**Executive Summary**
This document is an answer to an unstarred question in Lok Sabha (number 1964) to be answered on 11.02.2026, regarding railway projects in the Yavatmal-Washim constituency of Maharashtra. It outlines current and proposed railway infrastructure projects, financial allocations, and station development under the Amrit Bharat Station Scheme. The response details various projects, their status, and factors affecting their completion.
**Key Points / Main Content**
* **Yavatmal-Washim Connectivity:**
* The Wardha - Yavatmal - Nanded new line (284 Km) has been sanctioned.
* The Wardha – Kalamb section (39 Km) has been commissioned, with work continuing on the remaining section.
* **Budget Allocation:**
* Budget allocation for infrastructure projects and safety works in Maharashtra has increased significantly.
* Budget allocation in 2009-14 was ₹1,171 crore/year.
* Budget allocation in 2025-26 is ₹23,778 crore.
* **New Track Commissioning:**
* New track commissioning/laying in Maharashtra (including Yavatmal – Washim) during 2009-14 and 2014-25:
* 2009-14: 292 Km commissioned at an average of 58.4 Km/year.
* 2014-25: 2,292 Km commissioned at an average of 208.4 Km/year.
* **Sanctioned Projects (as of 01.04.2025):**
* 38 projects (11 new line, 2 gauge conversion, and 25 doubling) sanctioned, totaling 5,098 km and costing ₹89,780 crore.
* New Line: 11 projects, 1,355 km, ₹10,504 crore expenditure up to March 2025.
* Gauge Conversion: 2 projects, 609 km, ₹4,286 crore expenditure up to March 2025.
* Doubling/Multitracking: 25 projects, 3,134 km, ₹24,617 crore expenditure up to March 2025.
* **Factors Affecting Project Completion:** Land acquisition, forest clearance, shifting utilities, statutory clearances, geological conditions, law and order, and working months.
* **Amrit Bharat Station Scheme:**
* 1337 stations identified nationwide for redevelopment, including 132 in Maharashtra.
* 17 stations in Maharashtra have completed development works under the scheme.
* **ROB/RUB Works:**
* Road Under Bridge work sanctioned in lieu of Level Crossing No. 111 on the Akola-Purna section.
* Detailed Project Reports sanctioned for 2 Level Crossings on the Akola – Purna section.
* 4,769 ROBs/RUBs sanctioned across Indian Railways at a cost of ₹1,14,298 crore, including 269 in Maharashtra at ₹5,599 crore.
* **Coaching Terminals:**
* New coaching terminals sanctioned at Jogeshwari and Vasai Road.
* Detailed Project Reports prepared for new coaching terminal at Parel and new satellite terminal at Lokmanya Tilak.
* **Monitoring Mechanism:**
* Indian Railways has a well-established mechanism to monitor project implementation through reviews, inspections, quality checks, and audits.
**Impact Analysis**
**Stakeholder: Passengers**
* **Impact:** Improved connectivity, enhanced station amenities, and increased safety.
* **Action Required:** Utilize the improved infrastructure and provide feedback on services.
**Stakeholder: Residents of Yavatmal-Washim Constituency**
* **Impact:** Enhanced railway infrastructure within their region, contributing to regional development.
* **Action Required:** Engage with local authorities to facilitate project implementation.
**Stakeholder: Maharashtra State Government**
* **Impact:** Required to cooperate in land acquisition, obtaining clearances, and ensuring law and order for project completion.
* **Action Required:** Expedite land acquisition, forestry, and wildlife clearances.
**Stakeholder: Indian Railways**
* **Impact:** Responsible for project execution, monitoring, and adherence to quality standards.
* **Action Required:** Continue monitoring project progress, allocate funds, and address challenges affecting completion.
Key Entities Referenced
Amrit Bharat Station Scheme: A railway station redevelopment scheme under which stations in the Yavatmal-Washim Lok Sabha Constituency are being developed.
Yavatmal-Washim Lok Sabha Constituency: A parliamentary constituency in Maharashtra, which is the focus of railway projects mentioned in the document.
Maharashtra: The state where the Yavatmal-Washim Lok Sabha Constituency is located and where the railway projects are being implemented.
Ministry of Railways: The central ministry responsible for the railway projects discussed in the document.
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 1964
TO BE ANSWERED ON 11.02.2026
RAILWAY PROJECTS IN YAVATMAL-WASHIM (MAHARASHTRA)
†1964. SHRI SANJAY UTTAMRAO DESHMUKH:
Will the Minister of RAILWAYS be pleased to state:
(a) the details of the major railway projects (such as station
redevelopment, new railway track/lines, doubling, bridges, Vande Bharat
train facility) currently underway or proposed in Yavatmal-Washim Lok
Sabha Constituency of Maharashtra;
(b) the details of the financial sanction, amount sanctioned, current status
(Detailed Project Report, land acquisition, under
construction/completed) and expected timeline for each project;
(c) the latest status of the stations in the Yavatmal-Washim Lok Sabha
Constituency under the Amrit Bharat Station Scheme along with the
details of the expenditure incurred so far;
(d) whether any new terminal station is proposed to be constructed in
Maharashtra and if so, the details thereof; and
(e) whether any special committee or review mechanism has been set up at
the Railway Board/DRM level to monitor these projects and if so, the
details thereof?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (e) The details of Railway infrastructure works taken up in Yavatmal –
Washim Lok Sabha Constituency of Maharashtra are as under:
To improve connectivity of Yavatmal – Washim Lok Sabha Constituency,
Wardha – Yavatmal – Nanded new line (284 Km) has been sanctioned.
Wardha – Kalamb section (39 Km) has been commissioned and work on the
balance section has been taken up.
§Budget allocation during the last five years has increased significantly.
Budget allocation for infrastructure projects and safety works, falling
fully/partly in Maharashtra (including Yavatmal – Washim Lok Sabha
Constituency) is as under:
Period Outlay
2009-14 ₹1,171 crore/year
2025-26 ₹23,778 crore (more than 20 times)
The details of commissioning/laying of new track falling fully/partly in
Maharashtra (including Yavatmal – Washim Lok Sabha Constituency) during
2009-14 and 2014-25 is as under:
Average commissioning of new
Period New track Commissioned
tracks
2009-14 292 Km 58.4 Km/year
2014-25 2,292 Km 208.4 Km/year (More than 3 times)
As on 01.04.2025, 38 projects (11 new line, 02 gauge conversion and 25
doubling), of a total length of 5,098 km, costing ₹ 89,780 crore, falling
fully/partly in Maharashtra (including Yavatmal – Washim Lok Sabha
Constituency), are sanctioned. The summary is as under:
Length Expenditure
No. of Total
Commissioned Upto March,
Category sanctioned Length
Upto March, 2025
Projects (in Km)
2025 (Km) (₹ in Crore)
New Line 11 1,355 234 10,504
Gauge Conversion 02 609 334 4,286
Doubling/
25 3,134 1,792 24,617
Multitracking
Total 38 5,098 2,360 39,407
Completion of Railway project/s depends on various factors which include
the following: Land acquisition
Forest clearance
Shifting of infringing utilities
Statutory clearances from various authorities
Geological and topographical conditions of area
Law and order situation in the area of project site
Number of working months in a year for particular project site etc.
Regular follow up with State Governments and concerned authorities for
expeditious land acquisition, forestry and Wildlife clearances and for
resolving other issues pertaining to projects.
Station Development Projects
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations. So far, 1337 stations have been identified for
development under this scheme, out of which 132 stations including
Washim station of Yavatmal – Washim Lok Sabha Constituency, are located
in Maharashtra. The names of stations identified for development under
Amrit Bharat Station Scheme in Maharashtra are as following:
No. of
State Name of Stations
Stations
Maharashtra 132 Ahmednagar, Ajni (Nagpur), Akalkot Road,
Akola, Akurdi, Amalner, Amgaon, Amravati,
Andheri, Badnera, Balharshah, Bandra
Terminus, Baramati, Belapur, Bhandara Road,
Bhokar, Bhusawal, Borivali, Byculla,
Chalisgaon, Chanda Fort, Chandrapur, Charni
Road, Chhatrapati Sambhajinagar,
Chhatrapati Shivaji Maharaj Terminus,
Chinchpokli, Chinchwad, Dadar (CR), Dadar
(WR), Dahisar, Daund, Dehu Road, Devlali,
Dhamangaon, Dharangaon, Dharashiv,
Dharmabad , Dhule, Diva, Dudhani,
Gangakher , Godhani, Gondia, Grant Road,
Hadapsar, Hatkanangale, Hazur Sahib
Nanded, Himayatnagar, Hinganghat, HingoliNo. of
State Name of Stations
Stations
Deccan, Igatpuri, Jalgaon, Jalna, Jeur,
Jogeshwari, Kalyan Jn, Kamptee, Kandivali,
Kanjur Marg, Karad, Katol, Kedgaon, Kinwat ,
Kopargaon, Kurduwadi Jn, Kurla Jn,
Lasalgaon, Latur, Lokmanya Tilak Terminus,
Lonand Jn, Lonavla, Lower Parel, Malad,
Malkapur, Manmad Jn, Manwath Road ,
Marine Lines, Matunga, Miraj Jn, Mudkhed Jn,
Mumbai Central, Mumbra, Murtizapur Jn,
Nagarsol , Nagpur Jn, Nandgaon, Nandura,
Nandurbar, Narkher Jn, Nashik Road, Netaji
Subhash Chandra Bose Itwari Junction,
Pachora Jn, Palghar, Pandharpur, Panvel Jn,
Parbhani Jn, Parel, Parli Vaijnath, Partur,
Phaltan, Prabhadevi, Pulgaon Jn, Pune Jn,
Purna Jn, Raver, Rotegaon, Sainagar Shirdi,
Sandhurst Road, Sangli, Satara, Savda, Selu ,
Sewagram, Shahad, Shegaon, Shivaji Nagar
Pune, Shri Chhatrapati Shahu Maharaj
Terminus Kolhapur, Solapur, Talegaon,
Thakurli, Thane, Titvala, Tumsar Road, Umri,
Uruli, Vadala Road, Vidyavihar, Vikhroli,
Wadsa, Wardha, Washim, Wathar
Development works at railway stations under Amrit Bharat Station Scheme
in Maharashtra have been taken up at a good pace. Till now, works of 17
stations (Amgaon, Baramati, Chanda Fort, Chinchpokli, Devlali, Dhule,
Kedgaon, Lasalgaon, Lonand Jn, Matunga, Murtizapur Jn, Nandura, Netaji
Subhash Chandra Bose Itwari Junction, Parel, Savda, Shahad and Vadala
Road) in Maharashtra have been completed under this scheme.
The works at other stations have also been taken up at good pace and
progress of some of above stations is as given below:
Washim station: The works of improvement of station building, porch,
improvement of platforms, platform shelter, improvement of waitinghall, toilet, circulating area, lift and 12 m Foot Over Bridge have been
taken up.
Manwath Road station: The work of platform shelter has been
completed. The works of improvement to station building, entrance
porch, platform surfacing, waiting hall, toilet and lift have been taken
up.
Parbhani Junction station: The structural works of new station
building, platform shelter and 12 m Foot Over Bridge have been taken
up.
Partur station: The works of extension to station building, entrance
porch, platform shelter, platform surfacing, waiting hall, toilet,
circulating area, lift and 12 m Foot Over Bridge have been taken up.
Purna Junction station: The structural work of new station building,
platform shelter, platform surfacing, compound wall and 12 m Foot
Over Bridge have been taken up.
Selu station: The works of platform shelter, platform surfacing,
improvement of waiting hall, toilet, lift and 12 m Foot Over Bridge
have been taken up.
Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways is a continuous and ongoing process and works
in this regard are undertaken as per requirement, subject to inter-se
priority and availability of funds. Development / redevelopment /
upgradation / modernisation of a station is carried out based on category
of station/condition/traffic handled etc.
Amrit Bharat Station Scheme envisages development of stations on a
continuous basis with a long-term approach.
The scheme involves preparation of master plans and their implementation
in phases to improve the stations. The master planning includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement, water
booths
Provision of wider foot over bridge/air concourse commensurate with
passenger traffic
Provision of lift/escalators/ramp
Improvement /Provision of platform surface and cover over platforms
Provision of kiosks for local products through schemes like ‘One
Station One Product’
Parking areas, Multimodal integration
Amenities for Divyangjans
Better passenger information systems
Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity at each
station.
The scheme also envisages sustainable and environment friendly solutions,
provision of ballastless tracks etc. as per necessity, phasing and feasibility
and creation of city centre at the station in the long term.
Development / Upgradation of railway stations is complex in nature
involving safety of passengers & trains and requires various statutory
clearances such as fire clearance, heritage, tree cutting, airport clearance
etc. The progress also gets affected due to brownfield related challenges
such as shifting of utilities (involving water/sewage lines, optical fibre
cables, gas pipe lines, power/signal cables, etc.), infringements, operation
of trains without hindering passenger movement, speed restrictions due to
works carried out in close proximity of tracks and high voltage power lines,
etc. and these factors affect the completion time.
Development / Upgradation / Modernization of stations including under
Amrit Bharat Station Scheme is generally funded under Plan Head-53
‘Customer Amenities’. The details of allocation of funds for development
and maintenance of stations are maintained Zonal Railway-wise and not
Work-wise or Station-wise. Passenger amenities are generally funded under
Plan Head-53 ‘Customer Amenities’. Maharashtra is covered under the
jurisdiction of four Railway zones, namely, Central Railway, South Central
Railway, South East Central Railway and Western Railway. For these zones,
an allocation of ₹ 3,834 crore has been made for the financial year 2025-26,out of which an expenditure (up to December, 2025) of ₹ 3,122 crore has
been incurred so far.
ROB/RUB Works
A work for construction of Road Under Bridge in lieu of Level Crossing No.
111 at Km 813/6-7 between Kata Road – Washim station on Akola – Purna
section in Yavatmal – Washim Lok Sabha Constituency has been
sanctioned. The work is in progress. Boxes have been inserted under track
and the works of drain and retaining wall have been taken up.
Additionally, the works for preparation of Detailed Project Report have
been sanctioned for 02 nos. Level Crossings which includes Level Crossing
No. 102 at Km 796/4-5 between Amanwadi – Jaulkastation and Level
Crossing No. 113 at Km 816/6-7 between Kata Road – Washim stationon
Akola – Purna sectionin Yavatmal – Washim Lok Sabha Constituency.
Numbers of ROBs/ RUBs constructed on Indian Railways during the period
2004-14 vis-à-vis 2014-25 (upto December, 2025) is as under:
Period ROBs/ RUBs constructed
2004-14 4,148 Nos.
2014-25 (upto December, 2025) 13,882 Nos.
As on 01.01.2026, 4,769 nos. ROBs/RUBs are sanctioned at the cost of
₹ 1,14,298 crore on Indian Railways including 269 nos. at the cost of
₹ 5,599 crore in Maharashtra which are at various stages of planning and
execution.
Completion and commissioning of ROB/RUB works depends on various
factors like cooperation of State Governments in giving consent for
closure of Level Crossing, fixing of approach alignment, approval of
General Arrangement Drawing (GAD), land acquisition, removal of
encroachment, shifting of infringing utilities, statutory clearances from
various authorities, law and order situation in the area of project / work
sites, duration of working season in a year for the particular project / area
due to climatic conditions etc. All these factors affect the completion time
of the projects / works.Coaching Terminals in Maharashtra
New coaching terminals at Jogeshwari and Vasai Road have been
sanctioned.
Further, the Detailed Project Report (DPR) of new coaching terminal at
Parel and new satellite terminal at Lokmanya Tilak have been prepared.
Indian Railways has a well established mechanism to monitor
implementation of projects including their reviews, inspection, check for
quality of works and audits. Works are carried out adhering to the
standards and specifications laid down in various codes and manuals.
Inspections/audits/checks are carried out from time to time by various
agencies/officials/multi-disciplinary teams as per laid down instructions
and actions for correction including damages are taken immediately. This
is a continuous and ongoing process.
*****