Home India RAILWAYS Parliament Question: Review of Overcrowding in Long Distance...
Date: 2026-03-25 Category: LOKSABHA_QNA State: Union Government Country: India

Parliament Question: Review of Overcrowding in Long Distance Trains

Issued by RAILWAYS · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA STARRED QUESTION NO. 461 TO BE ANSWERED ON 25.03.2026 REVIEW OF OVERCROWDING IN LONG DISTANCE TRAINS †*461. SHRI RAJESH RANJAN: Will the Minister of RAILWAYS be pleased to state: (a) whether the Government has carried out any detailed review of the situation of ever- increasing waiting list and overcrowding in long- distance trains during the last five years and if so, the details thereof; (b) the details of the number of passengers waitlisted and the additional capacity created during the said period especially on routes connecting Eastern States particularly in Bihar, State/UT and route-wise; (c) whether the gaps have been identified between the increase in passenger demand and rail capacity expansion and if so, the details thereof; (d) the reasons for the continued shortage of confirmed tickets despite record railway revenues; and (e) the details of monitoring and evaluation mechanisms established for periodical assessment of passenger capacity and service availability? ANSWER MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND ELECTRONICS & INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW) (a) to (e): A Statement is laid on the Table of the House. ***** §STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (e) OF STARRED QUESTION NO.461 TO BE ANSWERED ON 25.03.2026 IN LOK SABHA (a) to (e): On Indian Railways, occupancy pattern of trains varies over lean and peak periods. During peak rush periods, the occupancy of the trains especially on popular routes remains full whereas during lean period and on less popular routes, there is sub optimal utilization. Waiting list pattern is monitored on regular basis and to cater to additional demand, Indian Railways have taken various steps like introduction of new trains, increase in frequency/extension of existing trains, augmentation of load of existing trains on permanent basis, etc. Further, waiting list limits have been rationalized linking it to the extent of accommodation of that class available in the train. During the last five years from 2021-22 to 2025-26 (up to Feb’2026), 1024 trains were introduced, 907 were extended, frequency of 168 trains was increased and 4651 coaches were augmented. As the Railway network straddles across state boundaries, trains are introduced, as per network requirement, across such boundaries. However, on originating/terminating basis, Indian Railways during 2021-22 to 2025-26 (Feb’2026) have introduced 444 train services catering to the needs of various stations located in the Eastern/North Eastern region including following 75 pair trains serving the stations falling in the state of Bihar:- S.No. Train No. & Name 1 11015/11016 Lokmanya Tilak(T)-Saharsa Amrit Bharat Express 2 13212/13211 Danapur-Jogbani Express 3 13213/13214 Jogbani-Saharsa Express 4 13229/13230 Rajendra Nagar-Godda Express 5 13251/13252 Patna-Anand Vihar(T) Express 6 13334/13333 Patna-Dumka Express Page 1 of 297 13697/13698 Gaya-Delhi Amrit Bharat Express 8 14048/14047 Delhi-Sitamarhi Amrit Bharat Express 9 14628/14627 Chheharta-Saharsa Amrit Bharat Express 10 15133/15134 Chhapra-Anand Vihar (T) Amrit Bharat Express 11 15135/15136 Chhapra-Amritsar Express 12 15293/15294 Muzaffarpur-Charlapalli Amrit Bharat Express 13 15501/15502 Raxaul-Jogbani Express 14 15505/15506 Saharsa-Patliputra Express 15 15507/15508 Darbhanga-Patliputra Express 16 15555/15556 Bapudham Motihari-Patliputra MEMU 17 15557/15558 Darbhanga-Anand Vihar(T) Amrit Bharat Express 18 15561/15562 Darbhanga-Gomti Nagar Amrit Bharat Express 19 15567/15568 Bapudham Motihari-Anand Vihar (T) Amrit Bharat Express 20 15589/15590 Muzaffarpur-Hadapsar Express 21 15701/15702 Katihar -Siliguri Express 22 15723/15724 Jogbani-Siliguri Express 23 16601/16602 Erode-Jogbani Amrit Bharat Express 24 18119/18120 Tatanagar-Jaynagar Express 25 19623/19624 Madar-Darbhanga Amrit Bharat Express 26 19801/19802 Sogaria Cabin-Danapur Express 27 20893/20894 Tatanagar-Patna Vande Bharat Express 28 21893/21894 Tatanagar-Patna Vande Bharat Express 29 21895/21896 Tatanagar-Patna Vande Bharat Express 30 22233/22234 New Jalpaiguri-Patna Vande Bharat Express 31 22303/22304 Howrah-Gaya Vande Bharat Express 32 22309/22310 Howrah-Bhagalpur Vande Bharat Express 33 22345/22346 Patna-Gomti Nagar Vande Bharat Express 34 22347/22348 Howrah-Patna Vande Bharat Express Page 2 of 2935 22349/22350 Patna-Ranchi Vande Bharat Express 36 22357/22358 Gaya-Lokmanya Tilak(T) Express 37 22361/22362 Rajendra Nagar-New Delhi Amrit Bharat Express 38 26301/26302 Jogbani-Danapur Vande Bharat Express 39 26501/26502 Gorakhpur-Patliputra Vande Bharat Express 40 53201/53202 Patna-Buxar Passenger 41 53203/53204 Jhajha-Danapur Passenger 42 53237/53238 Gaya-Patna jn. Passenger 43 53239/53240 Gaya-Patna jn. Passenger 44 53241/53242 Gawnaha-Narkatiaganj jn. Passenger 45 55037/55038 Siwan-Thawe Passenger 46 55121/55122 Siwan-Samastipur Passenger 47 55501/55502 Jhanjharpur-Laukaha Bazar Passenger 48 55503/55504 Jhanjharpur-Laukaha Bazar Passenger 49 55583/55584 Raxaul jn.-Narkatiaganj jn. Passenger 50 63273/63274 Rajgir-Patna MEMU 51 63275/63276 Kiul-Patna MEMU 52 63329/63330 Gaya-Patliputra MEMU 53 63331/63332 Kiul-Mokama MEMU 54 63333/63334 Patliputra-Ballia MEMU 55 63357/63358 Fatuha-Hilsa MEMU 56 63359/63360 Saharsa-Dauram Madhepura MEMU 57 63361/63362 Narkatiaganj-Gauhana MEMU 58 63375/63376 Saharsa-Supaul MEMU 59 63377/63378 Laheria Sarai-Saharsa DEMU 60 63379/63380 Laheria Sarai-Saharsa DEMU 61 63381/63382 Laheria Sarai-Saharsa DEMU 62 63383/63384 Vaishali-Koderma MEMU 63 63389/63390 Nawada-Patna MEMU Page 3 of 2964 63411/63412 Sahibganj-Bhagalpur MEMU 65 73433/73434 Sultanganj-Deoghar DEMU 66 75213/75214 Raxaul jn.-Mehsi MEMU Special MEMU 67 75215/75216 Raxaul jn.-Jaynagar Passenger 68 75221/75222 Sonpur jn.-Vaishali DEMU 69 75223/75224 Bihariganj-Purnea Court DEMU 70 75225/75226 Saharsa-Purnea Court DEMU 71 75249/75250 Saharsa-Amha Pipra DEMU 72 75251/75252 Saharsa-Samastipur jn. DEMU 73 75273/75274 Islampur-Patna DEMU 74 75751/75752 Telta-Radhikapur DEMU 75 94803/94804 Jaynagar-Patna jn. Namo Bharat Rapid Rail Express With a view to meet the demand of passengers travelling in unreserved coaches, Railways have significantly increased the facilities for passengers demanding general class travel. During the last financial year 2024-25 alone, 1250 general coaches have been utilised in various long- distance trains. In the current financial year (upto February, 2026), 860 Coaches have been utilised for permanent augmentation. To cater to the travel demand of the low and middle income families, Indian Railways have taken up manufacturing of 17,000 non-AC coaches (general/sleeper). On IR, the percentage of non-AC coaches, is about 70% as indicated below: Page 4 of 29Table 1: Distribution of coaches: Non-AC coaches (general and ~62,000 ~70% sleeper) AC coaches ~27,000 ~30% Total coaches ~89,000 100% Due to higher availability of general coaches, the number of passengers traveling in general/ unreserved coaches has shown an increasing trend as shown below: Table 2: Passengers in general/unreserved coaches: Year No. of Passengers 2020-21 99 Cr (Covid year) 2021-22 275 Cr (Covid year) 2022-23 553 Cr 2023-24 609 Cr 2024-25 651 Cr The number of seats available for non-AC passengers has also increased. The current composition is as follows: Table 3: Distribution of seats: Non-AC seats ~ 54 lakhs ~ 78% AC seats ~ 15 lakhs ~ 22% Total ~ 69 lakhs 100% Page 5 of 29Moreover, to provide greater accommodation for the passengers using General and non-AC Sleeper Coaches, the extant policy regarding composition of Mail/Express trains provides for 12 (Twelve) General class & Sleeper class non- AC coaches and 08 (eight) AC-Coaches, in a train of 22 coaches, thereby providing greater accommodation for the passengers using General and non-AC Sleeper Coaches. Further, to cater to the needs of passengers desirous of availing unreserved accommodation, Indian Railways (IR) operate unreserved non- AC passenger trains/ MEMU / EMU etc. for affordable travel, which are in addition to the unreserved accommodation (coaches) available in Mail/Express services. With a view to providing affordable, good quality services to all sections of the society, Indian Railways has developed different types of trains, some of which are as under: - Vande Bharat services: Indian Railways, with a view to improve travel experience of the passengers, have introduced indigenously designed and manufactured Vande Bharat trains (Chair Car/Sleeper) with modern coaches, advanced safety features and passenger amenities. Vande Bharat (Chair Car) Train service: These new Vande Bharat Chair Car Trains have following features: ● Jerk Free Semi-Permanent couplers. ● Fitted with KAVACH. ● Centrally controlled Automatic Plug Doors and Fully Sealed wider gangways. ● Emergency Alarm Push buttons and Talk Back Units on all Coaches. Page 6 of 29● Improved fire safety – Aerosol based fire detection and suppression system in electrical cabinets and lavatories. ● Higher acceleration with design/operating speed of 180/160 KMPH. ● Driver-Guard communication with voice recording facility & Crash hardened memory. ● Air conditioning units provided with indigenously developed UV-C lamp based disinfection system for deactivating 99% harmful bacteria from conditioned air to improve the hygiene standards inside the passenger area. ● Better Ride Comfort. ● CCTVs in all Coaches. ● For Divyangjan passengers, special lavatory in the driving coaches on each end. ● Coach Condition Monitoring System (CCMS) display with remote monitoring. As on 15.03.2026, the following 162 (81 pairs) Vande Bharat train services (Chair Car) are being operated on the Indian Railways network: S.No. Train No. and Name 1 22435/22436 New Delhi - Varanasi Vande Bharat Express 2 22439/22440 Sri Mata Vaishno Devi Katra - New Delhi Vande Bharat Express 3 20901/20902 Gandhinagar Capital - Mumbai Central Vande Bharat Express 4 22447/22448 Amb Andura - New Delhi Vande Bharat Express Page 7 of 295 20607/20608 Mysuru - MGR Chennai Central Vande Bharat Express 6 20825/20826 Nagpur - Bilaspur Vande Bharat Express 7 22301/22302 New Jalpaiguri - Howrah Vande Bharat Express 8 20833/20834 Secunderabad - Visakhapatnam Vande Bharat Express 9 22223/22224 Sainagar Shirdi - Chhatrapati Shivaji Maharaj (T) Vande Bharat Express 10 22225/22226 Solapur - Chhatrapati Shivaji Maharaj (T) Vande Bharat Express 11 20171/20172 Nizamuddin - Rani Kamlapati Vande Bharat Express 12 20701/20702 Tirupati - Secunderabad Vande Bharat Express 13 20643/20644 Coimbatore - Chennai Vande Bharat Express 14 20977/20978 Chandigarh - Ajmer Vande Bharat Express 15 20633/20634 Thiruvananthapuram- Kasargod Vande Bharat Express 16 22895/22896 Puri - Howrah Vande Bharat Express 17 22457/22458 Dehradun - Anand Vihar Vande Bharat Express Page 8 of 2918 22227/22228 Guwahati - New Jalpaiguri Vande Bharat Express 19 20911/20912 Nagpur - Indore Vande Bharat Express 20 22229/22230 Madgaon - Chhatrapati Shivaji Maharaj (T) Vande Bharat Express 21 22349/22350 Ranchi - Patna Vande Bharat Express 22 20661/20662 Dharwar - Bengaluru Vande Bharat Express 23 20173/20174 Rewa - Rani Kamlapati Vande Bharat Express 24 22549/22550 Gorakhpur - Prayagraj Vande Bharat Express 25 12461/12462 Sabarmati - Jodhpur Vande Bharat Express 26 22925/22926 Okha - Ahmedabad Vande Bharat Express 27 20665/20666 Tirunelveli - Chennai Egmore Vande Bharat Express 28 20677/20678 Narsapur - Chennai Vande Bharat Express 29 20703/20704 Yesvantpur -Kacheguda Vande Bharat Express 30 20631/20632 Thiruvananthapuram- Mangaluru Vande Bharat Express 31 26963/26964 Udaipur - Asarva Vande Bharat Express Page 9 of 2932 22347/22348 Patna - Howrah Vande Bharat Express 33 20835/20836 Puri - Rourkela Vande Bharat Express 34 20897/20898 Ranchi - Howrah Vande Bharat Express 35 22415/22416 New Delhi - Varanasi Vande Bharat Express 36 20641/20642 Coimbatore - Bengaluru Cantt Vande Bharat Express 37 20645/20646 Mangaluru - Madgaon Vande Bharat Express 38 20705/20706 Chhatrapati Shivaji Maharaj (T) - Nanded Vande Bharat Express 39 22477/22478 Sri Mata Vaishno Devi Katra - New Delhi Vande Bharat Express 40 22425/22426 Anand Vihar - Ayodhya Cantt. Vande Bharat Express 41 22487/22488 Amritsar - Delhi Vande Bharat Express 42 22962/22961 Mumbai Central - Ahmedabad Vande Bharat Express 43 20707/20708 Visakhapatnam - Secunderabad Vande Bharat Express 44 20663/20664 Chennai - Mysuru Vande Bharat Express Page 10 of 2945 22233/22234 Patna - New Jalpaiguri Vande Bharat Express 46 22470/22469 Khajuraho - Nizamuddin Vande Bharat Express 47 22231/22232 Bengaluru - Kalburagi Vande Bharat Express 48 20841/20842 Visakhapatnam - Bhubaneswar Vande Bharat Express 49 22345/22346 Gomti Nagar - Patna Vande Bharat Express 50 20887/20888 Varanasi - Ranchi Vande Bharat Express 51 22545/22546 Dehradun - Lucknow Jn Vande Bharat Express 52 22490/22489 Varanasi - Meerut City Vande Bharat Express 53 20627/20628 Nagercoil - Chennai Egmore Vande Bharat Express 54 20671/20672 Bengaluru Cantt - Madurai Vande Bharat Express 55 22500/22499 Deoghar - Varanasi Vande Bharat Express 56 22309/22310 Jamalpur - Howrah Vande Bharat Express 57 20871/20872 Rourkela - Howrah Vande Bharat Express 58 20893/20894 Patna - Tatanagar Vande Bharat Express 59 20892/20891 Tatanagar - Brahmapur Vande Bharat Express Page 11 of 2960 22303/22304 Gaya - Howrah Vande Bharat Express 61 20669/20670 Pune - Hubballi Vande Bharat Express 62 20673/20674 Pune - Chhatrapati Shahu Maharaj (T) Vande Bharat Express 63 20101/20102 Secunderabad - Nagpur Vande Bharat Express 64 20829/20830 Visakhapatnam - Durg Vande Bharat Express 65 21893/21894 Patna - Tatanagar Vande Bharat Express 66 21895/21896 Patna - Tatanagar Vande Bharat Express 67 20176/20175 Banaras - Agra Cantt. Vande Bharat Express 68 26901/26902 Veraval - Sabarmati Vande Bharat Express 69 26401/26402 Srinagar - Shri Mata Vaishno Devi Katra Vande Bharat Express 70 26403/26404 Srinagar -Shri Mata Vaishno Devi Katra Vande Bharat Express 71 26502/26501 Pataliputra - Gorakhpur Vande Bharat Express 72 26751/26752 KSR Bengaluru - Belagavi Vande Bharat Express 73 26406/26405 Amritsar - Shri Mata Vaishno Devi Katra Vande Bharat Express Page 12 of 2974 26101/26102 Pune - Ajni Vande Bharat Express 75 26302/26301 Jogbani - Danapur Vande Bharat Express 76 26481/26482 Delhi Cantt - Jodhpur Vande Bharat Express 77 26471/26472 Delhi Cantt - Bikaner Vande Bharat Express 78 26462/26461 Delhi - Firozpur Cantt. Vande Bharat Express 79 26651/26652 Ernakulam - KSR Bengaluru Vande Bharat Express 80 26506/26505 Khajuraho - Banaras Vande Bharat Express 81 26504/26503 Saharanpur -Gomtinagar Vande Bharat Express Vande Bharat Sleeper Train service: With a view to providing comfortable journey with lesser transit time to long distance travellers, the Sleeper variant of Vande Bharat Express has been indigenously designed and developed. Broad Technological advancements and safety features provided in these Vande Bharat Sleeper Trains are as below: • Jerk-Free Semi permanent couplers and Anti Climbers. • Fitted with KAVACH. • Higher acceleration with design/operating speed of 180/160 KMPH. • Crashworthy Design of Car body complying with EN standards. • Fire barrier doors at the end of each coach for compliance of Fire Safety standards. Page 13 of 29• Aerosol based fire detection and suppression system in electrical cabinets and lavatories. • Regenerative braking system for energy efficiency. • Air conditioning units provided with indigenously developed UV-C lamp based disinfection system for deactivating 99% harmful bacteria from conditioned air to improve the hygiene standards inside the passenger area. • Centrally controlled Automatic Plug Doors and Fully Sealed wider gangways. • CCTVs in all coaches. • Emergency talk-back unit for communication between Passenger and Train Manager/Loco Pilot in case of emergency. • For Divyangjan passengers, special lavatory in the driving coaches on each end. • Centralized Coach Monitoring System for better condition monitoring of passenger amenities such as Air conditioning, Saloon Lighting etc. • Ergonomically designed ladder for ease of climbing on to upper berths. As on 15.03.2026, the following 02 Vande Bharat Sleeper Express are being operated on the Indian Railways network: S.No. Train No. and Name 1 27575/27576 Howrah - Kamakhya Vande Bharat Sleeper Express Amrit Bharat service: To provide affordable means of transportation to the low and middle income families, Indian Railways have introduced Amrit Bharat services that are fully non-AC modern trains. As on 15.03.2026, 60 services are Page 14 of 29already in operation. The present composition of Amrit Bharat consists of 11 General Class coaches, 8 Sleeper Class coaches, 01 Pantry Car and 02 Luggage cum Divyangjan coaches. High Speed and enhanced Safety standards are the hallmarks of these trains with following enhanced features and amenities: ● Better aesthetics of seat and berths with enhanced look & feel on the lines of Vande Bharat Sleeper. ● Jerk Free Semi-Automatic Couplers. ● Improved Crashworthiness in coaches by provision of crash tube. ● Provision of CCTV system in all coaches. ● Improved designs of toilets. ● Improved design of Ladder for ease of climbing on to the berth. ● Improved LED Light fitting & Charging Sockets. ● Provision of EP assisted braking system. ● Aerosol based fire suppression system in toilets and electrical cubicles. ● USB Type-A and Type-C mobile charging sockets. ● Emergency Talk Back system for two-way communication between Passenger and Guard/Train Manager. ● Non-AC pantry with enhanced heating capacity. ● Fully sealed gangways with quick release mechanism for easy attachment and detachment. As on 15.03.2026, the following 60 Amrit Bharat Express services (30 pairs) are being operated on the Indian Railways network: S.No. Train No. and Name 1 11015/11016 Lokmanya Tilak (T) - Saharsa Amrit Bharat Express 2 13697/13698 Gaya - Delhi Amrit Bharat Express Page 15 of 293 15293/15294 Muzaffarpur - Charlapalli Amrit Bharat Express 4 15557/15558 Darbhanga - Anand Vihar (T) Amrit Bharat Express 5 15561/15562 Darbhanga - Gomtinagar Amrit Bharat Express 6 15567/15568 Bapudham Motihari - Anand Vihar (T) Amrit Bharat Express 7 22361/22362 Rajendranagar (T) - New Delhi Amrit Bharat Express 8 13433/13434 SMVT Bengaluru - Malda Town Amrit Bharat Express 9 13435/13436 Malda Town - Gomtinagar Amrit Bharat Express 10 15133/15134 Chhapra - Anand Vihar (T) Amrit Bharat Express 11 14047/14048 Sitamarhi - Delhi Amrit Bharat Express 12 14627/14628 Saharsa - Chheharta Amrit Bharat Express 13 19623/19624 Madar - Darbhanga Amrit Bharat Express 14 16601/16602 Erode - Jogbani Amrit Bharat Express 15 19021/19022 Udhna - Brahmapur Amrit Bharat Express 16 15671/15672 Kamakhya - Rohtak Amrit Bharat Express 17 20609/20610 New Jalpaiguri - Tiruchchirappalli Amrit Bharat Express 18 16597/16598 SMVT Bengaluru - Alipurduar Amrit Bharat Express Page 16 of 2919 11031/11032 Panvel - Alipurduar Amrit Bharat Express 20 16107/16108 Tambaram - Santragachi Amrit Bharat Express 21 13065/13066 Howrah - Anand Vihar (T) Amrit Bharat Express 22 22587/22588 Sealdah - Banaras Amrit Bharat Express 23 20603/20604 New Jalpaiguri - Nagercoil Amrit Bharat Express 24 15949/15950 Dibrugarh - Gomti Nagar Amrit Bharat Express 25 16121/16122 Tambaram - Thiruvananthapuram Central Amrit Bharat Express 26 16329/16330 Nagercoil - Mangaluru Amrit Bharat Express 27 17041/17042 Charlapalli - Thiruvananthapuram North Amrit Bharat Express 28 16619/16620 Podanur-Dhanbad Amrit Bharat Express 29 16357/16358 Nagercoil-Charlapalli Amrit Bharat Express 30 15673/15674 Charlapalli - Kamakhya Amrit Bharat Express Namo Bharat Rapid Rail service: Indian Railways have introduced Namo Bharat Rapid Rail services. These services are aimed to enhance the travel experience to the suburban and regional commuters for short distance travel. The prominent features of Namo Bharat Rapid Rail are as follows: 1. Centrally controlled Double Leaf Automatic Sliding Doors. 2. CCTVs for safety and passenger surveillance. 3. Modular interior with Cushioned Seats and Sealed Flexible Gangway. 4. Emergency Talk System. Page 17 of 295. Continuous LED lighting with Energy Efficient Lighting system. 6. FRP Modular Toilets with vacuum evacuation. 7. Fully Air-Conditioned trains with Driver cab AC. As on 15.03.2026, the following 4 Namo Bharat Rapid Rail services are in operation: S.No. Train Number and Name 1 94801/94802 Ahmedabad-Bhuj Namo Bharat Rapid Rail 2 94803/94804 Jaynagar-Patna Namo Bharat Rapid Rail SPECIAL TRAINS IR also operates Special train services during festivals, holidays, etc. to cater to the extra needs of passengers and supplement the accommodation available by regular services. Accordingly, the number of Special trains operated across the Indian Railways network, to facilitate the passengers during Summer/winter vacations, festivals are as below: Year No. of trips 2023-24 ~40,500 2024-25 ~85,400 2025-26(upto Feb, 2026) ~74,800 Amrit Bharat Stations Ministry of Railways has launched Amrit Bharat Station Scheme for redevelopment of stations with a long-term approach. The scheme involves preparation of master plans and their implementation in phases to improve the stations. The master planning includes:  Improvement of access to station and circulating areas Page 18 of 29 Integration of station with both sides of city  Improvement of station building  Improvement of waiting halls, toilets, sitting arrangement, water booths  Provision of wider foot over bridge/air concourse commensurate with passenger traffic  Provision of lift/escalators/ramp  Improvement /Provision of platform surface and cover over platforms  Provision of kiosks for local products through schemes like ‘One Station One Product’  Parking areas, Multimodal integration  Amenities for Divyangjans  Better passenger information systems  Provision of executive lounges, nominated spaces for business meetings, landscaping, etc. keeping in view the necessity at each station The scheme also envisages sustainable and environment friendly solutions, provision of ballastless tracks etc. as per necessity, phasing and feasibility and creation of city centre at the station in the long term. So far, 1338 stations have been identified for development under Amrit Bharat Station Scheme, out of which 98 stations are located in Bihar. The names of stations identified for development under Amrit Bharat Station Scheme in Bihar are as following: State No. of Name of Stations Stations Bihar 98 Anugraha Narayan Road, Ara, Arariya Court, Bakhtiyarpur, Banka, Banmankhi, Bapudham Motihari, Barahiya, Barauni, Barh, Barsoi Jn, Begusarai, Bettiah, Bhabua Road, Bhagalpur, Page 19 of 29State No. of Name of Stations Stations Bhagwanpur, Bihar Sharif, Bihiya, Bikramganj, Buxar, Chakia, Chausa, Chhapra, Dalsingh Sarai, Darbhanga, Dauram Madhepura, Dehri On Sone, Dholi, Dighwara, Dumraon, Durgauti, Ekma, Fatuha, Gaya, Ghorasahan, Guraru, Hajipur Jn, Jamalpur Jn, Jamui, Janakpur Road, Jaynagar, Jehanabad, Jhanjharpur, Kahalgaon, Karhagola Road, Katihar Jn, Khagaria Jn, Kishanganj, Kudra, Labha, Laheria Sarai, Lakhminia, Luckeesarai Jn, Madhubani, Maheshkhunt, Mairwa, Mansi Jn, Masrakh, Mokama, Motipur, Munger (Monghyr), Muzaffarpur Jn, Nabinagar Road, Narkatiaganj Jn, Naugachia, Nawadah, Paharpur, Patliputra, Patna Jn, Piro, Pirpainti, Rafiganj, Raghunathpur, Rajendra Nagar Terminal (Patna), Rajgir, Ram Dayalu Nagar, Raxaul, Sabaur, Sagauli, Saharsa, Sahibpur Kamal, Sakri, Salauna, Salmari, Samastipur, Sasaram, Shahpur Patoree, Shivanarayanpur, Simri Bakhtiyarpur, Simultala, Sitamarhi, Siwan, Sonpur Jn., Sultanganj, Supaul, Taregna, Thakurganj, Thawe Development works at railway stations under Amrit Bharat Station Scheme in Bihar have been taken up at a good pace. Till now, works of 02 stations (Pirpainti and Thawe) in Bihar have been completed under this scheme. Page 20 of 29The activities for development at other stations have also been taken up at good pace and progress of some of the stations is as given below:  Dumraon station: The works of new station building, new platform, circulating area, parking and additional Foot Over Bridge have been taken up.  Kishanganj station: The works of platform surfacing at platform no.1&2, drinking water taps at platform no. 1&2, improvement of circulating area, parking at second entry, approach road and boundary wall have been completed. The works of horticulture and 12m Foot Over Bridge have been taken up.  Salmari station: The works of improvement of station building, extension and raising of platform no.1 and platform shelter at platform no.1 have been completed. The works of circulating area and 3 m Foot Over Bridge have been taken up.  Simultala station: The works of station building at second entry, extension of platform no. 1&2, platform shelter, platform refurbishment, circulating area, parking, signage, coach indication board and train indication board have been completed. The work of escalator installation has been taken up.  Thakurganj station: The works of raising of platform no. 1, platform surfacing at platform no. 2, platform shelter at platform no. 1 & 2 and 12m Foot Over Bridge have been completed. The works of platform surfacing at platform no. 1, toilet at platform no. 2, coach indication board and train indication board have been taken up. Further, development / redevelopment / upgradation / modernisation of stations on Indian Railways is a continuous and ongoing process and works in this regard are undertaken as per requirement, subject to inter-se priority and availability of funds. Development / redevelopment / Page 21 of 29upgradation / modernisation of a station is carried out based on category of station/condition/traffic handled etc. Ministry of Railways has planned to provide holding areas for crowd management at 76 stations. The passenger holding area for crowd management planning envisages a comfortable, well-organized space with basic amenities like seating, drinking water, toilets, ticketing facilities, information displays, security checks, etc. These amenities are planned to be organised to manage large passenger footfall efficiently during peak hours. The passenger holding area established at New Delhi Railway Station has significantly helped to ease congestion and enhance passenger convenience, particularly during peak travel periods. The holding area is equipped with a wide range of commuter-friendly facilities, including an increased number of ticket counters, Automatic Ticket Vending Machine(ATVMs), public announcement system, electronic train information display boards, CCTV surveillance, luggage scanners, Door Frame Metal Detector (DFMDs), uninterrupted power supply, improved night-time lighting, High Volume Low Speed (HVLS) fans, fire-fighting system, lightning protection system, RO drinking water, and separate toilets for men, women and Divyangjans, along with seating arrangements. The provision of holding areas at other stations is at various stages of planning/execution. Planning is an iterative process requiring optimization and the time frame and other details for such optimization cannot be indicated at this stage. Development / Upgradation of railway stations is complex in nature involving safety of passengers & trains and requires various statutory clearances such as fire clearance, heritage, tree cutting, airport clearance etc. The progress also gets affected due to brownfield related challenges such as shifting of utilities (involving water/sewage lines, optical fibre Page 22 of 29cables, gas pipe lines, power/signal cables, etc.), infringements, operation of trains without hindering passenger movement, speed restrictions due to works carried out in close proximity of tracks and high voltage power lines, etc. and these factors affect the completion time. Development / Upgradation / Modernization of stations including Amrit Bharat Station Scheme is generally funded under Plan Head-53 ‘Customer Amenities’. The details of allocation and expenditure under Plan Head-53 are maintained Zonal Railway-wise and not work-wise or station-wise or state-wise. Bihar is covered under the jurisdiction of four railway zones, namely, Eastern Railway, Northeast Frontier Railway, North Eastern Railway and East Central Railway. For these zones, an allocation (Revised Estimate) of ₹ 1,828 crore has been made for the current year, out of which an expenditure (up to February, 2026) of ₹ 1,793 crore has been incurred so far. Major Developmental works done in Bihar: Railway Budget: Budget allocation for Infrastructure projects and safety works, falling fully/partly in the State of Bihar is as under: Period Outlay 2009-14 ₹1,132 Cr./year 2025-26 ₹10,066 Cr. (Nearly 9 times) Track construction: The details of commissioning/laying of new track falling fully/partly in the State of Bihar during 2009-14 and 2014-25 is as under :- Period New Track Commissioned Average Commissioning of new tracks 2009-14 318 Km 63.6 Km/year 2014-25 1,899 Km 172.6 Km/year (More than 2.5 times) Page 23 of 29Projects sanctioned: As on 01.04.2025, 52 projects (31 New Lines, 01 Gauge Conversions and 20 Doubling), of a total length of 4,663 km, costing ₹86,107 crore, falling fully/partly in Bihar, are sanctioned, out of which 1,014 km length has been commissioned and an expenditure of ₹29,353 crore has been incurred upto March’ 2025. The summary is as under:- Total Length Total Exp No of Length Commissioned upto Category sanctioned NL/GC/DL till Mar'25 Mar'25 Projects (in Km) (in Km) (₹ in Cr) New Lines 31 2,691 516 16,814 Gauge 1 69 52 544 Conversion Doubling/Multi- 20 1,904 446 11,995 tracking Total 52 4,663 1,014 29,353 Recently completed projects: Details of some of the recently completed projects falling fully/partly in Bihar are as under:- SN. Project Length Cost (Km) (In Crores of Rs) 1 Patna rail cum road Bridge 28 3,210 2 Munger rail cum road Bridge 15 3,040 3 Kosi Bridge 22 863 4 Daniawan-Biharsharif New Line 38 354 5 Chandan-Banka New Line 40 496 6 Rampurhat-Mandarhill New Line 130 908 7 Maharajganj-Masrakh New Line 35 412 Page 24 of 298 Rajgir-Tilaiya & Natesar-lslampur New 67 726 Line 9 Mansi-Saharsa-Purnia Gauge 141 752 Conversion 10 Jaynagar-Narkatiaganj Gauge 260 967 Conversion 11 Kaptanganj-Chhapra Gauge Conversion 234 819 12 Sakri-Nirmali & Saharasa-Forbesganj 206 2,113 Gauge Conversion 13 Mansi-Saharsa, Saharsa-Purnia & 169 752 Banmakhi- Bihariganj Gauge Conversion 14 Sahibganj-Pirpainti Doubling 23 129 15 Maheshkunt-Thanabihpur Doubling 32 115 16 Hajipur-Ramdayalu Nagar Doubling 48 367 17 Pirpainti-Bhagalpur Doubling 51 493 18 Bakhtiyarpur-Barh Doubling 19 237 19 Kiul-Gaya Doubling 124 2,462 20 Hajipur-Bachwara Doubling 72 930 21 Darbhanga bypass 9 253 22 Araria-Galgalia (Thakurganj) New Line 110 2,132 23 Saraigarh Byepass line 5 79 24 Chhapra-Chhapra Kacheri 3rd line 3 33 Ongoing projects: Some of the projects falling fully/partly in the State of Bihar which have been taken up are as under: SN. Project Length Cost (Km) (Rs. in Cr.) 1 Sakri-Hasanpur new line 76 735 Page 25 of 292 Khagaria-Kusheshwarsthan New line 42 1,511 3 Fatuha-lslampur new line 167 2,882 4 Koderma-Tilaiya new line 65 1,980 5 Hajipur-Sagauli new line 151 2,702 6 Araria-Supaul new line 96 1,925 7 Kursela-Bihariganj new line 58 194 8 Bikramshila-Katareah new line 26 2,171 9 Jhajha-Batia new line 20 588 10 Pirpainti-Jassidih new line 97 2,611 11 Chhitauni-Tumkuhi Road new line 59 1,731 12 Jalalgarh-Kishanganj new line 51 360 13 Jogbani-Biratnagar (Nepal) new line 19 402 14 Darbhanga-Kusheshwarasthan new line 70 367 15 Motihari-Sitamarhi new line 77 1,007 16 Sitamarhi-Nirmali new line 189 2,833 17 Nawada-Laxmipur new line 137 3,121 18 Ara-Bhabua Road new line 150 2,397 19 Gaya-Daltonganj new line 137 2,861 20 Muzaffarpur-Darbhanga new line 69 282 21 Muzaffarpur-Janakpur Road new line 67 228 22 Dehri on Sone-Banjari new line 35 111 23 Chhapra-Muzzafarpur new line 78 1,894 24 Bihta-Aurangabad new line 120 2,995 25 Gaya-Chatra and Gaya-Natesar new line 135 4,543 26 Deogarh-Sultanganj new line incl.Banka- 154 665 Barahat and Banka-Bhitiah Road 27 Sultanganj-Katuria new line 77 291 28 Bariarpur-Mananpur new line 68 251 29 Hathua-Bhatni new line 80 318 Page 26 of 2930 Aurangabad Terminal-Anugrah Narayan 13 441 Road new line 31 Nawadah-Pawapuri New line 25 492 32 Jaynagar-Bijalpura Gauge conversion 69 790 33 Dhanbad-Sonnagar 3rd line 291 7,906 34 Samastipur-Darbhanga Doubling 38 826 35 Rampur Dumra-Tal-Rajendra Pul-Additional 14 2,535 bridge and Doubling 36 Sagauli-Valmikinagar Doubling 110 1,456 37 Gaya Bye pass for Manpur 2 30 38 Muzaffarpur-Sugauli Doubling 101 1,586 39 Barauni-Bachwara 3rd & 4th line 32 486 40 Sonenagar bye pass(Chiralapothu to Bagha 10 224 Bishunpur) 41 Narkatiaganj-Darbhanga& Sitamarhi- 256 4,080 Muzaffarpur Doubling 42 Chhapra-Ballia Patch Doubling 65 1,046 43 Gorakhpur-Valmikinagar Doubling 96 1,121 44 Katihar-Kumedpur and Katihar-Mukuria 65 943 Doubling 45 Bhadaura Station and Karma Station 11 200 Surface Triangle Line 46 ROR at Sasaram connecting GC to Ara- 9 470 Sasaram Line 47 Ara Bye pass Line to be connected from 3 119 Jagjivan Halt to existing ARA-Sasaram line through link cabin (Y-Connectivity at Ara) 48 Son Nagar-Andal Multitracking 749 12,334 49 Bulb line at Nabinagar (Ankorha) 17 612 Page 27 of 2950 Punarakh- Barh-Bhaktiyarpur New 4th line & 28 422 balance 3rd line 51 Sanjaygram to Dhachna By Pass line 2 34 52 Aluabari Road-Thakurganj Doubling 20 327 53 Aluabari Road-New Jalpaiguri 3rd & 4th Line 57 1,630 54 Bhagalpur-Jamalpur 3rd Line 53 1,156 55 Bhagalpur-Dumka-Rampurh at Doubling 177 3,169 56 Bakhtiyarpur-Rajgir-Tilaiya Doubling 104 2,192 57 Bakthiyarpur-Fatuha 3rd and 4th line 24 931 58 Punarakh-Kiul 3rd and 4th line 50 2668 Zonal Railway wise details of Railway projects are made available in public domain on Indian Railway’s website. Sanction of any railway project depends upon many parameters/factors which include the following:  Anticipated traffic projections and Remunerativeness of the proposed route  First and last mile connectivity provided by the project  Connection of missing links and providing additional route  Augmentation of congested/saturated lines  Demands raised by State Governments/Central Ministries/Public representatives,  Railway’s own operational requirements  Socio-economic considerations  Overall availability of funds Completion of Railway project/s depends on various factors which include the following:  Land acquisition by State Government  Forest clearance Page 28 of 29 Shifting of infringing utilities  Statutory clearances from various authorities  Geological and topographical conditions of area  Law and order situation in the area of project site  Number of working months in a year for particular project site etc. All these factors affect the completion time and cost of the project/s. Implementation of such measures to facilitate rail travel for diverse segments of passengers is a continuous and ongoing process. ***** Page 29 of 29

Continue your research