GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
STARRED QUESTION NO. 378
TO BE ANSWERED ON 18.03.2026
SAFETY AUDIT OF RAILWAY INFRASTRUCTURE
*378. DR. KALANIDHI VEERASWAMY:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Government has undertaken a comprehensive safety audit
of railway infrastructure including tracks, signalling systems, bridges
and rolling stock alongside ongoing modernisation initiatives;
(b) if so, the total allocation made towards passenger safety measures in the
current and five previous financial years;
(c) whether the Government proposes to prioritise upgradation of existing
tracks, implementation of automatic train protection systems such as
Kavach, elimination of unmanned level crossings and recruitment of
safety-critical staff before undertaking further expansion and
modernisation projects and if so, the details thereof;
(d) the details of accidents reported during the last three years along with
action taken reports and accountability fixed, zone-wise;
(e) whether the Government has conducted an independent review to assess
that the pace of modernisation is aligned with passenger safety
preparedness and if so, the details thereof; and
(f) the steps taken/being taken by the Government to ensure that passenger
safety remains the foremost priority amid rapid technological and
infrastructural modernisation of the Railways?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (f): A Statement is laid on the Table of the House.
*****
§STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (f) OF STARRED
QUESTION NO.378 TO BE ANSWERED ON 18.03.2026 IN LOK SABHA
(a) to (f): Safety is accorded the highest priority on Indian Railways. Regular
Safety Inspections of Track, OHE, Signalling assets, Rolling stock, etc are
carried out by designated officials and necessary action is taken
accordingly. As a consequence of various safety measures taken over the
years, there has been a steep decline in the number of accidents.
Number of Consequential Train Accidents has reduced as shown in the table
below: -
Year Consequential Accidents
2014-15 135
2025-26 (upto 28.02.2026) 14 (90% lesser)
Another important index showing improvement in safety in train operations
is Consequential Accident Index, the details of which are as under:-
Consequential Accident Index:-
Year Accident Index
2014-15 0.11
2024-25 0.03 (73% lesser)
This index measures number of consequential accidents as a ratio of total
running kilometers of all trains.
Accident Index =
234
165
135
55
31
14
2005-06 2009-10 2014-15 2019-20 2024-25 2025-26
(Feb 2026)
niarT
laitneuqesnoC
fo
.oN
stnediccA
No. of consequential accidents
No. of trains X million kilometers runThe various safety measures taken to enhance safety in train operations are
as under:-
1. On Indian Railways, the expenditure on Safety related activities has
increased over the years as under:-
Expenditure/Budget on Safety related activities (Rs. in Cr.)
2013-14 2022-23 2023-24 2024-25 2025-26 2026-27
39,200 87,336 1,01,662 1,14,022 1,17,693 1,20,389
2. Electrical/Electronic Interlocking Systems with centralized operation of
points and signals have been provided at 6,665 stations up to 28.02.2026
to reduce accidents due to human failure.
3. Interlocking of Level Crossing (LC) Gates has been provided at 10,153
Level Crossing Gates up to 28.02.2026 for enhancing safety at LC Gates.
4. Complete Track Circuiting of stations to enhance safety by verification
of track occupancy by electrical means has been provided at 6,669
stations up to 28.02.2026.
5. Detailed instructions on issues related with safety of Signalling, e.g.
mandatory correspondence check, alteration work protocol,
preparation of completion drawing, etc. have been issued.
6. System of disconnection and reconnection for S&T equipment as per
protocol has been re-emphasized.
7. All locomotives are equipped with Vigilance Control Devices (VCD) to
improve alertness of Loco Pilots.
8. Retro-reflective sigma boards are provided on the mast which is located
two OHE masts prior to the signals in electrified territories to alert the
crew about the signal ahead when visibility is low due to foggy weather.
9. A GPS based Fog Safety Device (FSD) is provided to loco pilots in fog
affected areas which enables loco pilots to know the distance of the
approaching landmarks like signals, level crossing gates, etc.
10. Modern track structure consisting of 60kg, 90 Ultimate Tensile Strength
(UTS) rails, Prestressed Concrete Sleeper (PSC) Normal/Wide base
sleepers with elastic fastening, fan shaped layout turnout on PSC
sleepers, Steel Channel/H-beam Sleepers on girder bridges is used
while carrying out primary track renewals.
11. Mechanisation of track laying activity through use of track machines
like PQRS, TRT, T-28 etc. to reduce human errors.12. Maximizing supply of 130m/260m long rail panels for increasing
progress of rail renewal and avoiding welding of joints, thereby
improving safety.
13. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws and
timely removal of defective rails.
14. Laying of longer rails, minimizing the use of Alumino Thermic Welding
and adoption of better welding technology for rails i.e., Flash Butt
Welding.
15. Monitoring of track geometry by OMS (Oscillation Monitoring System)
and TRC (Track Recording Cars).
16. Patrolling of railway tracks to look out for weld/rail fractures.
17. The use of Thick Web Switches and Weldable CMS Crossing in turnout
renewal works.
18. Inspections at regular intervals are carried out to monitor and educate
staff for observance of safe practices.
19. Web based online monitoring system of track assets viz. Track database
and decision support system has been adopted to decide rationalized
maintenance requirement and optimize inputs.
20. Detailed instructions on issues related with safety of Track, e.g.
integrated block, corridor block, worksite safety, monsoon precautions,
etc. have been issued.
21. Preventive maintenance of railway assets (Coaches & Wagons) is
undertaken to ensure safe train operations.
22. Replacement of conventional ICF design coaches with LHB design
coaches is being done.
23. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route have
been eliminated by January 2019.
24. Safety of Railway Bridges is ensured through regular inspection of
Bridges. The requirement of repair/rehabilitation of Bridges is taken up
based upon the conditions assessed during these inspections.
25. Indian Railways has displayed Statutory “Fire Notices” for widespread
passenger information in all coaches. Fire posters are provided in every
coach so as to educate and alert passengers regarding various Do’s and
Don’ts to prevent fire. These include messages regarding not carrying
any inflammable material, explosives, prohibition of smoking inside the
coaches, penalties etc.
26. Production Units are providing Fire detection and suppression system
in newly manufactured Power Cars and Pantry Cars, Fire and Smoke
detection system in newly manufactured coaches. Progressive fitmentof the same in existing coaches is also underway by Zonal Railways in
a phased manner.
27. Regular counselling and training of staff is undertaken.
28. Concept of Rolling Block introduced in Indian Railways (Open Lines)
General Rules vide Gazette notification dated 30.11.2023, wherein work
of integrated maintenance/ repair/replacement of assets is planned up
to 52 weeks in advance on rolling basis and executed as per plan.
The details of the Safety related works related to better maintenance
practices, Technological improvements, better infrastructure and rolling
stock etc. undertaken by Railways are tabulated below:-
2004-05 to 2014-15 to 2024- 2014-25 Vs.
S.N. Item
2013-14 25 2004-14
Technological Improvements
1. Use of high-quality 57,450 Km 1.43 Lakh Km More than
rails 2 times
(60 Kg) (Km)
2. Longer Rail Panels 9,917 Km 77,522 Km Nearly 8
(260m) (Km) times
3. Electronic 837 3,691 Stations More than
Interlocking Stations 4 times
(Stations)
4. Fog Pass Safety As on As on 31.03.25: 288 times
Devices (Nos.) 31.03.14: 25,939 Nos.
90 Nos.
5. Thick Web Switches Nil 28,301 Nos.
(Nos.)
Better Maintenance Practices
1. Primary Rail Renewal 32,260 Km 49,941 Km 1.5 times
(Track Km)
2. USFD (Ultra Sonic 79.43 Lakh 2 Crore More than
Flaw detection) 2 times
Testing of Welds
(Nos.)
3. Weld failures (Nos.) In 2013-14: In 2024-25: 90 %
3699 Nos. 370 Nos. reduction4. Rail fractures (Nos.) In 2013-14: In 2024-25: More than
2548 Nos. 289 Nos. 88%
reduction
Better Maintenance Practices
1. New Track KM added 14,985 Km 34,428 Km More than
(Track Km) 2 times
2. Flyovers 4,148 Nos. 13,808 Nos. More than
(RoBs)/Underpasses 3 times
(RUBs) (Nos.)
3. Unmanned Level As on As on Removed
crossings 31.03.14: 31.03.24:Nil
(Nos.) on BG 8,948 (All eliminated
by 31.01.19)
4. Manufacture of LHB 2,337 Nos. 42,677 More than
Coaches (Nos.) 18 times
Implementation of Kavach:
1. Kavach is an indigenously developed Automatic Train Protection (ATP)
system. Kavach is a highly technology intensive system, which requires
safety certification of highest order (SIL-4).
2. Kavach aids the Loco Pilot in running of trains within specified speed
limits by automatic application of brakes in case Loco Pilot fails to do so
and also helps the trains to run safely during inclement weather.
3. The first field trials on the passenger trains were started in February
2016. Based on the experience gained and Independent Safety
Assessment of the system by Independent Safety Assessor (ISA), three
firms were approved in 2018-19, for supply of Kavach Ver 3.2.
4. Kavach was adopted as National ATP system in July, 2020.
5. Implementation of Kavach System involves following Key Activities:
a. Installation of Station Kavach at each and every station, block
section.
b. Installation of RFID Tags throughout the track length.
c. Installation of telecom Towers throughout the section.
d. Laying of Optical Fibre Cable along the track.e. Provision of Loco Kavach on each and every Locomotive running on
Indian Railways.
6. Based on deployment of Kavach version 3.2 on 1465 RKm on South
Central Railway and experience gained, further improvements were
made. Finally, Kavach specification version 4.0 was approved by RDSO
on 16.07.2024.
7. Kavach version 4.0 covers all the major features required for the diverse
railway network. This is a significant milestone in safety for Indian
Railways. Within a short period, IR has developed, tested and started
deploying Automatic Train Protection System.
8. Major improvement in Version 4.0 includes increased Location Accuracy,
Improved Information of Signal Aspects in bigger yards, Station to Station
Kavach interface on OFC and Direct Interface to existing Electronic
Interlocking System. With these improvements, Kavach Ver.4.0. is
planned for large scale deployment over Indian Railways.
9. After extensive and elaborate trials, Kavach Version 4.0 has been
successfully commissioned on 1452 Route Kilometres, covering the high-
density Delhi- Mumbai and Delhi-Howrah routes as below:
SN Section Progress (Route Km)
(1) Delhi-Mumbai route:
i Junction cabin – Palwal – Mathura – 667
Nagda section
ii Vadodara - Ahmedabad section 96
iii Vadodara - Virar section 336
(2) Delhi – Howrah route:
i Gaya Sarmatanr section 93
ii Chota Ambana - Bardhaman – Howrah 260
section
10. Further, track side Kavach implementation work has been taken up on
24,427 RKM covering all GQ, GD, HDN and identified sections of Indian
Railways.11. Progress of key items of Kavach on High density routes including Delhi–
Mumbai & Delhi– Howrah corridors as on 14.03.26 are as under:
SN Item Progress
i Laying of Optical Fibre Cable 8570 Km
ii Installation of Telecom Towers 1100 nos
iii Station Data Centre 767 stations
iv Installation of Track side equipment 6776 RKm
v Provision of Kavach in Loco 4211 nos
12. In addition, work for installation of Kavach in 8979 Locomotives and
1200 EMU / MEMU has been taken up.
13. Specialized training programmes on Kavach are being conducted at
centralized training institutes of Indian Railways to impart training to all
concerned officials. By now more than 55,000 technicians, operators
and engineers have been trained on Kavach technology. This includes
about 47,500 Loco Pilots & Assistant Loco Pilots. Courses have been
designed in collaboration with IRISET.
14. The cost for provision of Track Side including Station equipment of
Kavach is approximately Rs.50 Lakhs/Km and cost for provision of
Kavach equipment on locomotives is approximately Rs.80 Lakh/Loco.
15. The funds utilized on Kavach works so far up to Feb'26 is Rs. 2,763.90
Crores. The allocation of funds during the year 2025-26 is Rs. 1,673.19
Crores. Requisite funds are made available as per the progress of works.
Recruitment done in Indian Railways during 2004-05 to 2013-14 vis-à-vis
during 2014-15 to 2025-26 is given as under: -
Period Recruitments
2004-2005 to 2013-2014 4.11 lakh
2014-2015 to 2024-2025 5.08 lakh
2025-26 till date 41,343Occurrence and filling up of vacancies are continuous processes on Indian
Railways considering its size, spatial distribution and criticality of operation.
Adequate and suitable manpower is provided to cater to the regular
operations, changes in technology, mechanisations and innovative
practices. The vacancies are filled up primarily by placement of indents by
Railways with Recruitment agencies as per operational and technological
requirements.
The RRB examinations are quite technical in nature entailing large scale
mobilization of men and resources and training of manpower. Railway
overcame all these challenges and successfully conducted the recruitment
in a transparent manner following all laid down guidelines. No instance of
paper leakage or similar malpractice has occurred during the entire
process.
Further, as system improvement, the Ministry of Railways has introduced a
system of publishing the annual calendar from 2024 for recruitment to
various categories of Group ‘C’ posts. The introduction of the annual calendar
is benefitting the aspirants in the following manner:
More opportunities for candidates;
Opportunities to those becoming eligible every year;
Certainty of exams;
Faster Recruitment process, Training and Appointments
Presently, recruitment against 1,43,086 vacancies of non-
gazetted personnel has been taken up on Indian Railways as per
Annual Calendar 2024 and 2025.
During January to December 2024, ten Centralized Employment
Notifications (CENs) for 92,116vacancies were notified for filling up of posts
of Assistant Loco Pilots (ALPs), Technicians, Sub-Inspectors, Constables in
Railway Protection Force (RPF), Junior Engineers (JEs)/ Depot Material
Superintendent (DMS)/ Chemical & Metallurgical Assistant (CMA),
Paramedical Categories, Non-Technical Popular Categories (Graduate), Non-
Technical Popular Categories (Under-Graduate), Ministerial & Isolated
Categories and Level-1 categories such as Assistants, Track Maintainers
and Pointsman.
First stage/Single stage Computer Based Tests (CBTs) for 92,116 posts have
been completed. Details are as under: -Exam Candidates Cities Languages
1st Stage CBT for the post of ALP (18,799 18,40,347 156 15
vacancies)
CBT for the post of Technician (14,298 26,99,892 139 15
vacancies)
1st Stage CBT for the post of JE/DMS/CMA 11,01,266 146 15
(7,951 vacancies)
CBT for the post of RPF-SI (452 vacancies) 15,35,635 143 15
CBT for the post of RPF-Constable (4,208 45,30,288 147 15
vacancies)
CBT for Paramedical Categories (1,376 7,08,321 143 15
vacancies)
1st Stage CBT for Non-Technical Popular 58,41,774 141 15
Categories (Graduate) (8,113 vacancies)
1st Stage CBT for Non-Technical Popular 63,27,473 157 15
Categories (Under Graduate) (3,445
vacancies)
CBT for Ministerial & Isolated categories 4,46,013 139 15
(1,036 vacancies)
CBT for level-1 post (32438 vacancies) 1,08,28,261 152 15
Total Candidates 3,58,59,270
2nd stage CBTs for the posts of ALP, JE/DMS/CMA and Non-Technical Popular
Categories (Graduate & Under-Graduate) have also been completed. Details
are as under: -
Exam Candidates Cities Languages
2nd Stage CBT for the post of ALP 2,66,363 112 15
(18,799 vacancies)
2nd Stage CBT for the post of 1,17,339 118 15
JE/DMS/CMA
(7,951 vacancies)
2nd Stage CBT for Non-Technical Popular 1,21,931 129 15
Categories (Graduate) (8,113 vacancies)
2nd Stage CBT for Non-Technical Popular 51,978 79 15
Categories (Under-Graduate) (3,445
vacancies)
Total Candidates 5,57,611Computer Based Aptitude Test (CBAT) for the post of ALP and Non-Technical
Popular Categories (Graduate) and Computer based Skill Test for the post of
Non-Technical Popular Categories (Graduate and Under Graduate) and
Ministerial & Isolated Categories have also been completed. Details are
as under: -
Exam Candidates Cities Languages
CBAT for the post of ALP 1,32,044 84 2
Translation Test for Ministerial and 1,233 8 2
Isolated Categories
CBAT for the post of Non-Technical 13,616 38 2
Popular Categories (Graduate)
Computer Based Typing Skill Test 30,341 58 2
(CBTST) for the post of Non-Technical
Popular Categories (Graduate-level)
Computer Based Typing Skill Test 13,145 44 2
(CBTST) for the post of Non-Technical
Popular Categories (Under-Graduate-
level)
Total Candidates 1,90,379
Panels for more than 41,000 candidates for various posts including the posts
of Technicians, Junior Engineers, Paramedical Categories, Sub-
Inspectors & Constable (RPF) and Assistant Loco Pilots have
been finalised. Majority of them are in safety categories.
In addition, as per Annual Calendar for the year 2025, nine Centralized
Employment Notifications (CENs) for 50,970 vacancies have also been
issued. Details are as under:
CEN No. Post Name No. of Month
Vacancies of Notification
notified
01/2025 Assistant Loco Pilots 9,970 March 2025
02/2025 Technician 6,238 June 2025
03/2025 Paramedical categories 434 July 2025
04/2025 Section Controller 368 August 2025
Junior Engineer/ Depot 2,585 October 2025
05/2025 Material SuperintendentNon-Technical Popular 5,810 October 2025
06/2025 Categories (Graduate)
Non-Technical Popular 3,058 October 2025
Categories (Under-
07/2025 Graduate)
December
08/2025 Isolated Categories 312 2025
December
09/2025 level-1 22,195 2025
First stage/Single stage Computer Based Tests (CBTs) for 2,953 posts have
been completed. Details are as under: -
Exam Candidates Cities Languages
CBT for the post of Section Controller 131 15
4,33,748
(368 vacancies)
1st Stage CBT for the post of JE/DMS 5,74,351 133 15
(2585 vacancies)
Total Candidates 10,08,099
*****