Home India RAILWAYS Parliament Question: Railway Halt at Village Kharakram Ji in...
Date: 2025-12-17 Category: Not Applicable State: Union Government Country: India

Parliament Question: Railway Halt at Village Kharakram Ji in Haryana

Issued by RAILWAYS · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** This document is a response to Starred Question No. 259 in the Lok Sabha, set to be answered on December 17, 2025. The question concerns a proposal to provide a railway halt at Village Kharakram Ji in Haryana. The document states that there is already rail service to the village from two nearby stations and details the process for considering new railway halts. **Key Points / Main Content** * **Existing Rail Service:** * Kharakram Ji village is served by two nearby railway stations: Lalit Khera Halt (LTKR) and Pandu Pindara Halt (PPDE). * These stations are on the Sonipat-Jind railway line. * Three pairs of trains currently stop at both stations. * **Opening of New Halt Stations:** * Opening a new station depends on several factors, including passenger footfall, cost, recurring expenditure, operational feasibility, and distance from nearby stations. * **Handling of Proposals:** * The Ministry of Railways receives proposals/requests/suggestions/representations for opening halt stations from various sources, including Members of Parliament, elected representatives, organizations/rail users. * These submissions are received at various levels, including Railway Board, Zonal Railways, and Divisional Office. * The process of receiving and examining submissions is continuous and dynamic. * Action is taken on submissions found feasible and justified from time to time. * There is no centralized compendium of these submissions. **Impact Analysis** **Stakeholder: Residents of Kharakram Ji and Surrounding Area** **Impact:** The residents sought improved transport facilities, but the document indicates that the village is currently served by two nearby railway stations. **Action Required:** Continue to engage with local representatives and railway authorities to demonstrate the need for additional or improved railway services, considering the criteria (footfall, cost, feasibility, etc.) used to evaluate new stations. **Stakeholder: Local Public Representatives** **Impact:** Their submitted demands and survey reports are part of the continuous process of consideration by the Ministry of Railways. **Action Required:** Continue submitting and advocating for proposals, providing detailed information and justifications based on the criteria used by the Ministry of Railways for evaluating new stations.

Key Entities Referenced

Ministry of Railways: The primary ministry responsible for answering the parliamentary question related to a railway halt. Lok Sabha: The house of parliament to which the starred question was addressed. Kharakram: Village in Haryana where a railway halt is proposed. Sonipat-Jind railway line: The railway line on which the proposed halt is to be located.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA STARRED QUESTION NO.259 TO BE ANSWERED ON 17.12.2025 RAILWAY HALT AT VILLAGE KHARAKRAM JI IN HARYANA †*259. SHRI SATPAL BRAHAMCHARI: Will the Minister of RAILWAYS be pleased to state: (a) whether any proposal to provide railway halt at village Kharakram ji on the Sonipat-Jind railway line is under consideration with the Government and if so, the details thereof; (b) whether the local public representatives and villagers have submitted written demands and survey reports in this regard, if so, the details thereof; (c) whether the Government has conducted any survey regarding passengers footfall, geotechnical conditions and feasibility at the said location and if so, the details thereof; and (d) whether the Government proposes to grant early approval to the said proposal and to start the construction work to provide better transport facilities to the local residents of the said area and if so, the details thereof? ANSWER MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND ELECTRONICS & INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW) (a) to (d): A Statement is laid on the Table of the House. *****STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (d) OF LOK SABHA STARRED QUESTION NO. 259 TO BE ANSWERED ON 17.12.2025 (a) to (d) : Kharakram Ji village is served by two nearby railway stations—Lalit Khera Halt (LTKR) and Pandu Pindara Halt (PPDE)—on the Sonipat–Jind railway line, where three (03) pairs of trains presently stop at both stations. The opening of station depends on many factors such as passenger footfall, cost, recurring expenditure, operational feasibility and distance of nearby stations, etc. Proposals/requests/suggestions/representations, both formal and informal inter alia for opening of halt stations are received from Members of Parliaments, elected representatives, organizations/rail users, etc. at various levels including Railway Board, Zonal Railways, Divisional Office, etc. As receipts of such proposals/requests/ /suggestions/representations is a continuous and dynamic process, these are examined and action as found feasible and justified is taken from time to time and no centralized compendium of these submissions is maintained. ***

Continue your research