GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 6034
TO BE ANSWERED ON 01.04.2026
REDEVELOPMENT OF TIRUNELVELI JUNCTION RAILWAY STATION
6034. SHRI ROBERT BRUCE C:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Government is aware of the fact that the redevelopment of
Tirunelveli Junction Railway Station was announced originally at an
outlay of Rs. 270 crores which was reduced to Rs. 99 crores which was
further curtailed to Rs. 77 Crore and if so, the details thereof;
(b) the details of the reasons of such lopsided and reduced allocation of
funds; and
(c) the details of such other railway stations for which the final expenditure
was less than the originally announced outlay and if so, the details
thereof?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (c): Tirunelveli Junction railway station has been identified for
redevelopment under Amrit Bharat Station Scheme.
At Tirunelveli Railway station, the works for improvement of platform
surface, concourse area flooring, construction of platform shelters,
provision of pay & use toilets, quick watering system for coaches at
platform, provision of recycling plant, station building lighting and provision
of water cubicles have been completed in recent years. The works for
construction of new platform no. 6 has been taken up.
§ Page 1 of 6The redevelopment work of Tirunelveli junction railway station has been
sanctioned under Amrit Bharat Station scheme. The redevelopment work of
Tirunelveli station envisage east and west terminal buildings, spacious foot
over bridge, up-gradation of platforms, parcel office, RMS office, circulating
area and surface parking etc.
The works of soil investigation and construction of site office have
been taken up.
The Amrit Bharat Station scheme envisages development of stations on a
continuous basis with a long-term approach. The scheme involves
preparation of master plans and their implementation in phases to
improve the stations. The master planning, keeping in view the
necessity at each station includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement, water
booths
Provision of wider foot over bridge/air concourse commensurate
with passenger traffic
Provision of lift/escalators/ramp
Improvement /Provision of platform surface and cover over
platforms
Provision of kiosks for local products through schemes like ‘One
Station One Product’
Parking areas, Multimodal integration
Amenities for Divyangjans
Better passenger information systems
Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc.
Page 2 of 6The scheme also envisages improvement of building, integrating the
station with both sides of the city, multimodal integration, amenities for
Divyangjans, sustainable and environment friendly solutions, provision of
ballastless tracks, etc. as per necessity, phasing and feasibility and
creation of city centre at the station in the long term.
Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways is a continuous and ongoing process and works
in this regard are undertaken as per requirement, subject to inter-se
priority and availability of funds. Development / redevelopment /
upgradation / modernisation of a station is carried out based on category
of station/condition/traffic handled etc.
So far, 1,338 stations have been identified for development under the Amrit
Bharat Station Scheme. Out of these, 77 stations are located in Tamil
Nadu. The name of stations identified under Amrit Bharat Station
Scheme in Tamil Nadu is as following:
No. of
State Name of Stations
Stations
Tamil Nadu 77 Ambasamudram, Ambattur, ArakkonamJn,
Ariyalur, Avadi, Bommidi, Chengalpattu Jn,
Chennai Beach, Chennai Egmore, Chennai
Park, Chidambaram, Chinna Salem, Chrompet,
Coimbatore Jn, Coimbatore North, Coonoor,
Dharmapuri, Dindigul, Erode Jn., Guduvancheri,
Guindy, Gummidipundi, Hosur, JolarpettaiJn,
Kanniyakumari Terminus, KaraikkudiJn,
KarurJn, KatpadiJn, Kovilpatti, Kulitturai,
Kumbakonam, Lalgudi, Madurai Jn, Mambalam,
Page 3 of 6No. of
State Name of Stations
Stations
Manaparai, Mannargudi, MayiladuturaiJn,
Mettupalayam, Morappur, Nagercoil Jn,
Namakkal, Palani, Paramakkudi, Perambur,
Podanur Jn., Pollachi Jn, Polur, Pudukkottai,
Puratchi Thalaivar Dr. M.G. Ramachandran
Central, Rajapalayam, Ramanathapuram,
Rameswaram, Salem, Samalpatti,
Sholavandan, Srirangam, Srivilliputtur, St.
Thomas Mount, Tambaram, Tenkasi, Thanjavur
Jn, Thiruvarur Jn., Tiruchendur, Tirunelveli Jn,
Tirupadripulyur, Tirupattur, Tiruppur,
Tirusulam, Tiruttani, Tiruvallur,
Tiruvannamalai, Tuticorin, Udagamandalam,
Vellore Cantt., Villupuram Jn., Virudhunagar,
Vriddhachalam Jn.
Completed stations:
Development works at railway stations under Amrit Bharat Station
Scheme in Tamil Nadu have been taken up at a good pace. Till now,
works of 23 stations (Bommidi, Chennai Park, Chidambaram, Chinna
Salem, Coonoor, Karaikkudi Jn, Kulitturai, Mambalam, Manaparai,
Mannargudi, Morappur, Namakkal, Pollachi Jn, Polur, Samalpatti,
Sholavandan, Srirangam, Srivilliputtur, St.Thomas Mount, Thiruvarur Jn.,
Tiruvannamalai, Udagamandalam, Vriddhachalam Jn.) in Tamil Nadu have
been completed under this scheme.
Page 4 of 6The activities for development at other stations have also been taken up at
good pace and progress of some of the above stations is as given below:
Palani station: The works of improvement of station building, platform
shelter, waiting hall, toilet, circulating area, parking, entry/exit arch, lift
at existing Foot Over Bridge, coach indication board and train indication
board have been completed. The works of Divyangjan facilities and 6 m
Foot Over Bridge have been taken up.
Virudhunagar Junction station: The works of circulating area, parking,
entry/exit arch, Divyangjan facilities, coach indication board and train
indication board have been completed. The works of improvement of
station building and 6 m Foot Over Bridge have been taken up.
Karur Junction station: The works of improvement of station building,
main entrance arch, AC waiting hall, toilet at platform no. 1, 2/3 & 4/5,
circulating area and parking have been completed. The works of lift,
escalator and 12 m Foot Over Bridge have been taken up.
Thanjavur Junction station: The works of portico, improvement of
concourse, platform shelter, improvement of booking office, circulating
area, exit arch and signages have been completed. The works of
parking, lift, escalator, coach indication board and train indication board
have been taken up.
Villupuram Junction station: The works of new arrival building, platform
shelter, improvement of platform surface, booking counter, parcel
office, improvement of parking and signages have been completed. The
works of improvement of concourse, circulating area, parking, entrance
arch, coach indication board, train indication board, escalator and 6 m
Foot Over Bridge have been taken up.
Page 5 of 6Development / upgradation of stations including under Amrit Bharat Station
Scheme is generally funded under Plan Head-53 ‘Customer Amenities’. The
details of allocation under Plan Head-53 are maintained Zonal Railway-wise
and not station-wise or State-wise. Tirunelveli railway station falls under
the jurisdiction of Southern Railway for which a total allocation of
Rs. 1125.48 crores (Revised Estimate) has been made for the financial year
2025-26 under Plan Head-53.
Further, development/redevelopment/upgradation of Railway Stations is
complex in nature involving safety of passengers & trains and requires
various statutory clearances such as fire clearance, heritage, tree cutting,
airport clearance etc. The progress also gets affected due to brown field
related challenges such as shifting of utilities, (involving water/sewage
lines, optical fiber cables, gas pipe lines, power/signal cables etc.)
infringements, operation of trains without hindering passenger movement,
speed restrictions due to works carried out in close proximity of high
voltage power lines etc. and these factors affect the completion time.
*****