See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
STARRED QUESTION NO. 461
TO BE ANSWERED ON 25.03.2026
REVIEW OF OVERCROWDING IN LONG DISTANCE TRAINS
†*461. SHRI RAJESH RANJAN:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Government has carried out any detailed review of the
situation of ever- increasing waiting list and overcrowding in long-
distance trains during the last five years and if so, the details thereof;
(b) the details of the number of passengers waitlisted and the additional
capacity created during the said period especially on routes connecting
Eastern States particularly in Bihar, State/UT and route-wise;
(c) whether the gaps have been identified between the increase in
passenger demand and rail capacity expansion and if so, the details
thereof;
(d) the reasons for the continued shortage of confirmed tickets despite
record railway revenues; and
(e) the details of monitoring and evaluation mechanisms established for
periodical assessment of passenger capacity and service availability?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (e): A Statement is laid on the Table of the House.
*****
§STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (e) OF STARRED
QUESTION NO.461 TO BE ANSWERED ON 25.03.2026 IN LOK SABHA
(a) to (e): On Indian Railways, occupancy pattern of trains varies over lean
and peak periods. During peak rush periods, the occupancy of the trains
especially on popular routes remains full whereas during lean period and
on less popular routes, there is sub optimal utilization.
Waiting list pattern is monitored on regular basis and to cater to
additional demand, Indian Railways have taken various steps like
introduction of new trains, increase in frequency/extension of existing
trains, augmentation of load of existing trains on permanent basis, etc.
Further, waiting list limits have been rationalized linking it to the extent of
accommodation of that class available in the train.
During the last five years from 2021-22 to 2025-26 (up to Feb’2026), 1024
trains were introduced, 907 were extended, frequency of 168 trains was
increased and 4651 coaches were augmented. As the Railway network
straddles across state boundaries, trains are introduced, as per network
requirement, across such boundaries. However, on originating/terminating
basis, Indian Railways during 2021-22 to 2025-26 (Feb’2026) have
introduced 444 train services catering to the needs of various stations
located in the Eastern/North Eastern region including following 75 pair
trains serving the stations falling in the state of Bihar:-
S.No. Train No. & Name
1 11015/11016 Lokmanya Tilak(T)-Saharsa Amrit Bharat Express
2 13212/13211 Danapur-Jogbani Express
3 13213/13214 Jogbani-Saharsa Express
4 13229/13230 Rajendra Nagar-Godda Express
5 13251/13252 Patna-Anand Vihar(T) Express
6 13334/13333 Patna-Dumka Express
Page 1 of 297 13697/13698 Gaya-Delhi Amrit Bharat Express
8 14048/14047 Delhi-Sitamarhi Amrit Bharat Express
9 14628/14627 Chheharta-Saharsa Amrit Bharat Express
10 15133/15134 Chhapra-Anand Vihar (T) Amrit Bharat Express
11 15135/15136 Chhapra-Amritsar Express
12 15293/15294 Muzaffarpur-Charlapalli Amrit Bharat Express
13 15501/15502 Raxaul-Jogbani Express
14 15505/15506 Saharsa-Patliputra Express
15 15507/15508 Darbhanga-Patliputra Express
16 15555/15556 Bapudham Motihari-Patliputra MEMU
17 15557/15558 Darbhanga-Anand Vihar(T) Amrit Bharat Express
18 15561/15562 Darbhanga-Gomti Nagar Amrit Bharat Express
19 15567/15568 Bapudham Motihari-Anand Vihar (T) Amrit Bharat
Express
20 15589/15590 Muzaffarpur-Hadapsar Express
21 15701/15702 Katihar -Siliguri Express
22 15723/15724 Jogbani-Siliguri Express
23 16601/16602 Erode-Jogbani Amrit Bharat Express
24 18119/18120 Tatanagar-Jaynagar Express
25 19623/19624 Madar-Darbhanga Amrit Bharat Express
26 19801/19802 Sogaria Cabin-Danapur Express
27 20893/20894 Tatanagar-Patna Vande Bharat Express
28 21893/21894 Tatanagar-Patna Vande Bharat Express
29 21895/21896 Tatanagar-Patna Vande Bharat Express
30 22233/22234 New Jalpaiguri-Patna Vande Bharat Express
31 22303/22304 Howrah-Gaya Vande Bharat Express
32 22309/22310 Howrah-Bhagalpur Vande Bharat Express
33 22345/22346 Patna-Gomti Nagar Vande Bharat Express
34 22347/22348 Howrah-Patna Vande Bharat Express
Page 2 of 2935 22349/22350 Patna-Ranchi Vande Bharat Express
36 22357/22358 Gaya-Lokmanya Tilak(T) Express
37 22361/22362 Rajendra Nagar-New Delhi Amrit Bharat Express
38 26301/26302 Jogbani-Danapur Vande Bharat Express
39 26501/26502 Gorakhpur-Patliputra Vande Bharat Express
40 53201/53202 Patna-Buxar Passenger
41 53203/53204 Jhajha-Danapur Passenger
42 53237/53238 Gaya-Patna jn. Passenger
43 53239/53240 Gaya-Patna jn. Passenger
44 53241/53242 Gawnaha-Narkatiaganj jn. Passenger
45 55037/55038 Siwan-Thawe Passenger
46 55121/55122 Siwan-Samastipur Passenger
47 55501/55502 Jhanjharpur-Laukaha Bazar Passenger
48 55503/55504 Jhanjharpur-Laukaha Bazar Passenger
49 55583/55584 Raxaul jn.-Narkatiaganj jn. Passenger
50 63273/63274 Rajgir-Patna MEMU
51 63275/63276 Kiul-Patna MEMU
52 63329/63330 Gaya-Patliputra MEMU
53 63331/63332 Kiul-Mokama MEMU
54 63333/63334 Patliputra-Ballia MEMU
55 63357/63358 Fatuha-Hilsa MEMU
56 63359/63360 Saharsa-Dauram Madhepura MEMU
57 63361/63362 Narkatiaganj-Gauhana MEMU
58 63375/63376 Saharsa-Supaul MEMU
59 63377/63378 Laheria Sarai-Saharsa DEMU
60 63379/63380 Laheria Sarai-Saharsa DEMU
61 63381/63382 Laheria Sarai-Saharsa DEMU
62 63383/63384 Vaishali-Koderma MEMU
63 63389/63390 Nawada-Patna MEMU
Page 3 of 2964 63411/63412 Sahibganj-Bhagalpur MEMU
65 73433/73434 Sultanganj-Deoghar DEMU
66 75213/75214 Raxaul jn.-Mehsi MEMU Special MEMU
67 75215/75216 Raxaul jn.-Jaynagar Passenger
68 75221/75222 Sonpur jn.-Vaishali DEMU
69 75223/75224 Bihariganj-Purnea Court DEMU
70 75225/75226 Saharsa-Purnea Court DEMU
71 75249/75250 Saharsa-Amha Pipra DEMU
72 75251/75252 Saharsa-Samastipur jn. DEMU
73 75273/75274 Islampur-Patna DEMU
74 75751/75752 Telta-Radhikapur DEMU
75 94803/94804 Jaynagar-Patna jn. Namo Bharat Rapid Rail
Express
With a view to meet the demand of passengers travelling in unreserved
coaches, Railways have significantly increased the facilities for
passengers demanding general class travel. During the last financial year
2024-25 alone, 1250 general coaches have been utilised in various long-
distance trains. In the current financial year (upto February, 2026), 860
Coaches have been utilised for permanent augmentation.
To cater to the travel demand of the low and middle income families,
Indian Railways have taken up manufacturing of 17,000 non-AC coaches
(general/sleeper).
On IR, the percentage of non-AC coaches, is about 70% as indicated
below:
Page 4 of 29Table 1: Distribution of coaches:
Non-AC coaches (general and ~62,000 ~70%
sleeper)
AC coaches ~27,000 ~30%
Total coaches ~89,000 100%
Due to higher availability of general coaches, the number of passengers
traveling in general/ unreserved coaches has shown an increasing trend as
shown below:
Table 2: Passengers in general/unreserved coaches:
Year No. of Passengers
2020-21 99 Cr (Covid year)
2021-22 275 Cr (Covid year)
2022-23 553 Cr
2023-24 609 Cr
2024-25 651 Cr
The number of seats available for non-AC passengers has also increased.
The current composition is as follows:
Table 3: Distribution of seats:
Non-AC seats ~ 54 lakhs ~ 78%
AC seats ~ 15 lakhs ~ 22%
Total ~ 69 lakhs 100%
Page 5 of 29Moreover, to provide greater accommodation for the passengers using
General and non-AC Sleeper Coaches, the extant policy regarding
composition of Mail/Express trains provides for 12 (Twelve) General class &
Sleeper class non- AC coaches and 08 (eight) AC-Coaches, in a train of 22
coaches, thereby providing greater accommodation for the passengers
using General and non-AC Sleeper Coaches.
Further, to cater to the needs of passengers desirous of availing
unreserved accommodation, Indian Railways (IR) operate unreserved non-
AC passenger trains/ MEMU / EMU etc. for affordable travel, which are in
addition to the unreserved accommodation (coaches) available in
Mail/Express services.
With a view to providing affordable, good quality services to all sections
of the society, Indian Railways has developed different types of trains,
some of which are as under: -
Vande Bharat services:
Indian Railways, with a view to improve travel experience of the
passengers, have introduced indigenously designed and manufactured
Vande Bharat trains (Chair Car/Sleeper) with modern coaches, advanced
safety features and passenger amenities.
Vande Bharat (Chair Car) Train service:
These new Vande Bharat Chair Car Trains have following features:
● Jerk Free Semi-Permanent couplers.
● Fitted with KAVACH.
● Centrally controlled Automatic Plug Doors and Fully Sealed wider
gangways.
● Emergency Alarm Push buttons and Talk Back Units on all Coaches.
Page 6 of 29● Improved fire safety – Aerosol based fire detection and suppression
system in electrical cabinets and lavatories.
● Higher acceleration with design/operating speed of 180/160 KMPH.
● Driver-Guard communication with voice recording facility & Crash
hardened memory.
● Air conditioning units provided with indigenously developed UV-C
lamp based disinfection system for deactivating 99% harmful bacteria
from conditioned air to improve the hygiene standards inside the
passenger area.
● Better Ride Comfort.
● CCTVs in all Coaches.
● For Divyangjan passengers, special lavatory in the driving coaches on
each end.
● Coach Condition Monitoring System (CCMS) display with remote
monitoring.
As on 15.03.2026, the following 162 (81 pairs) Vande Bharat train
services (Chair Car) are being operated on the Indian Railways network:
S.No. Train No. and Name
1 22435/22436 New Delhi - Varanasi Vande Bharat Express
2 22439/22440 Sri Mata Vaishno Devi Katra - New Delhi Vande
Bharat Express
3 20901/20902 Gandhinagar Capital - Mumbai Central Vande
Bharat Express
4 22447/22448 Amb Andura - New Delhi Vande Bharat Express
Page 7 of 295 20607/20608 Mysuru - MGR Chennai Central Vande Bharat
Express
6 20825/20826 Nagpur - Bilaspur Vande Bharat Express
7 22301/22302 New Jalpaiguri - Howrah Vande Bharat Express
8 20833/20834 Secunderabad - Visakhapatnam Vande Bharat
Express
9 22223/22224 Sainagar Shirdi - Chhatrapati Shivaji Maharaj (T)
Vande Bharat Express
10 22225/22226 Solapur - Chhatrapati Shivaji Maharaj (T) Vande
Bharat Express
11 20171/20172 Nizamuddin - Rani Kamlapati Vande Bharat
Express
12 20701/20702 Tirupati - Secunderabad Vande Bharat Express
13 20643/20644 Coimbatore - Chennai Vande Bharat Express
14 20977/20978 Chandigarh - Ajmer Vande Bharat Express
15 20633/20634 Thiruvananthapuram- Kasargod Vande Bharat
Express
16 22895/22896 Puri - Howrah Vande Bharat Express
17 22457/22458 Dehradun - Anand Vihar Vande Bharat Express
Page 8 of 2918 22227/22228 Guwahati - New Jalpaiguri Vande Bharat Express
19 20911/20912 Nagpur - Indore Vande Bharat Express
20 22229/22230 Madgaon - Chhatrapati Shivaji Maharaj (T) Vande
Bharat Express
21 22349/22350 Ranchi - Patna Vande Bharat Express
22 20661/20662 Dharwar - Bengaluru Vande Bharat Express
23 20173/20174 Rewa - Rani Kamlapati Vande Bharat Express
24 22549/22550 Gorakhpur - Prayagraj Vande Bharat Express
25 12461/12462 Sabarmati - Jodhpur Vande Bharat Express
26 22925/22926 Okha - Ahmedabad Vande Bharat Express
27 20665/20666 Tirunelveli - Chennai Egmore Vande Bharat
Express
28 20677/20678 Narsapur - Chennai Vande Bharat Express
29 20703/20704 Yesvantpur -Kacheguda Vande Bharat Express
30 20631/20632 Thiruvananthapuram- Mangaluru Vande Bharat
Express
31 26963/26964 Udaipur - Asarva Vande Bharat Express
Page 9 of 2932 22347/22348 Patna - Howrah Vande Bharat Express
33 20835/20836 Puri - Rourkela Vande Bharat Express
34 20897/20898 Ranchi - Howrah Vande Bharat Express
35 22415/22416 New Delhi - Varanasi Vande Bharat Express
36 20641/20642 Coimbatore - Bengaluru Cantt Vande Bharat
Express
37 20645/20646 Mangaluru - Madgaon Vande Bharat Express
38 20705/20706 Chhatrapati Shivaji Maharaj (T) - Nanded Vande
Bharat Express
39 22477/22478 Sri Mata Vaishno Devi Katra - New Delhi Vande
Bharat Express
40 22425/22426 Anand Vihar - Ayodhya Cantt. Vande Bharat
Express
41 22487/22488 Amritsar - Delhi Vande Bharat Express
42 22962/22961 Mumbai Central - Ahmedabad Vande Bharat
Express
43 20707/20708 Visakhapatnam - Secunderabad Vande Bharat
Express
44 20663/20664 Chennai - Mysuru Vande Bharat Express
Page 10 of 2945 22233/22234 Patna - New Jalpaiguri Vande Bharat Express
46 22470/22469 Khajuraho - Nizamuddin Vande Bharat Express
47 22231/22232 Bengaluru - Kalburagi Vande Bharat Express
48 20841/20842 Visakhapatnam - Bhubaneswar Vande Bharat
Express
49 22345/22346 Gomti Nagar - Patna Vande Bharat Express
50 20887/20888 Varanasi - Ranchi Vande Bharat Express
51 22545/22546 Dehradun - Lucknow Jn Vande Bharat Express
52 22490/22489 Varanasi - Meerut City Vande Bharat Express
53 20627/20628 Nagercoil - Chennai Egmore Vande Bharat
Express
54 20671/20672 Bengaluru Cantt - Madurai Vande Bharat Express
55 22500/22499 Deoghar - Varanasi Vande Bharat Express
56 22309/22310 Jamalpur - Howrah Vande Bharat Express
57 20871/20872 Rourkela - Howrah Vande Bharat Express
58 20893/20894 Patna - Tatanagar Vande Bharat Express
59 20892/20891 Tatanagar - Brahmapur Vande Bharat Express
Page 11 of 2960 22303/22304 Gaya - Howrah Vande Bharat Express
61 20669/20670 Pune - Hubballi Vande Bharat Express
62 20673/20674 Pune - Chhatrapati Shahu Maharaj (T) Vande
Bharat Express
63 20101/20102 Secunderabad - Nagpur Vande Bharat Express
64 20829/20830 Visakhapatnam - Durg Vande Bharat Express
65 21893/21894 Patna - Tatanagar Vande Bharat Express
66 21895/21896 Patna - Tatanagar Vande Bharat Express
67 20176/20175 Banaras - Agra Cantt. Vande Bharat Express
68 26901/26902 Veraval - Sabarmati Vande Bharat Express
69 26401/26402 Srinagar - Shri Mata Vaishno Devi Katra Vande
Bharat Express
70 26403/26404 Srinagar -Shri Mata Vaishno Devi Katra Vande
Bharat Express
71 26502/26501 Pataliputra - Gorakhpur Vande Bharat Express
72 26751/26752 KSR Bengaluru - Belagavi Vande Bharat Express
73 26406/26405 Amritsar - Shri Mata Vaishno Devi Katra Vande
Bharat Express
Page 12 of 2974 26101/26102 Pune - Ajni Vande Bharat Express
75 26302/26301 Jogbani - Danapur Vande Bharat Express
76 26481/26482 Delhi Cantt - Jodhpur Vande Bharat Express
77 26471/26472 Delhi Cantt - Bikaner Vande Bharat Express
78 26462/26461 Delhi - Firozpur Cantt. Vande Bharat Express
79 26651/26652 Ernakulam - KSR Bengaluru Vande Bharat
Express
80 26506/26505 Khajuraho - Banaras Vande Bharat Express
81 26504/26503 Saharanpur -Gomtinagar Vande Bharat Express
Vande Bharat Sleeper Train service:
With a view to providing comfortable journey with lesser transit time to
long distance travellers, the Sleeper variant of Vande Bharat Express has
been indigenously designed and developed.
Broad Technological advancements and safety features provided in these
Vande Bharat Sleeper Trains are as below:
• Jerk-Free Semi permanent couplers and Anti Climbers.
• Fitted with KAVACH.
• Higher acceleration with design/operating speed of 180/160 KMPH.
• Crashworthy Design of Car body complying with EN standards.
• Fire barrier doors at the end of each coach for compliance of Fire
Safety standards.
Page 13 of 29• Aerosol based fire detection and suppression system in electrical
cabinets and lavatories.
• Regenerative braking system for energy efficiency.
• Air conditioning units provided with indigenously developed UV-C
lamp based disinfection system for deactivating 99% harmful
bacteria from conditioned air to improve the hygiene standards
inside the passenger area.
• Centrally controlled Automatic Plug Doors and Fully Sealed wider
gangways.
• CCTVs in all coaches.
• Emergency talk-back unit for communication between Passenger
and Train Manager/Loco Pilot in case of emergency.
• For Divyangjan passengers, special lavatory in the driving coaches
on each end.
• Centralized Coach Monitoring System for better condition
monitoring of passenger amenities such as Air conditioning, Saloon
Lighting etc.
• Ergonomically designed ladder for ease of climbing on to upper
berths.
As on 15.03.2026, the following 02 Vande Bharat Sleeper Express are
being operated on the Indian Railways network:
S.No. Train No. and Name
1 27575/27576 Howrah - Kamakhya Vande Bharat Sleeper
Express
Amrit Bharat service:
To provide affordable means of transportation to the low and middle
income families, Indian Railways have introduced Amrit Bharat services
that are fully non-AC modern trains. As on 15.03.2026, 60 services are
Page 14 of 29already in operation. The present composition of Amrit Bharat consists of
11 General Class coaches, 8 Sleeper Class coaches, 01 Pantry Car and 02
Luggage cum Divyangjan coaches.
High Speed and enhanced Safety standards are the hallmarks of these
trains with following enhanced features and amenities:
● Better aesthetics of seat and berths with enhanced look & feel on the
lines of Vande Bharat Sleeper.
● Jerk Free Semi-Automatic Couplers.
● Improved Crashworthiness in coaches by provision of crash tube.
● Provision of CCTV system in all coaches.
● Improved designs of toilets.
● Improved design of Ladder for ease of climbing on to the berth.
● Improved LED Light fitting & Charging Sockets.
● Provision of EP assisted braking system.
● Aerosol based fire suppression system in toilets and electrical
cubicles.
● USB Type-A and Type-C mobile charging sockets.
● Emergency Talk Back system for two-way communication between
Passenger and Guard/Train Manager.
● Non-AC pantry with enhanced heating capacity.
● Fully sealed gangways with quick release mechanism for easy
attachment and detachment.
As on 15.03.2026, the following 60 Amrit Bharat Express services (30
pairs) are being operated on the Indian Railways network:
S.No. Train No. and Name
1 11015/11016 Lokmanya Tilak (T) - Saharsa Amrit Bharat
Express
2 13697/13698 Gaya - Delhi Amrit Bharat Express
Page 15 of 293 15293/15294 Muzaffarpur - Charlapalli Amrit Bharat Express
4 15557/15558 Darbhanga - Anand Vihar (T) Amrit Bharat
Express
5 15561/15562 Darbhanga - Gomtinagar Amrit Bharat Express
6 15567/15568 Bapudham Motihari - Anand Vihar (T) Amrit
Bharat Express
7 22361/22362 Rajendranagar (T) - New Delhi Amrit Bharat
Express
8 13433/13434 SMVT Bengaluru - Malda Town Amrit Bharat
Express
9 13435/13436 Malda Town - Gomtinagar Amrit Bharat Express
10 15133/15134 Chhapra - Anand Vihar (T) Amrit Bharat Express
11 14047/14048 Sitamarhi - Delhi Amrit Bharat Express
12 14627/14628 Saharsa - Chheharta Amrit Bharat Express
13 19623/19624 Madar - Darbhanga Amrit Bharat Express
14 16601/16602 Erode - Jogbani Amrit Bharat Express
15 19021/19022 Udhna - Brahmapur Amrit Bharat Express
16 15671/15672 Kamakhya - Rohtak Amrit Bharat Express
17 20609/20610 New Jalpaiguri - Tiruchchirappalli Amrit Bharat
Express
18 16597/16598 SMVT Bengaluru - Alipurduar Amrit Bharat
Express
Page 16 of 2919 11031/11032 Panvel - Alipurduar Amrit Bharat Express
20 16107/16108 Tambaram - Santragachi Amrit Bharat Express
21 13065/13066 Howrah - Anand Vihar (T) Amrit Bharat Express
22 22587/22588 Sealdah - Banaras Amrit Bharat Express
23 20603/20604 New Jalpaiguri - Nagercoil Amrit Bharat
Express
24 15949/15950 Dibrugarh - Gomti Nagar Amrit Bharat Express
25 16121/16122 Tambaram - Thiruvananthapuram Central Amrit
Bharat Express
26 16329/16330 Nagercoil - Mangaluru Amrit Bharat Express
27 17041/17042 Charlapalli - Thiruvananthapuram North Amrit
Bharat Express
28 16619/16620 Podanur-Dhanbad Amrit Bharat Express
29 16357/16358 Nagercoil-Charlapalli Amrit Bharat Express
30 15673/15674 Charlapalli - Kamakhya Amrit Bharat Express
Namo Bharat Rapid Rail service:
Indian Railways have introduced Namo Bharat Rapid Rail services. These
services are aimed to enhance the travel experience to the suburban and
regional commuters for short distance travel. The prominent features of
Namo Bharat Rapid Rail are as follows:
1. Centrally controlled Double Leaf Automatic Sliding Doors.
2. CCTVs for safety and passenger surveillance.
3. Modular interior with Cushioned Seats and Sealed Flexible Gangway.
4. Emergency Talk System.
Page 17 of 295. Continuous LED lighting with Energy Efficient Lighting system.
6. FRP Modular Toilets with vacuum evacuation.
7. Fully Air-Conditioned trains with Driver cab AC.
As on 15.03.2026, the following 4 Namo Bharat Rapid Rail services are in
operation:
S.No. Train Number and Name
1 94801/94802 Ahmedabad-Bhuj Namo Bharat Rapid Rail
2 94803/94804 Jaynagar-Patna Namo Bharat Rapid Rail
SPECIAL TRAINS
IR also operates Special train services during festivals, holidays, etc. to
cater to the extra needs of passengers and supplement the accommodation
available by regular services.
Accordingly, the number of Special trains operated across the Indian
Railways network, to facilitate the passengers during Summer/winter
vacations, festivals are as below:
Year No. of trips
2023-24 ~40,500
2024-25 ~85,400
2025-26(upto Feb, 2026) ~74,800
Amrit Bharat Stations
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their
implementation in phases to improve the stations. The master planning
includes:
Improvement of access to station and circulating areas
Page 18 of 29 Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement, water
booths
Provision of wider foot over bridge/air concourse commensurate with
passenger traffic
Provision of lift/escalators/ramp
Improvement /Provision of platform surface and cover over platforms
Provision of kiosks for local products through schemes like ‘One
Station One Product’
Parking areas, Multimodal integration
Amenities for Divyangjans
Better passenger information systems
Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity at each
station
The scheme also envisages sustainable and environment friendly
solutions, provision of ballastless tracks etc. as per necessity, phasing and
feasibility and creation of city centre at the station in the long term.
So far, 1338 stations have been identified for development under Amrit
Bharat Station Scheme, out of which 98 stations are located in Bihar. The
names of stations identified for development under Amrit Bharat Station
Scheme in Bihar are as following:
State No. of Name of Stations
Stations
Bihar 98 Anugraha Narayan Road, Ara, Arariya Court,
Bakhtiyarpur, Banka, Banmankhi, Bapudham
Motihari, Barahiya, Barauni, Barh, Barsoi Jn,
Begusarai, Bettiah, Bhabua Road, Bhagalpur,
Page 19 of 29State No. of Name of Stations
Stations
Bhagwanpur, Bihar Sharif, Bihiya, Bikramganj,
Buxar, Chakia, Chausa, Chhapra, Dalsingh Sarai,
Darbhanga, Dauram Madhepura, Dehri On Sone,
Dholi, Dighwara, Dumraon, Durgauti, Ekma, Fatuha,
Gaya, Ghorasahan, Guraru, Hajipur Jn, Jamalpur
Jn, Jamui, Janakpur Road, Jaynagar, Jehanabad,
Jhanjharpur, Kahalgaon, Karhagola Road, Katihar
Jn, Khagaria Jn, Kishanganj, Kudra, Labha, Laheria
Sarai, Lakhminia, Luckeesarai Jn, Madhubani,
Maheshkhunt, Mairwa, Mansi Jn, Masrakh,
Mokama, Motipur, Munger (Monghyr), Muzaffarpur
Jn, Nabinagar Road, Narkatiaganj Jn, Naugachia,
Nawadah, Paharpur, Patliputra, Patna Jn, Piro,
Pirpainti, Rafiganj, Raghunathpur, Rajendra Nagar
Terminal (Patna), Rajgir, Ram Dayalu Nagar,
Raxaul, Sabaur, Sagauli, Saharsa, Sahibpur Kamal,
Sakri, Salauna, Salmari, Samastipur, Sasaram,
Shahpur Patoree, Shivanarayanpur, Simri
Bakhtiyarpur, Simultala, Sitamarhi, Siwan, Sonpur
Jn., Sultanganj, Supaul, Taregna, Thakurganj,
Thawe
Development works at railway stations under Amrit Bharat Station
Scheme in Bihar have been taken up at a good pace. Till now, works of 02
stations (Pirpainti and Thawe) in Bihar have been completed under this
scheme.
Page 20 of 29The activities for development at other stations have also been taken up
at good pace and progress of some of the stations is as given below:
Dumraon station: The works of new station building, new platform,
circulating area, parking and additional Foot Over Bridge have been
taken up.
Kishanganj station: The works of platform surfacing at platform no.1&2,
drinking water taps at platform no. 1&2, improvement of circulating
area, parking at second entry, approach road and boundary wall have
been completed. The works of horticulture and 12m Foot Over Bridge
have been taken up.
Salmari station: The works of improvement of station building,
extension and raising of platform no.1 and platform shelter at platform
no.1 have been completed. The works of circulating area and 3 m Foot
Over Bridge have been taken up.
Simultala station: The works of station building at second entry,
extension of platform no. 1&2, platform shelter, platform refurbishment,
circulating area, parking, signage, coach indication board and train
indication board have been completed. The work of escalator
installation has been taken up.
Thakurganj station: The works of raising of platform no. 1, platform
surfacing at platform no. 2, platform shelter at platform no. 1 & 2 and
12m Foot Over Bridge have been completed. The works of platform
surfacing at platform no. 1, toilet at platform no. 2, coach indication
board and train indication board have been taken up.
Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways is a continuous and ongoing process and works
in this regard are undertaken as per requirement, subject to inter-se
priority and availability of funds. Development / redevelopment /
Page 21 of 29upgradation / modernisation of a station is carried out based on category
of station/condition/traffic handled etc.
Ministry of Railways has planned to provide holding areas for crowd
management at 76 stations. The passenger holding area for crowd
management planning envisages a comfortable, well-organized space with
basic amenities like seating, drinking water, toilets, ticketing facilities,
information displays, security checks, etc. These amenities are planned to
be organised to manage large passenger footfall efficiently during peak
hours.
The passenger holding area established at New Delhi Railway Station
has significantly helped to ease congestion and enhance passenger
convenience, particularly during peak travel periods. The holding area is
equipped with a wide range of commuter-friendly facilities, including an
increased number of ticket counters, Automatic Ticket Vending
Machine(ATVMs), public announcement system, electronic train
information display boards, CCTV surveillance, luggage scanners, Door
Frame Metal Detector (DFMDs), uninterrupted power supply, improved
night-time lighting, High Volume Low Speed (HVLS) fans, fire-fighting
system, lightning protection system, RO drinking water, and separate
toilets for men, women and Divyangjans, along with seating arrangements.
The provision of holding areas at other stations is at various stages of
planning/execution. Planning is an iterative process requiring optimization
and the time frame and other details for such optimization cannot be
indicated at this stage.
Development / Upgradation of railway stations is complex in nature
involving safety of passengers & trains and requires various statutory
clearances such as fire clearance, heritage, tree cutting, airport clearance
etc. The progress also gets affected due to brownfield related challenges
such as shifting of utilities (involving water/sewage lines, optical fibre
Page 22 of 29cables, gas pipe lines, power/signal cables, etc.), infringements, operation
of trains without hindering passenger movement, speed restrictions due to
works carried out in close proximity of tracks and high voltage power lines,
etc. and these factors affect the completion time.
Development / Upgradation / Modernization of stations including Amrit
Bharat Station Scheme is generally funded under Plan Head-53 ‘Customer
Amenities’. The details of allocation and expenditure under Plan Head-53
are maintained Zonal Railway-wise and not work-wise or station-wise or
state-wise. Bihar is covered under the jurisdiction of four railway zones,
namely, Eastern Railway, Northeast Frontier Railway, North Eastern
Railway and East Central Railway. For these zones, an allocation (Revised
Estimate) of ₹ 1,828 crore has been made for the current year, out of which
an expenditure (up to February, 2026) of ₹ 1,793 crore has been incurred so
far.
Major Developmental works done in Bihar:
Railway Budget:
Budget allocation for Infrastructure projects and safety works, falling
fully/partly in the State of Bihar is as under:
Period Outlay
2009-14 ₹1,132 Cr./year
2025-26 ₹10,066 Cr. (Nearly 9 times)
Track construction:
The details of commissioning/laying of new track falling fully/partly in the
State of Bihar during 2009-14 and 2014-25 is as under :-
Period New Track Commissioned Average Commissioning of new tracks
2009-14 318 Km 63.6 Km/year
2014-25 1,899 Km 172.6 Km/year (More than 2.5 times)
Page 23 of 29Projects sanctioned:
As on 01.04.2025, 52 projects (31 New Lines, 01 Gauge Conversions and
20 Doubling), of a total length of 4,663 km, costing ₹86,107 crore, falling
fully/partly in Bihar, are sanctioned, out of which 1,014 km length has been
commissioned and an expenditure of ₹29,353 crore has been incurred upto
March’ 2025. The summary is as under:-
Total Length Total Exp
No of
Length Commissioned upto
Category sanctioned
NL/GC/DL till Mar'25 Mar'25
Projects
(in Km) (in Km) (₹ in Cr)
New Lines 31 2,691 516 16,814
Gauge
1 69 52 544
Conversion
Doubling/Multi-
20 1,904 446 11,995
tracking
Total 52 4,663 1,014 29,353
Recently completed projects:
Details of some of the recently completed projects falling fully/partly in
Bihar are as under:-
SN. Project Length Cost
(Km) (In Crores of Rs)
1 Patna rail cum road Bridge 28 3,210
2 Munger rail cum road Bridge 15 3,040
3 Kosi Bridge 22 863
4 Daniawan-Biharsharif New Line 38 354
5 Chandan-Banka New Line 40 496
6 Rampurhat-Mandarhill New Line 130 908
7 Maharajganj-Masrakh New Line 35 412
Page 24 of 298 Rajgir-Tilaiya & Natesar-lslampur New 67 726
Line
9 Mansi-Saharsa-Purnia Gauge 141 752
Conversion
10 Jaynagar-Narkatiaganj Gauge 260 967
Conversion
11 Kaptanganj-Chhapra Gauge Conversion 234 819
12 Sakri-Nirmali & Saharasa-Forbesganj 206 2,113
Gauge Conversion
13 Mansi-Saharsa, Saharsa-Purnia & 169 752
Banmakhi- Bihariganj Gauge
Conversion
14 Sahibganj-Pirpainti Doubling 23 129
15 Maheshkunt-Thanabihpur Doubling 32 115
16 Hajipur-Ramdayalu Nagar Doubling 48 367
17 Pirpainti-Bhagalpur Doubling 51 493
18 Bakhtiyarpur-Barh Doubling 19 237
19 Kiul-Gaya Doubling 124 2,462
20 Hajipur-Bachwara Doubling 72 930
21 Darbhanga bypass 9 253
22 Araria-Galgalia (Thakurganj) New Line 110 2,132
23 Saraigarh Byepass line 5 79
24 Chhapra-Chhapra Kacheri 3rd line 3 33
Ongoing projects:
Some of the projects falling fully/partly in the State of Bihar which have
been taken up are as under:
SN. Project Length Cost
(Km) (Rs. in Cr.)
1 Sakri-Hasanpur new line 76 735
Page 25 of 292 Khagaria-Kusheshwarsthan New line 42 1,511
3 Fatuha-lslampur new line 167 2,882
4 Koderma-Tilaiya new line 65 1,980
5 Hajipur-Sagauli new line 151 2,702
6 Araria-Supaul new line 96 1,925
7 Kursela-Bihariganj new line 58 194
8 Bikramshila-Katareah new line 26 2,171
9 Jhajha-Batia new line 20 588
10 Pirpainti-Jassidih new line 97 2,611
11 Chhitauni-Tumkuhi Road new line 59 1,731
12 Jalalgarh-Kishanganj new line 51 360
13 Jogbani-Biratnagar (Nepal) new line 19 402
14 Darbhanga-Kusheshwarasthan new line 70 367
15 Motihari-Sitamarhi new line 77 1,007
16 Sitamarhi-Nirmali new line 189 2,833
17 Nawada-Laxmipur new line 137 3,121
18 Ara-Bhabua Road new line 150 2,397
19 Gaya-Daltonganj new line 137 2,861
20 Muzaffarpur-Darbhanga new line 69 282
21 Muzaffarpur-Janakpur Road new line 67 228
22 Dehri on Sone-Banjari new line 35 111
23 Chhapra-Muzzafarpur new line 78 1,894
24 Bihta-Aurangabad new line 120 2,995
25 Gaya-Chatra and Gaya-Natesar new line 135 4,543
26 Deogarh-Sultanganj new line incl.Banka- 154 665
Barahat and Banka-Bhitiah Road
27 Sultanganj-Katuria new line 77 291
28 Bariarpur-Mananpur new line 68 251
29 Hathua-Bhatni new line 80 318
Page 26 of 2930 Aurangabad Terminal-Anugrah Narayan 13 441
Road new line
31 Nawadah-Pawapuri New line 25 492
32 Jaynagar-Bijalpura Gauge conversion 69 790
33 Dhanbad-Sonnagar 3rd line 291 7,906
34 Samastipur-Darbhanga Doubling 38 826
35 Rampur Dumra-Tal-Rajendra Pul-Additional 14 2,535
bridge and Doubling
36 Sagauli-Valmikinagar Doubling 110 1,456
37 Gaya Bye pass for Manpur 2 30
38 Muzaffarpur-Sugauli Doubling 101 1,586
39 Barauni-Bachwara 3rd & 4th line 32 486
40 Sonenagar bye pass(Chiralapothu to Bagha 10 224
Bishunpur)
41 Narkatiaganj-Darbhanga& Sitamarhi- 256 4,080
Muzaffarpur Doubling
42 Chhapra-Ballia Patch Doubling 65 1,046
43 Gorakhpur-Valmikinagar Doubling 96 1,121
44 Katihar-Kumedpur and Katihar-Mukuria 65 943
Doubling
45 Bhadaura Station and Karma Station 11 200
Surface Triangle Line
46 ROR at Sasaram connecting GC to Ara- 9 470
Sasaram Line
47 Ara Bye pass Line to be connected from 3 119
Jagjivan Halt to existing ARA-Sasaram line
through link cabin (Y-Connectivity at Ara)
48 Son Nagar-Andal Multitracking 749 12,334
49 Bulb line at Nabinagar (Ankorha) 17 612
Page 27 of 2950 Punarakh- Barh-Bhaktiyarpur New 4th line & 28 422
balance 3rd line
51 Sanjaygram to Dhachna By Pass line 2 34
52 Aluabari Road-Thakurganj Doubling 20 327
53 Aluabari Road-New Jalpaiguri 3rd & 4th Line 57 1,630
54 Bhagalpur-Jamalpur 3rd Line 53 1,156
55 Bhagalpur-Dumka-Rampurh at Doubling 177 3,169
56 Bakhtiyarpur-Rajgir-Tilaiya Doubling 104 2,192
57 Bakthiyarpur-Fatuha 3rd and 4th line 24 931
58 Punarakh-Kiul 3rd and 4th line 50 2668
Zonal Railway wise details of Railway projects are made available in
public domain on Indian Railway’s website.
Sanction of any railway project depends upon many parameters/factors
which include the following:
Anticipated traffic projections and Remunerativeness of the proposed
route
First and last mile connectivity provided by the project
Connection of missing links and providing additional route
Augmentation of congested/saturated lines
Demands raised by State Governments/Central Ministries/Public
representatives,
Railway’s own operational requirements
Socio-economic considerations
Overall availability of funds
Completion of Railway project/s depends on various factors which
include the following:
Land acquisition by State Government
Forest clearance
Page 28 of 29 Shifting of infringing utilities
Statutory clearances from various authorities
Geological and topographical conditions of area
Law and order situation in the area of project site
Number of working months in a year for particular project site etc.
All these factors affect the completion time and cost of the project/s.
Implementation of such measures to facilitate rail travel for diverse
segments of passengers is a continuous and ongoing process.
*****
Page 29 of 29