**Executive Summary**
This document is the response of the Minister of Railways to questions raised in the Lok Sabha regarding railway platform height standards, particularly at Ramgarh railway station in Churu Lok Sabha constituency. It outlines the ministry's approach to platform development, safety measures, and ongoing projects under the Amrit Bharat Station Scheme. No specific timeline for the Ramgarh project completion is provided.
**Key Points / Main Content**
* **Platform Standards and Development:**
* The majority of Indian Railways platforms are high-level.
* The Ministry of Railways aims to provide high-level platforms at all stations on Broad Gauge lines in a phased manner to improve passenger comfort and safety.
* Development/upgradation of stations, including raising platform heights, is a continuous process, subject to priority and fund availability.
* Priority is given to higher-category stations.
* **Amrit Bharat Station Scheme:**
* The Ministry of Railways launched the Amrit Bharat Station Scheme for long-term station redevelopment.
* The scheme involves phased master plan preparation and implementation.
* Master planning includes:
* Improved access and circulating areas.
* Station integration with both sides of the city.
* Station building improvement.
* Improved waiting halls, toilets, seating, and water booths.
* Wider foot over bridges/air concourses.
* Lifts/escalators/ramps.
* Platform surface and cover improvements.
* Kiosks for local products.
* Parking and multimodal integration.
* Amenities for Divyangjans.
* Better passenger information systems.
* Executive lounges and business meeting spaces.
* The scheme also includes sustainable and environment-friendly solutions and ballastless tracks.
* 1337 stations have been identified for development, including 85 in Rajasthan.
* **Rajasthan Development Works:**
* Development works under the Amrit Bharat Station Scheme in Rajasthan are underway.
* Works at 11 stations (Barmer, Bundi, Deshnoke, Fatehpur Shekhawati, Gogameri, Govind Garh, Jaisalmer, Khairthal, Mandal Garh, Mandawar Mahwa Road, Rajgarh) in Rajasthan have been completed under this scheme.
* Specific work is ongoing at Churu, Ratangarh Jn., Sadulpur, Sujangarh, Bikaner, Gandhinagar Jaipur, and Jaipur Junction stations.
* Structural work at Udaipur City station has been completed.
* **Expenditure:**
* Expenditure for development is maintained Zonal Railway-wise.
* ₹5,257 crore has been allocated for these zones in the financial year 2025-26, with ₹2,829 crore already spent.
* **Project Challenges:**
* Station development is complex, requiring statutory clearances and facing challenges like shifting utilities and managing train operations.
* No specific time frame for project completion can be indicated at this stage.
* **Passenger Safety Measures:**
* Policing is a state subject; unnatural death cases are handled by state police.
* Data on unnatural deaths is published by the National Crime Record Bureau (NCRB).
* Safety measures include:
* Zonal Railways have 'Joint Committees' to study and minimize deaths.
* Public announcements urging the use of Foot Over Bridges (FOBs).
* Legal action against rooftop travel.
* Passenger awareness videos on display.
* Awareness campaigns.
* Drives against trespassing.
* Warning signs.
**Impact Analysis**
**Stakeholder: Passengers**
* **Impact**: Improved platform heights, station amenities, and enhanced safety measures will lead to a better and safer travel experience.
* **Action Required**: Passengers are urged to use Foot Over Bridges and adhere to safety guidelines.
**Stakeholder: Railway Authorities (Ministry of Railways, Zonal Railways)**
* **Impact**: The Ministry is responsible for implementing the Amrit Bharat Station Scheme and ensuring passenger safety.
* **Action Required**: Continue ongoing development works, allocate resources effectively, and implement safety protocols.
**Stakeholder: Residents of Rajasthan (particularly Churu Lok Sabha Constituency)**
* **Impact**: Improved railway infrastructure and enhanced station facilities will lead to better connectivity and economic opportunities.
* **Action Required**: Engage with the railway authorities and local representatives to ensure timely project completion.
Key Entities Referenced
Ministry of Railways: The central government ministry responsible for the development and maintenance of railway infrastructure.
Amrit Bharat Station Scheme: A scheme launched by the Ministry of Railways for the redevelopment and modernization of railway stations with a long-term approach.
Rajasthan: The state where a significant number of railway stations are being developed under the Amrit Bharat Station Scheme.
Railways Act, 1989: The act under which persons are prosecuted for trespassing, travelling on footboard, steps, roof top of trains, boarding/de-boarding running trains etc.
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 2939
TO BE ANSWERED ON 17.12.2025
RAILWAY PLATFORM HEIGHT STANDARDS IN RAMGARH RAILWAY
STATION
2939. SHRI RAHUL KASWAN:
Will the Minister of RAILWAYS be pleased to state:
(a) the details of cases across the country where railway platforms
remain at/near rail level, below the mandated 760–840 mm standard,
stations-wise;
(b) the reasons for non-compliance with prescribed railway platform-
height norms in railway stations in Rajasthan;
(c) whether any passenger-safety audit has been conducted in view of
reported passenger deaths and injuries due to unsafe platform and
train gaps and if so, the details of loss of lives and injuries attributable
to such incidents; and
(d) the present status and expected timeline for raising the railway
platform height at Ramgarh railway station in Churu Lok Sabha
constituency to the mandated standard to ensure safe boarding and
alighting?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (d) At Shri Ramgarh station of Churu Lok Sabha Constituency,
platform shelter, waiting hall, drinking water facilities, seatingarrangement amenities are available. The work of extension and
raising of platform has been taken up.
Majority of platforms on Indian Railways are high level platforms.
However, to improve passenger comfort and safety, Ministry of
Railways has envisaged to provide high level platform at all stations
on Broad Gauge lines in a phased manner.
Development / redevelopment / upgradation / modernisation of stations
including raising of platforms to high level platforms on Indian
Railways is a continuous and ongoing process and works in this regard
are undertaken as per requirement, subject to inter-se priority and
availability of funds. The priority for development / redevelopment /
upgradation / modernisation of stations is accorded to higher category
of station over lower category of station while sanctioning and
executing the works.
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their
implementation in phases to improve the stations. The master
planning includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement, water
booths
Provision of wider foot over bridge/air concourse commensurate
with passenger traffic Provision of lift/escalators/ramp
Improvement /Provision of platform surface and cover over
platforms
Provision of kiosks for local products through schemes like ‘One
Station One Product’
Parking areas, Multimodal integration
Amenities for Divyangjans
Better passenger information systems
Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity at each
station
The scheme also envisages sustainable and environment friendly
solutions, provision of ballastless tracks etc. as per necessity, phasing
and feasibility and creation of city centre at the station in the long
term.
So far, 1337 stations have been identified for development under this
scheme, out of which 85 stations including Churu, Gogameri,
Ratangarh Jn., Sadulpur and Sujangarh stations of Churu Lok Sabha
Constituency, are located in Rajasthan. The names of stations
identified for development under Amrit Bharat Station Scheme in
Rajasthan are as following:
State No. of Name of Stations
Stations
Rajasthan 85 Abu Road, Ajmer, Alwar, Anupgarh, Asalpur
Jobner, Balotra, Bandikui, Baran, Barmer,
Bayana, Beawar, Bharatpur, Bhawani Mandi,State No. of Name of Stations
Stations
Bhilwara, Bijainagar, Bikaner, Bundi,
Chanderiya, Chhabra Gugor, Chittorgarh Jn.,
Churu, Dakaniya Talav, Dausa, Deeg,
Degana, Deshnoke, Dholpur, Didwana,
Dungarpur, Falna, Fatehnagar, Fatehpur
Shekhawati, Gandhinagar Jaipur, Gangapur
City, Gogameri, Gotan, Govind Garh,
Hanumangarh, Hindaun City, Jaipur Jn,
Jaisalmer, Jalor, Jawai Bandh, Jhalawar
City, Jhunjhunu, Jodhpur, Kapasan,
Khairthal, Kherli, Kota Jn, Lalgarh Jn,
Mandal Garh, Mandawar Mahwa Road,
Marwar Bhinmal, Marwar Jn, Mavli Jn, Merta
Road Jn, Nagaur, Naraina, Nim ka Thana,
Nokha, Pali Marwar, Phalodi Jn, Phulera Jn,
Pindwara, Rai singh nagar, Rajgarh,
Ramdevra, Ramganj Mandi Jn,
Ranapratapnagar, Rani, Ratangarh Jn, Ren,
Ringas, Sadulpur, Sanganer, Sawai
Madhopur, Shri Mahaveerji, Sikar, Sojat
Road, Somesar, Sri ganganagar, Sujangarh,
Suratgarh, Udaipur City
Development works at railway stations under Amrit Bharat Station
Scheme in Rajasthan have been taken up at a good pace. Till now,
works of 11 stations (Barmer, Bundi, Deshnoke, Fatehpur Shekhawati,Gogameri, Govind Garh, Jaisalmer, Khairthal, Mandal Garh, Mandawar
Mahwa Road, Rajgarh) in Rajasthan have been completed under this
scheme. The works at other stations have also been taken up at good
pace and progress of some of the above stations is as given below:
Churu station: The works of station building, platform shelter,
improvement of platform surface, waiting hall, toilet, circulating
area, parking, Divyangjan facilities and 12 m Foot Over Bridge have
been taken up.
Ratangarh Jn. station: The works of station building, platform
shelter, improvement of platform surface, waiting hall, toilet,
circulating area, parking, lighting, Divyangjan facilities and 12 m
Foot Over Bridge have been taken up.
Sadulpur station: The works of station building, platform shelter,
improvement of platform surface, waiting hall, toilet, circulating
area, parking and 12 m Foot Over Bridge have been taken up.
Sujangarh station: The works of station building, platform shelter,
improvement of platform surface, waiting hall, toilet, circulating
area, parking, Divyangjan facilities and 12 m Foot Over Bridge have
been taken up.
Bikaner station: The work of refurbishment of MFC building
except telecom side has been completed. The foundation work
of North side station building have been taken up.
Gandhinagar Jaipur station: The structural works of main and
second entry station building, works of launching of air
concourse and casting of deck slab have been completed. The
finishing works of main and second entry station building, works
of platform shelter and platform resurfacing have been taken up.
Jaipur Junction station: The structural works of second entrystation building and basement, foundation work of air concourse
and launching of Foot Over Bridge at Dausa end from platform 1
to platform 4&5 have been completed. The works of front
station building and basement, finishing works of second entry
station building and basement, fabrication, launching of air
concourse and Foot Over Bridge at Sikar end
have been taken up.
Udaipur City station: The structural work of East and West side
station building including basement has been completed. The
finishing works of East and West side station building including
basement have been taken up.
The details of expenditure incurred for development and maintenance
of stations are maintained Zonal Railway-wise under Plan Head-53
‘Customer Amenities’ and not work-wise or Station-wise. Rajasthan is
covered by five zones viz. Northern Railway, North Central Railway,
North Western Railway, Western Railway and West Central Railway.
For these zone, an allocation of ₹ 5,257 crore has been made for the
financial year 2025-26, out of which an expenditure of ₹ 2,829 crore
has been incurred so far.
Development / Upgradation of railway stations is complex in nature
involving safety of passengers & trains and requires various statutory
clearances such as fire clearance, heritage, tree cutting, airport
clearance etc. The progress also gets affected due to brownfield
related challenges such as shifting of utilities (involving water/sewage
lines, optical fibre cables, gas pipe lines, power/signal cables, etc.),
infringements, operation of trains without hindering passenger
movement, speed restrictions due to works carried out in closeproximity of tracks and high voltage power lines, etc. and these
factors affect the completion time. Therefore, no time frame can be
indicated at this stage.
Security:
Policing is a state subject under the seventh schedule of the
Constitution of India and accordingly, cases of unnatural deaths over
Indian Railways are registered and investigated by the concerned
police authorities, such as the Government Railway Police (GRP) or
the district police based on their jurisdiction. Data on all unnatural
deaths on Railway tracks is published by National Crime Record
Bureau (NCRB) in Accidental Deaths and Suicides in India (ADSI).
The following steps are being taken in coordination with GRP/Police
for the safety of passengers in any untoward incidents including death
due to falling from train:
Zonal Railways have constituted ‘Joint Committees’ comprising
officers of Safety, Security, Signal and Engineering departments to
study the causes and suggest specific measures to minimise
deaths due to untoward incidents including falling from train.
Accordingly, preventive and corrective measures are taken to
improve and create infrastructure to minimise casualties.
Regular announcements are made through Public Address System
at Railway stations urging passengers to use Foot Over Bridges
(FOBs) and to avoid crossing of railway tracks.
Legal action is taken against persons travelling on train rooftops,
footboards and other restricted places.
Short videos for passenger awareness are also displayed in Rail
Display Network at railway station. Various awareness campaigns are organized by Railways to
sensitize passengers about the fatalities of crossing railway tracks,
footboard/rooftop travelling, boarding/de-boarding running trains
etc.
Regular drives are conducted against trespassing, travelling on
footboard, steps, roof top of trains, boarding/de-boarding running
trains and the persons apprehended are prosecuted under the
relevant provisions of the Railways Act, 1989.
Warning sign boards are provided at conspicuous places for the
awareness of passengers.
*****