(a) whether any timeline has been fixed for completion of the ongoing
works at railway stations under the Amrit Bharat Station Scheme in the
country particularly in Varanasi district of Uttar Pradesh;
(b) if so, the details thereof and if not, the reasons therefor;
(c) the time by which the redevelopment work is being carried out at
Majhwar station in Chandauli district under the scheme;
(d) the estimated time likely to be taken for completion of the said work;
(e) whether the Government proposes to operate any Vande Bharat train
from Chandauli district to Delhi as the Chandauli Majhwar is the station
for the district headquarters Chandauli in Uttar Pradesh; and
(f) if so, the details thereof and if not, the reasons therefor?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (f): A Statement is laid on the Table of the House.
*****
§STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (f) OF STARRED
QUESTION NO.471 TO BE ANSWERED ON 25.03.2026 IN LOK SABHA
(a) to (f) Ministry of Railways has launched Amrit Bharat Station Scheme
for redevelopment of stations with a long-term approach. So far, 1,338
stations have been identified for development under this scheme, out of
which, 157 stations including Chandauli Majhwar, Pt. Deen Dayal Upadhyay
Jn. and Vyasnagar stations of Chandauli district and Babatpur, Banaras,
Kashi, Lohta, Shivpur, Varanasi Cantt. and Varanasi City stations of
Varanasi district, are located in Uttar Pradesh. The names of stations
identified for development under Amrit Bharat Station Scheme in Uttar
Pradesh are as following:
No. of
State Names of Stations
Stations
Uttar 157 Achnera, Agra Cantt., Agra Fort, Aishbagh Jn,
Pradesh Akbarpur Jn, Aligarh, Amethi, Amroha, Anand
Nagar Jn., Aonla, Ayodhya Dham Junction,
Azamgarh, Babatpur, Bachhrawan, Badaun,
Badshahnagar, Badshahpur, Baheri, Bahraich,
Balamau Jn., Ballia, Balrampur, Banaras,
Banda, Barabanki Jn, Bareilly, Bareilly City,
Barhni, Basti, Belthara Road, Bhadohi,
Bharatkund, Bhatni, Bhuteshwar, Bijnor,
Bulandsahar, Chandauli Majhwar, Chandausi,
Chilbila, Chitrakut dham karwi, Chopan, Chunar
Jn., Daliganj, Darshannagar, Deoria Sadar,
Dhampur, Dildarnagar, Etawah Jn.,
Farrukhabad, Fatehabad, Fatehpur, Fatehpur
Sikri, Firozabad, Gajraula, Garhmuktesar,
Page 1 of 8No. of
State Names of Stations
Stations
Gauriganj, Ghatampur, Ghaziabad, Ghazipur
City, Gola Gokarnath, Gomtinagar, Gonda,
Gorakhpur, Govardhan, Govindpuri,
Gursahaiganj, Haidergarh, Hapur, Hardoi,
Hathras City, Idgah Agra Jn, Izzatnagar, Janghai
Jn, Jaunpur City, Jaunpur Jn, Kannauj, Kanpur
Anwarganj, Kanpur Bridge Left Bank, Kanpur
Central, Kaptanganj Jn, Kasganj Jn, Kashi,
Khalilabad, Khorason road, Khurja Jn., Kosi
Kalan, Kunda Harnamganj, Lakhimpur, Lalganj,
Lalitpur Jn, Lambhua, Lohta, Lucknow
(Charbagh) NR, Lucknow city, Lucknow Jn.
(NER), Maa Belha Devi Pratapgarh Junction,
Maghar, Maharaja Bijli Pasi, Mahoba Jn, Mailani
Jn, Mainpuri Jn, Malhaur, Manak Nagar,
Manikpur Jn, Mariahu, Mathura Jn, Mau Jn,
Meerut City Jn, Mirzapur, Modinagar,
Mohanlalganj, Moradabad Jn, Muzaffarnagar,
Nagina, Najibabad Jn, Orai, Panki Dham,
Phaphamau Jn, Phulpur, Pilibhit Jn, Pokhrayan,
Prayag Jn, Prayagraj Jn, Pt. Deen Dayal
Upadhyay Jn , Rae Bareli Jn, Raja Ki Mandi,
Ramghat Halt, Rampur Jn, Renukoot,
Saharanpur Jn., Salempur, Seohara, Shahganj
Jn, Shahjahanpur, Shamli, Shikohabad Jn.,
Shivpur, Siddharth nagar, Sitapur Jn.,
Sonbhadra, Sri Krishna Nagar, Sultanpur Jn,
Page 2 of 8No. of
State Names of Stations
Stations
Suraimanpur, Swaminarayan Chappia, Takia,
Tulsipur, Tundla Jn., Ujhani, Unchahar, Unnao
Jn, Utraitia Jn, Varanasi Cantt., Varanasi City,
Vindhyachal, Virangana Lakshmibai Jhansi,
Vyasnagar, Zafarabad
Completed stations:
Development works at railway stations under Amrit Bharat Station
Scheme in Uttar Pradesh have been taken up at a good pace. Till now,
23 stations in Uttar Pradesh have been completed. The name of
stations completed in Uttar Pradesh are as following :
State No. of Name of stations
stations
Uttar 23 Ayodhya Dham Junction, Balrampur, Bareilly
Pradesh City, Bijnor, Fatehabad, Fatehpur, Gola
Gokarnath, Gomtinagar, Govardhan, Govindpuri,
Hathras City, Idgah Agra Jn, Izzatnagar,
Khalilabad, Mailani Jn, Panki Dham, Pokhrayan,
Ramghat Halt, Saharanpur Jn., Siddharth Nagar,
Suraimanpur, Swaminarayan Chappia, Ujhani
The activities for development at other stations have also been taken up at
good pace and progress of some of the stations is as given below:
Chandauli District:
Page 3 of 8 Chandauli Majhwar station: The works of improvement of existing
station building, platform raising and extension of platform no. 1 &
4/5, toilet, circulating area and parking have been completed. The
works of 6 m Foot Over Bridge, platform shelter and platform
surfacing of platform no. 1 & 4/5 have been taken up.
Vyasnagar station: The structural work of station building has been
completed. The works of circulating area, parking and finishing of
station building have been taken up.
Pt. Deen Dayal Upadhyay Jn. station: Pt. Deen Dayal Upadhyay Jn.
station is under Master planning stage. Master Planning is an iterative
process requiring optimization and the time frame and other details
for such optimization cannot be indicated at this stage.
Varanasi District:
Babatpur station: The works of station building at second entry,
circulating area, parking, platform shelter, platform raising and
platform surfacing have been taken up.
Banaras station: The works of improvement of existing station
building, porch, boundary wall, circulating area, parking, waiting
hall/room, toilet and platform shelter have been completed. The work
of 12 m Foot Over Bridge has been taken up.
Shivpur station: The works of boundary wall and Reinforced Cement
Concrete overhead tank have been completed. The works of
improvement of station building, portico, platform shelter, circulating
area and parking have been taken up.
Page 4 of 8 Varanasi City station: The works of improvement of station building,
porch, toilet, lift on existing Foot Over Bridge at platform no. 2/3 and
4/5, approach road and boundary wall have been completed. The
works of platform shelter 12 m Foot Over Bridge and Divyangjan
facilities have been taken up.
Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways is a continuous and ongoing process and works
in this regard are undertaken as per requirement, subject to inter-se
priority and availability of funds. Development / redevelopment /
upgradation / modernisation of a station is carried out based on category
of station/condition/traffic handled etc.
Amrit Bharat Station Scheme involves preparation of master plans and their
implementation in phases to improve the stations. The master planning
includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement, water
booths
Provision of wider foot over bridge/air concourse commensurate with
passenger traffic
Provision of lift/escalators/ramp
Improvement /Provision of platform surface and cover over platforms
Provision of kiosks for local products through schemes like ‘One
Station One Product’
Parking areas, Multimodal integration
Page 5 of 8 Amenities for Divyangjans
Better passenger information systems
Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity at each
station.
The scheme also envisages sustainable and environment friendly solutions,
provision of ballastless tracks etc. as per necessity, phasing and feasibility
and creation of city centre at the station in the long term.
Development / Upgradation of railway stations is complex in nature
involving safety of passengers & trains and requires various statutory
clearances such as fire clearance, heritage, tree cutting, airport clearance
etc. The progress also gets affected due to brownfield related challenges
such as shifting of utilities (involving water/sewage lines, optical fibre
cables, gas pipe lines, power/signal cables, etc.), infringements, operation
of trains without hindering passenger movement, speed restrictions due to
works carried out in close proximity of tracks and high voltage power lines,
etc. and these factors affect the completion time.
Development / upgradation / modernisation of stations including under
Amrit Bharat Station Scheme is generally funded under Plan Head-53
‘Customer Amenities’. The details of allocation and expenditure under Plan
Head-53 are maintained Zonal Railway-wise and not work-wise, or station-
wise, or constituency wise or state-wise. Uttar Pradesh is covered under
the jurisdiction of five railway zones, namely East Central Railway,
Northern Railway, North Central Railway, North Eastern Railway and West
Central Railway. For these zones, an allocation of ₹ 3,794 crore (Revised
Estimate) has been made for the financial year 2025-26, out of which an
Page 6 of 8expenditure (up to February, 2026) of ₹ 3,694 crore has been incurred so
far.
Train Services:
Chandauli Majhwar is presently served by 12 train services including the
daily service of 12397/12398 Gaya-New Delhi Mahabodhi Express which is
catering to the needs of Chandauli Majhwar-Delhi sector. The list of trains
serving Chandauli Majhwar is given below:-
SN Train No. & Name
1 12397 Gaya-New Delhi Express
2 12398 New Delhi-Gaya Express
3 13009 Howrah-Yog Nagari Rishikesh Express
4 13010 Yog Nagari Rishikesh-Howrah Express
5 13553 Asansol -Varanasi Express
6 13554 Varanasi-Asansol Express
7 63293 DehriOn Sone-Pt.Deen Dayal Upadhyaya MEMU
8 63294 Pt. Deen Dayal Upadhyaya –Dehri On Sone MEMU
9 63295 Gaya Jn-Pt. Deen Dayal Upadhyaya MEMU
10 63296 Pt. Deen Dayal Upadhyaya -Gaya MEMU
11 63557 Barkakana-Varanasi MEMU
12 63558 Varanasi-Barkakana MEMU
Besides, introduction of train services, including Vande Bharat services, on
any route/section, is an on-going process, which depends on various factors
including:
Capacity of that section.
Availability of path.
Page 7 of 8 Availability of required rolling stock.
Availability of matching infrastructure for rolling stock.
Maintenance requirement of railway tracks and other assets.
*****
Page 8 of 8