GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 4337
TO BE ANSWERED ON 18.03.2026
RAILWAY ACCIDENTS IN THE COUNTRY
†4337. ADV. CHANDRA SHEKHAR:
Will the Minister of RAILWAYS be pleased to state:
(a) the location-wise details of the railway accidents occurred during the
last five years in the country including the details of main causes
thereof along with the number of casualties;
(b) whether the lack of track maintenance, signalling system failure and
vacant posts are among the main causes of the said accidents and
operational problems;
(c) if so, the concrete steps taken/being taken by the Government to
remove the said shortcomings and the budget allocated for the said
purpose during last five years; and
(d) whether the Government proposes to implement a time-bound action
plan to improve railway safety and passenger amenities and if so, the
details thereof along with the time line of the said action plan?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (d): Safety is accorded the highest priority on Indian Railways. As a
consequence of various safety measures taken over the years, there has
been a steep decline in the number of accidents.
Number of Consequential Train Accidents has reduced as shown in the
table below:-
Year Consequential Accidents
2014-15 135
2025-26 (upto 28.02.2026) 14 (90% lesser)
§Another important index showing improvement in safety in train operations
is Consequential Accident Index, the details of which are as under:-
Consequential Accident Index:-
Year Accident Index
2014-15 0.11
2024-25 0.03 (73% lesser)
This index measures number of consequential accidents as a ratio of total
running kilometers of all trains.
No. of consequential accidents
Accident Index =
No. of trains X million kilometers run
234
s
t
n
e
d
i
c
c
A 165
n
i
a
r
T
l 135
a
i
t
n
e
u
q
e
s
n
o
C
55
f
o
.
o
N 31
14
2005-06 2009-10 2014-15 2019-20 2024-25 2025-26
(Feb 2026)
The causes of the accidents that took place over Indian Railways broadly
include track defects, loco/coach defects, equipment failures, human
errors, etc.Consequential Train Accidents on Indian Railways and casualties (including
railway passengers and railway personnel) therein are as follows:-
No. of Consequential No. of Deaths No. of Injuries
Period
Train Accidents
2004-05 to 2013-14 1,711 904 3,155
2014-15 to 2023-24 678 748 2,087
2024-25 31 18 92
2025-26 (upto
14 16 28
February 2026)
The various safety measures, including track maintenance and signalling
system, taken to enhance safety in train operations are as under:-
1. On Indian Railways, the expenditure on Safety related activities has
increased over the years as under:-
Expenditure/Budget on Safety related activities (Rs. in Cr.)
2013-14 2022-23 2023-24 2024-25 2025-26 2026-27
39,200 87,336 1,01,662 1,14,022 1,17,693 1,20,389
2. Electrical/Electronic Interlocking Systems with centralized operation
of points and signals have been provided at 6,665 stations up to
28.02.2026 to reduce accidents due to human failure.
3. Interlocking of Level Crossing (LC) Gates has been provided at 10,153
Level Crossing Gates up to 28.02.2026 for enhancing safety at LC
Gates.
4. Complete Track Circuiting of stations to enhance safety by
verification of track occupancy by electrical means has been provided
at 6,669 stations up to 28.02.2026.
5. Indian Railways has gone for implementation of indigenously
developed Automatic Train Protection (ATP) system, which required
safety certification of highest order (SIL 4). Kavach has been adoptedas a National ATP system in July 2020. Based on deployment of
Kavach version 3.2 on 1465 RKm on South Central Railway and
experience gained, further improvements were made. Finally, Kavach
specification version 4.0 was approved by RDSO on 16.07.2024. After
extensive and elaborate trials, Kavach Version 4.0 has been
successfully commissioned on 1,452 Route Kilometres, covering the
high density Delhi- Mumbai and Delhi-Howrah routes as below:
SN Section Progress Route
(Km)
(1) Delhi-Mumbai route:
i Junction cabin – Palwal – Mathura –Nagda 667
section
ii Vadodara - Ahmedabad section 96
iii Vadodara - Virar section 336
(2) Delhi – Howrah route:
i Gaya Sarmatanr section 93
ii Chota Ambana - Bardhaman – Howrah 260
section
Further, track side Kavach implementation work has been taken up on
24,427 RKM covering all GQ, GD, HDN and identified sections of
Indian Railways.
6. Detailed instructions on issues related with safety of Signalling, e.g.
mandatory correspondence check, alteration work protocol,
preparation of completion drawing, etc. have been issued.
7. System of disconnection and reconnection for S&T equipment as per
protocol has been re-emphasized.
8. All locomotives are equipped with Vigilance Control Devices (VCD) to
improve alertness of Loco Pilots.
9. Retro-reflective sigma boards are provided on the mast which is
located two OHE masts prior to the signals in electrified territories toalert the crew about the signal ahead when visibility is low due to
foggy weather.
10. A GPS based Fog Safety Device (FSD) is provided to loco pilots in fog
affected areas which enables loco pilots to know the distance of the
approaching landmarks like signals, level crossing gates, etc.
11. Modern track structure consisting of 60kg, 90 Ultimate Tensile
Strength (UTS) rails, Prestressed Concrete Sleeper (PSC) Normal/Wide
base sleepers with elastic fastening, fan shaped layout turnout on
PSC sleepers, Steel Channel/H-beam Sleepers on girder bridges is
used while carrying out primary track renewals.
12. Mechanisation of track laying activity through use of track machines
like PQRS, TRT, T-28 etc. to reduce human errors.
13. Maximizing supply of 130m/260m long rail panels for increasing
progress of rail renewal and avoiding welding of joints, thereby
improving safety.
14. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws and
timely removal of defective rails.
15. Laying of longer rails, minimizing the use of Alumino Thermic Welding
and adoption of better welding technology for rails i.e., Flash Butt
Welding.
16. Monitoring of track geometry by OMS (Oscillation Monitoring System)
and TRC (Track Recording Cars).
17. Patrolling of railway tracks to look out for weld/rail fractures.
18. The use of Thick Web Switches and Weldable CMS Crossing in turnout
renewal works.
19. Inspections at regular intervals are carried out to monitor and
educate staff for observance of safe practices.
20. Web based online monitoring system of track assets viz. Track
database and decision support system has been adopted to decide
rationalized maintenance requirement and optimize inputs.21. Detailed instructions on issues related with safety of Track, e.g.
integrated block, corridor block, worksite safety, monsoon
precautions, etc. have been issued.
22. Preventive maintenance of railway assets (Coaches & Wagons) is
undertaken to ensure safe train operations.
23. Replacement of conventional ICF design coaches with LHB design
coaches is being done.
24. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route
have been eliminated by January 2019.
25. Safety of Railway Bridges is ensured through regular inspection of
Bridges. The requirement of repair/rehabilitation of Bridges is taken
up based upon the conditions assessed during these inspections.
26. Indian Railways has displayed Statutory “Fire Notices” for widespread
passenger information in all coaches. Fire posters are provided in
every coach so as to educate and alert passengers regarding various
Do‟s and Don‟ts to prevent fire. These include messages regarding not
carrying any inflammable material, explosives, prohibition of smoking
inside the coaches, penalties etc.
27. Production Units are providing Fire detection and suppression system
in newly manufactured Power Cars and Pantry Cars, Fire and Smoke
detection system in newly manufactured coaches. Progressive
fitment of the same in existing coaches is also underway by Zonal
Railways in a phased manner.
28. Regular counselling and training of staff is undertaken.
29. Concept of Rolling Block introduced in Indian Railways (Open Lines)
General Rules vide Gazette notification dated 30.11.2023, wherein
work of integrated maintenance/ repair/replacement of assets is
planned up to 52 weeks in advance on rolling basis and executed as
per plan.The details of the Safety related works related to better maintenance
practices, Technological improvements, better infrastructure and rolling
stock etc. undertaken by Railways are tabulated below:-
2004-05 to 2014-15 to 2014-25 Vs.
S.N. Item
2013-14 2024-25 2004-14
Technological Improvements
1. Use of high-quality 57,450 Km 1.43 Lakh Km More than
rails (60 Kg) (Km) 2 times
2. Longer Rail Panels 9,917 Km 77,522 Km Nearly
(260m) (Km) 8 times
3. Electronic 837 Stations 3,691 Stations More than
Interlocking 4 times
(Stations)
4. Fog Pass Safety As on As on 288 times
Devices (Nos.) 31.03.14: 31.03.25:
90 Nos. 25,939 Nos.
5. Thick Web Switches Nil 28,301 Nos.
(Nos.)
Better Maintenance Practices
1. Primary Rail Renewal 32,260 Km 49,941 Km 1.5 times
(Track Km)
2. USFD (Ultra Sonic 79.43 Lakh 2 Crore More than
Flaw detection) 2 times
Testing of Welds
(Nos.)
3. Weld failures (Nos.) In 2013-14: In 2024-25: 90% reduction
3699 Nos. 370 Nos.
4. Rail fractures (Nos.) In 2013-14: In 2024-25: More than
2548 Nos. 289 Nos. 88%reduction
Better Infrastructure and Rolling Stock
1. New Track KM added 14,985 Km 34,428 Km More than
(Track Km) 2 times
2. Flyovers 4,148 Nos. 13,808 Nos. More than
(RoBs)/Underpasses 3 times
(RUBs) (Nos.)3. Unmanned Level As on As on Removed
crossings (Nos.) on 31.03.14: 31.03.24: Nil
BG 8,948 (All eliminated
by 31.01.19)
4. Manufacture of LHB 2,337 Nos. 42,677 More than
Coaches (Nos.) 18 times
Recruitment
For filling up vacancies, recruitment done in Indian Railways during 2004-
05 to 2013-14 vis-à-vis during 2014-15 to 2025-26 is given as under: -
Period Recruitments
2004-2005 to 2013-2014 4.11 lakh
2014-2015 to 2024-2025 5.08 lakh
2025-26 till date 41,343
Occurrence and filling up of vacancies are continuous processes on Indian
Railways considering its size, spatial distribution and criticality of
operation. Adequate and suitable manpower is provided to cater to the
regular operations, changes in technology, mechanisations and innovative
practices. The vacancies are filled up primarily by placement of indents by
Railways with Recruitment agencies as per operational and technological
requirements.
The RRB examinations are quite technical in nature entailing large scale
mobilization of men and resources and training of manpower. Railway
overcame all these challenges and successfully conducted the recruitment
in a transparent manner following all laid down guidelines. No instance of
paper leakage or similar malpractice has occurred during the entire
process.
Further, as system improvement, the Ministry of Railways has introduced a
system of publishing the annual calendar from 2024 for recruitment tovarious categories of Group „C‟ posts. The introduction of the annual
calendar is benefitting the aspirants in the following manner:
•More opportunities for candidates;
•Opportunities to those becoming eligible every year;
•Certainty of exams;
•Faster Recruitment process, Training and Appointments
Presently, recruitment against 1,43,086 vacancies of non-gazetted
personnel has been taken up on Indian Railways as per Annual Calendar
2024 and 2025.
During January to December 2024, ten Centralized Employment
Notifications (CENs) for 92,116vacancies were notified for filling up of
posts of Assistant Loco Pilots (ALPs), Technicians, Sub-Inspectors,
Constables in Railway Protection Force (RPF), Junior Engineers (JEs)/Depot
Material Superintendent (DMS)/Chemical & Metallurgical Assistant (CMA),
Paramedical Categories, Non-Technical Popular Categories (Graduate),
Non-Technical Popular Categories (Under-Graduate), Ministerial & Isolated
Categories and Level-1 categories such as Assistants, Track Maintainers
and Pointsman.
First stage/Single stage Computer Based Tests (CBTs) for 92,116 posts
have been completed. Details are as under: -
Exam Candidates Cities Languages
1st Stage CBT for the post of ALP (18,799 18,40,347 156 15
vacancies)
CBT for the post of Technician (14,298 26,99,892 139 15
vacancies)
1st Stage CBT for the post of JE/DMS/CMA 11,01,266 146 15
(7,951 vacancies)CBT for the post of RPF-SI (452 vacancies) 15,35,635 143 15
CBT for the post of RPF-Constable (4,208 45,30,288 147 15
vacancies)
CBT for Paramedical Categories (1,376 7,08,321 143 15
vacancies)
1st Stage CBT for Non-Technical Popular 58,41,774 141 15
Categories (Graduate) (8,113 vacancies)
1st Stage CBT for Non-Technical Popular 63,27,473 157 15
Categories (Under Graduate) (3,445
vacancies)
CBT for Ministerial & Isolated categories 4,46,013 139 15
(1,036 vacancies)
CBT for level-1 post (32438 vacancies) 1,08,28,261 152 15
Total Candidates 3,58,59,270
2nd stage CBTs for the posts of ALP, JE/DMS/CMA and Non-Technical Popular
Categories (Graduate & Under-Graduate) have also been
completed. Details are as under: -
Exam Candidates Cities Languages
2nd Stage CBT for the post of ALP 2,66,363 112 15
(18,799 vacancies)
2nd Stage CBT for the post of JE/DMS/CMA 1,17,339 118 15
(7,951 vacancies)
2nd Stage CBT for Non-Technical Popular 1,21,931 129 15
Categories (Graduate) (8,113 vacancies)
2nd Stage CBT for Non-Technical Popular 51,978 79 15
Categories (Under-Graduate)
(3,445 vacancies)
Total Candidates 5,57,611Computer Based Aptitude Test (CBAT) for the post of ALP and Non-
Technical Popular Categories (Graduate) and Computer based Skill Test for
the post of Non-Technical Popular Categories (Graduate and Under
Graduate) and Ministerial & Isolated Categories have also been completed.
Details are as under: -
Exam Candidates Cities Languages
CBAT for the post of ALP 1,32,044 84 2
Translation Test for Ministerial and 1,233 8 2
Isolated Categories
CBAT for the post of Non-Technical 13,616 38 2
Popular Categories (Graduate)
Computer Based Typing Skill Test 30,341 58 2
(CBTST) for the post of Non-Technical
Popular Categories (Graduate-level)
Computer Based Typing Skill Test 13,145 44 2
(CBTST) for the post of Non-Technical
Popular Categories (Under-Graduate-
level)
Total Candidates 1,90,379
Panels for more than 41,000 candidates for various posts including the
posts of Technicians, Junior Engineers, Paramedical Categories, Sub-
Inspectors & Constable (RPF) and Assistant Loco Pilots have
been finalised. Majority of them are in safety categories.
In addition, as per Annual Calendar for the year 2025, nine Centralized
Employment Notifications (CENs) for 50,970 vacancies have also been
issued. Details are as under: -CEN No. Post Name No. of Vacancies Month
notified of Notification
01/2025 Assistant Loco Pilots 9,970 March 2025
02/2025 Technician 6,238 June 2025
03/2025 Paramedical categories 434 July 2025
04/2025 Section Controller 368 August 2025
Junior Engineer/ Depot 2,585 October 2025
05/2025 Material Superintendent
Non-Technical Popular 5,810 October 2025
06/2025 Categories (Graduate)
Non-Technical Popular 3,058 October 2025
Categories (Under-
07/2025 Graduate)
08/2025 Isolated Categories 312 December 2025
09/2025 level-1 22,195 December 2025
First stage/Single stage Computer Based Tests (CBTs) for 2,953 posts have
been completed. Details are as under: -
Exam Candidates Cities Languages
CBT for the post of Section Controller 131 15
4,33,748
(368 vacancies)
1st Stage CBT for the post of JE/DMS 5,74,351 133 15
(2585 vacancies)
Total Candidates 10,08,099
Passenger Amenities
As regards passenger amenities, improvement in passenger amenities at
railway stations is a continuous and on-going process depending uponneed, volume of the passenger traffic and inter-se priority of works, subject
to availability of funds. Further, at present, modernization of stations is
being taken up under „Amrit Bharat Station Scheme‟ which envisages
development of Stations on a continuous basis with a long time approach
as detailed below:
Amrit Bharat Stations:
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their
implementation in phases to improve the stations. The master planning
includes:
• Improvement of access to station and circulating areas
• Integration of station with both sides of city
• Improvement of station building
• Improvement of waiting halls, toilets, sitting arrangement, water
booths
• Provision of wider foot over bridge/air concourse commensurate
with passenger traffic
• Provision of lift/escalators/ramp
• Improvement/Provision of platform surface and cover over
platforms
• Provision of kiosks for local products through schemes like „One
Station One Product‟
• Parking areas, Multimodal integration
• Amenities for Divyangjans
• Better passenger information systems• Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity at each
station.
The scheme also envisages sustainable and environment friendly
solutions, provision of ballastless tracks etc. as per necessity, phasing
and feasibility and creation of city centre at the station in the long
term.
So far, 1,338 stations have been identified for development under the
Amrit Bharat Station Scheme.
Completed stations:
Development works at railway stations under Amrit Bharat Station
Scheme have been taken up at a good pace. Till now, works have been
completed at 180 stations. Names of stations completed so far are as
following:
Alnavar, Amb Andaura, Ambikapur, Amgaon, Anandpur Sahib, Anara,
Angamali For Kaladi, Ayodhya Dham, Badami, Bagalkot, Baijnath
Paprola, Balrampur, Bantawala, Barabhum, Baramati, Bareilly City,
Baripada, Barmer, Barpali, Begumpet, Beohari, Bhanupratappur, Bhilai,
Bhind, Bijnor, Bimalgarh, Bommidi, Bundi, Chanda Fort, Chalakudi,
Changanassery, Chennai Park,Chhindwara, Chidambaram, Chinchpokli,
Chinna Salem, Chirayinkeezh, Cuttack, Dakor, Derol, Deshnoke, Devlali,
Dharwad, Dhule, Dongargarh, Fatehabad, Fatehpur, Fatehpur
Shekhawati, Ferok, Gadag, Gangapur City, Godda, Godhra Jn.,
Gogameri, Gokak Road, Gola Gokarnath, Gomti Nagar, Govardhan,
Govind Garh, Govindpuri, Govindpur Road, Hafizpeta, Haibargaon,
Haldia, Hapa, Harpalpur, Hathras City, Hodal, Idgah Agra Jn., Izzatnagar,
Jaisalmer, Jam Jodhpur, Jam Wanthali, JoychandiPahar,Junnor Deo,Kakinada Town, Kalyani Ghoshpara, Kamakhyaguri, Kanalus Jn.,
Karaikkudi Jn., Karamsad, Karimnagar, Katni South, Kedgaon,
Khairthal, Khambhaliya, Khalilabad, Koppal, Kosamba Jn., Kulitturai,
Kuttipuram, Lasalgaon, Limbdi, Lohardaga, Lonand Jn., Mahe, Mahuva,
Mailani, Mandal Garh, MandawarMahwa Road, Madhupur, Mambalam,
Manaparai, Mandi Dabwali, Mangalagiri, Mannargudi, Matunga, M.C.S.
Chhatarpur, Mithapur, Morappur, Morbi, Muktsar, Munirabad, Muri Jn.,
Murtizapur Jn., Nainpur Jn., Nandura, Narmadapuram (Hoshangabad),
Netaji Subhash Chandra Bose Itwari Junction, Nidadavolu Jn., Nilambur
Road, Okha, Orchha, Palitana, Panagarh, Panki Dham, Parel,
Parlakhemundi, Pirpainti, Piska, Pokhrayan, Pollachi Jn., Polur,
Porbandar, Rajgarh, Rajmahal, Rajula Jn., Ramagundam, Ramghat Halt,
Rayanpadu, Saharanpur Jn., Sahibzada Ajit Singh Mohali, Sahebgunj,
Samakhiyali, Samalpatti, Sanchi, Sankarpur, Savda, Seoni, Shahad,
Shajapur, Sholavandan, Shoranur Jn., Shridham, Siddharth Nagar, Sihor
Jn., Siuri, Sri Bala Brahmeswara Jogulamba, Srirangam, Srivilliputtur,
St.Thomas Mount, Sullurpeta, Suraimanpur, Swaminarayan Chappia,
Talcher, Tamluk, Thawe, Thiruvarur Jn., Tiruvannamalai, Tripunithura,
Tuni, Ujhani, Urkura, Utran, Vadakara, Vadala Road,
Vidisha,Vriddhachalam Jn., Wadakancheri, Warangal.
The activities for development at other stations have also been taken
up at good pace and progress of some of the above stations is as given
below:
• Tirupati station: The structural framework of new second entry
station building on South side, 2 nos. air concourses and sewage
treatment plant have been completed. The finishing works of new
second entry station building on South side and air concourses,
structural work of station building on North side, platform shelter, lift,
escalator etc. have been taken up.• Nellore station: The structural framework, brickwork and
plastering of station building on both East and West sides have been
completed. The finishing works of station building on both East and
West side and air concourse, extension work of subway, parking, water
tanks and sewage treatment plant have been taken up.
• Bangalore Cantonment station: The works of diversion road on
South side, training centre, hostel on North side, electric substation
building have been completed. The works of South side station building,
North side station building, circulating area and Foot Over Bridge have
been taken up.
• Kota Junction station: The structural works of front departure
hall, front arrival hallandrear side station building have been completed.
The finishing works of front departure hall, rear side station building,
air concourse, through roof, circulating area have been taken up.
• Bhubaneshwar station: The structural work of new station building
at East and West side and air concourse have been completed. The
structural work of elevated driveway at East and West side station,
extension of Foot Over Bridge and platform shelter have been taken up.
The finishing works of new station building at East and West side,
works of MEP (Mechanical, Electrical and Plumbing), HVAC (Heating,
Ventilation and Air Conditioning) and escalators have been taken up.
Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways is a continuous and ongoing process and
works in this regard are undertaken as per requirement, subject to
inter-se priority and availability of funds. Development / redevelopment /
upgradation / modernisation of a station is carried out based on
category of station/condition/traffic handled etc.Development / Upgradation of railway stations is complex in nature
involving safety of passengers & trains and requires various statutory
clearances such as fire clearance, heritage, tree cutting, airport
clearance etc. The progress also gets affected due to brownfield
related challenges such as shifting of utilities (involving water/sewage
lines, optical fibre cables, gas pipe lines, power/signal cables, etc.),
infringements, operation of trains without hindering passenger
movement, speed restrictions due to works carried out in close
proximity of tracks and high voltage power lines, etc. and these factors
affect the completion time.
Further, development / upgradation / modernization of stations including
Amrit Bharat Station Scheme is generally funded under Plan Head–53
„Customer Amenities‟. The details of allocation and expenditure under
Plan Head–53 are maintained Zonal Railway-wise and not work-wise or
station-wise or state-wise. The fund allocation of ₹ 12,120 crore has
been made for the financial year 2025-26 under Plan Head–53 and
expenditure (up to February, 2026) of ₹ 11,892 crore has been incurred
so far.
*****