge
has been taken up.Himachal Pradesh:
Development works at Amb Andaura and Baijnath Paprola stations have
been completed. Palampur Himachal and Shimla stations are under master
planning.
Master Planning is an iterative process requiring optimization and the time
frame and other details for such optimization cannot be indicated at this
stage.
Ambala division of Northern Railway:
Ambala City station: The works of improvement of station building,
entrance porch, platform surface, AC waiting room, improvement of
second class waiting room, toilet, circulating area, parking, entry/exit
gate and signage have been completed. The works of lift and 12 m
Foot Over Bridge have been taken up.
Kalka station: The works of improvement of station building, entrance
porch, improvement of waiting room, retiring room, circulating area,
parking, entry/exit gate and signage have been completed. The works
of platform surfacing, lift and 12 m Foot Over Bridge have been taken
up.
Yamunanagar Jagadhari station: The works of improvement of station
building, waiting room, toilet, circulating area, parking, entry/exit gate
and signage have been completed. The works of platform surfacing,
development of second entry, lift and 12 m Foot Over Bridge have
been taken up. Patiala station: The works of improvement of station building,
entrance porch, platform shelter, improvement of waiting hall, retiring
room, toilet, circulating area, parking, entry/exit gate and signage
have been completed. The works of platform surfacing, development
of second entry, lift and 12 m Foot Over Bridge have been taken up.
Jammu division of Northern Railway:
Budgam station: The works of improvement of circulating, parking
and approach road have been completed. The works of lift and 12 m
Foot Over Bridge have been taken up.
Gurdaspur station: The works of station building, platform shelter,
improvement of platform surface, waiting room, toilet, circulating
area, porch and lighting have been completed. The works of new
platform no. 2, booking cum waiting hall, circulating area, parking,
entry/exit gate on main entry &second side and 12 m Foot Over Bridge
have been taken up.
Martyr Captain Tushar Mahajan station: The works of improvement of
station building, porch, waiting room, toilet, circulating area, parking,
approach road, signage and lighting have been completed. The works
of platform shelter, platform surfacing, entry/exit gate on main entry
side, lift, escalator and 6 m Foot Over bridge have been taken up.
Jharkhand:
Balsiring station: The works of improvement of station building,
platform shelter, parking, approach road, Divyangjan toilet and ticketcounter have been completed. The works of platform surfacing and
Foot Over Bridge have been taken up.
Bano station: The works of improvement of station building,
circulating area, approach road, station lighting and ramp have been
completed. The works of platform shelter, platform surfacing, drinking
water booth and Divyangjan toilet have been taken up.
Gangaghat station: The works of improvement of station building,
platform shelter, circulating area, parking and approach road have
been completed. The works of Foot Over Bridge and Divyangjan
facilities have been taken up.
Orga station: The works of improvement of station building, platform
shelter, platform surfacing, circulating area, approach road, station
lighting and Divyangjan toilet have been completed. The work of
Divyangjan parking has been taken up.
Tatisilwai station: The works of improvement of station building,
entrance porch, platform shelter, waiting hall, circulating area,
approach road and signage have been completed. The work of Foot
Over Bridge has been taken up.
Pali Lok Sabha Constituency:
Falna station: The works of station building, platform surfacing,
platform shelter and circulating area have been completed. The
works of lift and 12 m Foot Over Bridge have been taken up. Jawai Bandh station: The works of main station building, platform
surfacing and platform shelter at platform no. 1 have been completed.
The works of platform surfacing at platform no. 2, lift at platform no. 1
and 12 m Foot Over Bridge have been taken up.
Marwar Junction station: The works of main station building and
circulating area have been completed. The works of platform shelter,
platform surfacing, lift at platform no. 1 and 12 m Foot Over Bridge
have been taken up.
Rani station: The works of station building at main and second entry,
platform surfacing, platform shelter, circulating area and tactile
pathway for Divyangjan have been completed. The work of lift has
been taken up.
Jalgaon Lok Sabha Constituency:
Amalner station: The works of extension of platform no. 1, platform
surfacing, platform shelter at platform no. 2 and approach road have
been completed. The finishing works of new second entry building at
North side and new building with concourse have been taken up.
Chalisgaon station: The works of platform surfacing, platform shelter
and toilets have been completed. The works of improvement of
station building, circulating area, parking, landscaping and 12 m Foot
Over Bridge have been taken up.
Pachora Junction station: The works of new booking office at second
entry, improvement of existing booking office at main entry side,
platform shelter, platform surfacing, circulating area and parking atboth sides and boundary wall have been completed. The works of
improvement of existing Foot Over Bridge and toilet block have been
taken up.
Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways is a continuous and ongoing process and works
in this regard are undertaken as per requirement, subject to inter-se
priority and availability of funds. Development / redevelopment /
upgradation / modernisation of a station is carried out based on category
of station/condition/traffic handled etc.
The names of stations identified for development under Amrit Bharat
Station Scheme in Chhattisgarh, Delhi, Gujarat, Himachal Pradesh,
Jharkhand, Karnataka, Maharashtra and Rajasthan are as following:
No. of
State Names of Stations
Stations
Akaltara, Ambikapur, Baikunthpur Road, Balod,
Baradwar, Belha, Bhanupratappur, Bhatapara,
Bhilai, Bhilai Nagar, BhilaiPower House,
Bilaspur, Champa, Dallirajhara, Dongargarh,
Chhattisgarh 32 Durg, Hathbandh, Jagdalpur, Janjgir Naila,
Korba, Mahasamund, Mandir Hasaud, Marauda,
Nipania, Pendra Road, Raigarh, Raipur Jn, Raj
Nandgaon, Sarona, Tilda-Neora, Urkura,
Uslapur
Adarshnagar Delhi, Anand Vihar, Bijwasan,
Delhi 13 Delhi, Delhi Cantt., Delhi Safdarjung, Delhi Sarai
Rohilla, Delhi Shahadra, Hazrat Nizamuddin,No. of
State Names of Stations
Stations
Narela, New Delhi, Sabzi Mandi, Tilak Bridge
Ahmedabad, Anand, Ankleshwar, Asarva,
Bardoli, Bhachau, Bhaktinagar, Bhanvad,
Bharuch, Bhatiya, Bhavnagar, Bhestan, Bhildi,
Bilimora Jn, Botad Jn., Chandlodia, Chorvad
Road, Dabhoi Jn, Dahod, Dakor, Derol,
Dhrangadhra, Dwarka, Gandhidham, Godhra Jn,
Gondal, Hapa, Himmatnagar, Jam Jodhpur, Jam
Wanthali, Jamnagar, Junagadh Jn, Kalol Jn,
Kanalus Jn, Karamsad, Keshod, Khambhaliya,
Kim, Kosamba Jn, Lakhtar, Limbdi, Limkheda,
Mahemadabad Kheda Road, Mahesana Jn,
Gujarat 87
Mahuva, Maninagar, Mithapur, Miyagam Karjan
Jn, Morbi, Nadiad Jn, Navsari, New Bhuj, Okha,
Paddhari, Palanpur Jn, Palitana, Patan,
Porbandar, Pratapnagar, Rajkot Jn, Rajula Jn,
Sabarmati BG, Sabarmati MG, Sachin,
Samakhiyali, Sanjan, Savarkundla, Sayan,
Siddhpur, Sihor Jn., Somnath, Songadh, Surat,
Surendranagar, Than, Udhna, Udvada,
Umargaon Road, Unjha, Utran, Vadodara, Vapi,
Vatva, Veraval, Viramgam, Vishvamitri Jn.,
Wankaner
Himachal Amb Andaura, Baijnath Paprola, Palampur
4
Pradesh Himachal, Shimla
Balsiring, Bano, Barajamda Jn, Barkakana,
Jharkhand 57
Basukinath, Bhaga, Bokaro Steel City,No. of
State Names of Stations
Stations
Chaibasa, Chakradharpur, Chandil,
Chandrapura, Daltonganj, Dangoaposi, Deoghar,
Dhanbad, Dumka, Gamharia, Gangaghat,
Garhwa Road, Garhwa Town, Ghatsila, Giridih,
Godda, Govindpur Road, Haidar Nagar, Hatia,
Hazaribagh Road, Jamtara, Japla, Jasidih Jn,
Katrasgarh, Koderma Jn, Kumardubi, Latehar,
Lohardaga, Madhupur Jn, Manoharpur,
Muhammad Ganj, Muri Jn, N.S.C.B. Jn Gomoh,
Nagar Untari, Namkom, Orga, Pakur, Parasnath,
Piska, Rajkharswan, Rajmahal, Ramgarh Cantt,
Ranchi Jn, Sahibganj, Sankarpur, Silli, Sini,
Tatanagar, Tatisilwai, Vidyasagar
Almatti, Alnavar, Arsikere Junction, Badami,
Bagalkot, Ballary, Bangalore Cantt., Bangarpet,
Bantawala, Belagavi, Bidar, Chamaraja Nagar,
Channapatna, Channasandra, Chikkamagaluru,
Chikodi Road, Chitradurga, Davangere,
Dharwad, Dodballapur, Gadag, Gangapur Road,
Gangavathi, Ghataprabha, Gokak Road, Gubbi,
Karnataka 61
Harihar, Hassan, Hosapete, Kalaburagi Jn.,
Kengeri, Koppal, Krantivira Sangolli Rayanna
(Bengaluru Station), Krishnarajapuram,
Malleswaram, Malur, Mandya, Mangalore
Central, Mangalore Jn, Munirabad, Mysuru Jn
(Mysore), Raichur Jn, Ramanagaram,
Ranibennur, Raybag, Sagar Jambagaru,No. of
State Names of Stations
Stations
Sakleshpur, Shahabad, Shivamogga Town,
Shravanabelgola, Shree Siddharoodha Swamiji
Hubballi Jn, Subramanya Road, Talguppa,
Tiptur, Tumakuru, Udupi, Vijayapura, Wadi,
Whitefield, Yadgir, Yesvantpur
Ahmednagar, Ajni (Nagpur), Akalkot Road,
Akola, Akurdi, Amalner, Amgaon, Amravati,
Andheri, Badnera, Balharshah, Bandra
Terminus, Baramati, Belapur, Bhandara Road,
Bhokar, Bhusawal, Borivali, Byculla,
Chalisgaon, Chanda Fort, Chandrapur, Charni
Road, Chhatrapati Sambhajinagar, Chhatrapati
Shivaji Maharaj Terminus, Chinchpokli,
Chinchwad, Dadar (CR), Dadar (WR), Dahisar,
Daund, Dehu Road, Devlali, Dhamangaon,
Dharangaon, Dharashiv, Dharmabad , Dhule,
Maharashtra 132
Diva, Dudhani, Gangakher , Godhani, Gondia,
Grant Road, Hadapsar, Hatkanangale, Hazur
Sahib Nanded, Himayatnagar , Hinganghat,
Hingoli Deccan, Igatpuri, Jalgaon, Jalna, Jeur,
Jogeshwari, Kalyan Jn, Kamptee, Kandivali,
Kanjur Marg, Karad, Katol, Kedgaon, Kinwat ,
Kopargaon, Kurduwadi Jn, Kurla Jn, Lasalgaon,
Latur, Lokmanya Tilak Terminus, Lonand Jn,
Lonavla, Lower Parel, Malad, Malkapur, Manmad
Jn, Manwath Road , Marine Lines, Matunga,
Miraj Jn, Mudkhed Jn, Mumbai Central,No. of
State Names of Stations
Stations
Mumbra, Murtizapur Jn, Nagarsol , Nagpur Jn,
Nandgaon, Nandura, Nandurbar, Narkher Jn,
Nashik Road, Netaji Subhash Chandra Bose
Itwari Junction, Pachora Jn, Palghar,
Pandharpur, Panvel Jn, Parbhani Jn, Parel, Parli
Vaijnath, Partur , Phaltan, Prabhadevi, Pulgaon
Jn, Pune Jn, Purna Jn, Raver, Rotegaon ,
Sainagar Shirdi, Sandhurst Road, Sangli,
Satara, Savda, Selu, Sewagram, Shahad,
Shegaon, Shivaji Nagar Pune, Shri Chhatrapati
Shahu Maharaj Terminus Kolhapur, Solapur,
Talegaon, Thakurli, Thane, Titvala, Tumsar
Road, Umri, Uruli, Vadala Road, Vidyavihar,
Vikhroli, Wadsa, Wardha, Washim, Wathar
Abu Road, Ajmer, Alwar, Anupgarh,
AsalpurJobner, Balotra, Bandikui, Baran,
Barmer, Bayana, Beawar, Bharatpur, Bhawani
Mandi, Bhilwara, Bijainagar, Bikaner, Bundi,
Chanderiya, Chhabra Gugor, Chittorgarh Jn.,
Churu, Dakaniya Talav, Dausa, Deeg, Degana,
Rajasthan 85 Deshnoke, Dholpur, Didwana, Dungarpur, Falna,
Fatehnagar, Fatehpur Shekhawati, Gandhinagar
Jaipur, Gangapur City, Gogameri, Gotan, Govind
Garh, Hanumangarh, Hindaun City, Jaipur Jn,
Jaisalmer, Jalor, Jawai Bandh, Jhalawar City,
Jhunjhunu, Jodhpur, Kapasan, Khairthal, Kherli,
Kota Jn, Lalgarh Jn, Mandal Garh, MandawarNo. of
State Names of Stations
Stations
Mahwa Road, Marwar Bhinmal, Marwar Jn,
Mavli Jn, Merta Road Jn, Nagaur, Naraina, Nim
ka Thana, Nokha, Pali Marwar, Phalodi Jn,
Phulera Jn, Pindwara, Rai singhnagar, Rajgarh,
Ramdevra, Ramganj Mandi Jn,
Ranapratapnagar, Rani, Ratangarh Jn, Ren,
Ringas, Sadulpur, Sanganer, Sawai Madhopur,
Shri Mahaveerji, Sikar, Sojat Road, Somesar, Sri
ganganagar, Sujangarh, Suratgarh, Udaipur City
Amrit Bharat Station Scheme involves preparation of master plans and their
implementation in phases to improve the stations. The master planning
includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement, water
booths
Provision of wider foot over bridge/air concourse commensurate with
passenger traffic
Provision of lift/escalators/ramp
Improvement /Provision of platform surface and cover over platforms
Provision of kiosks for local products through schemes like ‘One
Station One Product’
Parking areas, Multimodal integration
Amenities for Divyangjans
Better passenger information systems Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity at each
station.
The scheme also envisages sustainable and environment friendly solutions,
provision of ballastless tracks etc. as per necessity, phasing and feasibility
and creation of city centre at the station in the long term.
Development / Upgradation of railway stations is complex in nature
involving safety of passengers & trains and requires various statutory
clearances such as fire clearance, heritage, tree cutting, airport clearance
etc. The progress also gets affected due to brownfield related challenges
such as shifting of utilities (involving water/sewage lines, optical fibre
cables, gas pipe lines, power/signal cables, etc.), infringements, operation
of trains without hindering passenger movement, speed restrictions due to
works carried out in close proximity of tracks and high voltage power lines,
etc. and these factors affect the completion time.
Development / upgradation / modernisation of stations including under
Amrit Bharat Station Scheme is generally funded under Plan Head-53
‘Customer Amenities’. The details of allocation and expenditure under Plan
Head-53 are maintained Zonal Railway-wise and not work-wise, or station-
wise or state-wise.
Chhattisgarh is covered under the jurisdiction of two railway zones, namely
South East Central Railway and East Coast Railway. For these zones, an
allocation of ₹ 1,163 crore has been made for the financial year 2025–26,
out of which an expenditure (up to January, 2026) of ₹ 853 crore has been
incurred so far.Delhi is covered under the jurisdiction of Northern Railway. For this zone,
an allocation of ₹ 1,483 crore has been made for the financial year 2025–
26, out of which an expenditure (up to January, 2026) of ₹ 1,400 crore has
been incurred so far.
Gujarat is covered under the jurisdiction of two railway zones, namely
North Western Railway and Western Railway. For these zones, an allocation
of ₹ 2,081 crore has been made for the financial year 2025–26, out of which
an expenditure (up to January, 2026) of ₹ 1,820 crore has been incurred so
far.
Himachal Pradesh is covered under the jurisdiction of Northern Railway.
For this zone, an allocation of ₹ 1,483 crore has been made for the financial
year 2025–26, out of which an expenditure (up to January, 2026) of ₹ 1,400
crore has been incurred so far.
Jharkhand is covered under the jurisdiction of three railway zones, namely
Eastern Railway, East Central Railway and South Eastern Railway. For
these zones, an allocation of ₹ 1,469 crore has been made for the financial
year 2025–26, out of which an expenditure (up to January, 2026) of ₹ 1,292
crore has been incurred so far.
Karnataka is covered under the jurisdiction of four railway zones, namely
Central Railway, Southern Railway, South Central Railway and South
Western Railway. For these zones, an allocation of ₹ 3,898 crore has been
made for the financial year 2025–26, out of which an expenditure (up to
January, 2026) of ₹ 3,568 crore has been incurred so far.
Maharashtra is covered under the jurisdiction of four railway zones, namely
Central Railway, South Central Railway, South East Central Railway andWestern Railway. For these zones, an allocation of ₹ 3,834 crore has been
made for the financial year 2025–26, out of which an expenditure (up to
January, 2026) of ₹ 3,461 crore has been incurred so far.
Rajasthan is covered under the jurisdiction of five railway zones, namely
Northern Railway, North Central Railway, North Western Railway, Western
Railway and West Central Railway. For these zones, an allocation of ₹ 4,797
crore has been made for the financial year 2025–26, out of which an
expenditure (up to January, 2026) of ₹ 4,248 crore has been incurred so far.
Tourism Circuits:
Indian Railways have issued ‘Bharat Gaurav Trains’ policy in November,
2021, under which theme based tourist trains are being run with the
objective to showcase India’s rich cultural heritage and magnificent
historical places to the people of India and the world. As per this policy,
service providers have full flexibility to decide the themes/itineraries for
operation of Bharat Gaurav tourist circuit trains, which may include tourist
circuits of any part of India, based on market demand, commercial viability
etc.
ROB/RUB Works:
Sanctioning of works of Road Over Bridge (ROB)/Road Under Bridge (RUB)
in lieu of Level crossings (LCs) is a continuous and dynamic process of
Indian Railway. Such works are prioritised and taken up on the basis of its
impact on safety in train operations, mobility of trains & impact for road
users and feasibility etc.No. of ROBs/ RUBs constructed on Indian Railways during the period 2004-
14 vis a vis 2014-26 (Jan’26) is as under:
Period ROBs/ RUBs constructed
2004-14 4,148 Nos.
2014-26 14,024 Nos. (including 14 Nos. of ROBs/ RUBs in the state
(Up to Jan’26) of Delhi)
As on 01.02.2026, 4,802 Nos. ROBs/ RUBs are sanctioned at cost of
₹ 1,14,196 crore on Indian Railways including 19 Nos. Road Over Bridge
(ROB)/Road Under Bridge (RUB) are sanctioned at cost of ₹ 719 crore in
Delhi which are at various stages of planning and execution.
The position of sanctioned ROBs/RUBs at said locations are as under:
SN Location Remarks
1 LC No. 12 The construction of 4-lane ROB at this location
(Kirari) on has been included as part of mega drain project
Delhi- of Delhi Government. An agreement has been
Bathinda reached as per which the work for providing ROB
at LC No. 12 shall be executed by the state
government.
2 LC No. 18 Work for providing ROB at this location was
(Ghevra) on sanctioned on cost sharing basis at a cost of
Delhi- ₹ 109 crore in the year 2019-20. Subsequently, on
Bathinda the request of State Government, a proposal of
section change of scheme of work i.e., from ROB to RUB
has been examined and found not feasible due to
low bank height. Keeping in view the publicSN Location Remarks
demand, the construction of ROB has now been
taken up at Railway’s cost. Detailed estimate has
been sanctioned and GAD has been approved.
Tender has been invited.
3 LC No. 16 Initially, this work was sanctioned for the
(Narela) on construction of ROB at a cost of ₹ 165 crore.
Delhi- Subsequently, the request of State Government
Ambala proposal of change of scheme of work i.e., from
section ROB to RUB has been examined but found not
feasible due to low bank height.
Keeping in view the public demand, the
construction of ROB has now been taken up at
Railway’s cost. Detailed estimate has been
sanctioned and GAD has been approved.
4 LC No. 10 The work for construction of RUB at this location
(Siraspur) has been sanctioned at a cost of ₹ 4.76 crore.
on Delhi- Detailed estimate has been sanctioned and GAD
Ambala has been approved. Contract has been awarded.
section The work has been taken up.
5 LC No. 11 The work for construction of RUB at this location
(Khera has been sanctioned at a cost of ₹ 3.83 crore.
Kalan) on Subway work of Railway portion has been
Delhi- completed. Approach road works have been taken
Ambala up.
section
6 LC No. 12 The work for construction of ROB at this location
(Khera has been sanctioned at a cost of ₹ 131.55 crore.SN Location Remarks
Kalan) on Detailed estimate has been sanctioned and GAD
Delhi- has been approved. Contract has been awarded.
Ambala The work for construction has been taken up.
section
7 LC No. 19 The Technical Feasibility Report (TFR)/ Detailed
(Tikri Project Report (DPR) for construction of RUB at
Kalan) on this location has been taken up.
Delhi-
Bathinda
8 LC No. 14 The Technical Feasibility Report (TFR)/ Detailed
(Holambi Project Report (DPR) for construction of RUB at
Kalan) on this location has been taken up.
Delhi-
Ambala
section
9 LC No. 15 The work for construction of RUB at this location
(Bhorgarh) has been sanctioned at a cost of ₹ 5.7 crore. GAD
on Delhi- has been approved and Detailed Estimate has
Ambala been sanctioned. Contract has been awarded. The
section work for utility shifting has been taken up.
10 Non LC A subway with 2 lanes having 10.5m width and
(Rohini 5.5m height to cater to four lanes of traffic has
Sector 18 already been commissioned at this location to
metro connect Rohini to Samaypur.
station) on
Delhi-
AmbalaCompletion & commissioning of ROB/RUB works depends on various
factors like fixing of approach alignment, approval of General Arrangement
Drawing (GAD), land acquisition, removal of encroachment, shifting of
infringing utilities, statutory clearances from various authorities, duration
of working season in a year for the particular project / area due to climatic
conditions etc. All these factors affect the completion time of the projects
/ works.
Railways have taken following measures to expedite the progress of
ROB/RUB works:
(i) Joint survey with concerned State Government/Road Owning
Authority is done before finalizing the General Arrangement
Drawing (GAD) to ensure smooth execution.
(ii) Periodic meetings of Railway and State Government officials are
done to resolve various issues related to ROB/RUB works.
(iii) Standardization of superstructure drawings for various
combinations of span, skewness and width of road on Railway
portion has been done to avoid delays during the design approval.
This has been issued in the form of compendium, which can be
directly adopted for Road Over Bridge across Railway lines for
expeditious planning.
(iv) ROB/RUB works are planned to be executed on a single entity basis
by Railway wherever possible. In case any Road Owning
authority/State Government wants, then Railway may permit them
to execute the work on a single entity basis.
*****