Executive Summary:
This document contains the Indian government's response to Lok Sabha Unstarred Question No. 520 regarding renewable energy promotion. It details the renewable energy production over the past three years, measures and schemes to promote renewable energy, steps to implement green energy corridors, and subsidy allocation and disbursement for renewable energy sources. The document includes annexures providing further details on specific schemes, initiatives, and financial assistance.
Key Points / Main Content:
Renewable Energy Production:
* Renewable energy generation in India: 365.65 Billion Units (2022-23), 359.89 Billion Units (2023-24), and 403.64 Billion Units (2024-25).
Government Initiatives to Promote Renewable Energy:
* Bidding trajectory for 50 GW/annum RE power procurement bids by REIAs from FY 2023-24 to FY 2027-28.
* 100% FDI permitted under the automatic route.
* Waiver of ISTS charges for interstate sale of solar and wind power (commissioned by June 30, 2025), Green Hydrogen Projects (till December 2030) and offshore wind projects (till December 2032).
* RPO followed by RCO trajectory notified until 2029-30, with penalties for non-compliance.
* Standard Bidding Guidelines issued for tariff-based competitive bidding for power procurement from various RE projects.
* Launch of schemes like PM KUSUM, PM Surya Ghar Muft Bijli Yojana, National Green Hydrogen Mission, and VGF Scheme for Offshore Wind Energy Projects.
* Implementation of the Scheme for setting up Solar Parks and Ultra Mega Solar Power projects.
* Issuance of Electricity Rights of Consumers Rules, 2020, for net-metering up to 500 kW.
* Issuance of National Repowering and Life Extension Policy for Wind Power Projects, 2023.
* Issuance of Strategy for Establishments of Offshore Wind Energy Projects with a bidding trajectory of 37 GW by 2030.
* Notification of the Offshore Wind Energy Lease Rules, 2023.
* Launch of Standard Labelling (SL) programs for Solar Photovoltaic modules and Grid-connected Solar Inverters.
* Preparation of transmission plan till 2030 to augment transmission infrastructure.
* Notification of Electricity Late Payment Surcharge (LPS) Rules.
* Notification of Electricity Promoting Renewable Energy Through Green Energy Open Access Rules, 2022, allowing Green Energy Open Access to consumers with a contract demand of 100 kW or above.
* Launch of Green Term Ahead Market (GTAM) to facilitate sale of Renewable Energy Power through exchanges.
* Issuance of orders for power dispatch against Letter of Credit (LC) or advance payment.
Green Energy Corridors (GEC):
* Phase-I (InSTS): Projects in eight states (Andhra Pradesh, Gujarat, Himachal Pradesh, Karnataka, Maharashtra, Madhya Pradesh, Rajasthan, and Tamil Nadu) for 9,767 ckm of transmission lines and 22,689 MVA substation capacity for 24 GW RE integration.
* Phase-II (InSTS): Projects in seven states (Gujarat, Himachal Pradesh, Karnataka, Kerala, Rajasthan, Tamil Nadu, and Uttar Pradesh) for 7,919 ckm of transmission lines and 24,488 MVA of substations for 20 GW RE evacuation.
Financial Assistance:
* No State-wise allocation of funds; CFA released according to scheme guidelines.
* State/UT-wise details of CFA released under major schemes provided in Annexure III.
Major Ongoing Renewable Energy Schemes/Programmes:
* Scheme for Development of Solar Parks and Ultramega Solar Power Projects (40,000 MW target).
* PM-Surya Ghar: Muft Bijli Yojana (Rooftop solar for One Crore households by 2026-27).
* Production Linked Incentive Scheme (National Programme on High Efficiency Solar PV Modules).
* PM-KUSUM Scheme (Decentralized solar plants, solar pumps, and solarization of agriculture pumps).
* CPSU Scheme Phase-II (12,000 MW grid-connected Solar PV Projects by Government Producers).
* National Green Hydrogen Mission.
* Green Energy Corridors (GEC).
* Viability Gap Funding (VGF) Scheme for Offshore Wind Energy Projects (1 GW).
* Bio-Energy Programme (Waste to Energy, Biomass Programme, and Biogas Programme).
* Renewable Energy Research and Technology Development (RERTD) Programme.
* Human Resource Development Scheme.
* New Solar Power Scheme for Tribal and PVTG Habitations/Villages under PM-JANMAN and DA-JGUA.
Impact Analysis:
Renewable Energy Implementing Agencies (REIAs):
* Impact: Expected to issue RE power procurement bids of 50 GW/annum.
* Action Required: Plan and execute bidding processes as per the MNRE's bidding trajectory.
Renewable Energy Developers:
* Impact: Benefit from facilitated land and transmission access via Solar Park schemes, financial assistance, and streamlined bidding processes.
* Action Required: Participate in bidding processes, leverage available schemes, and align with standard bidding guidelines.
Consumers (Especially those with a contract demand of 100 kW or above):
* Impact: Access to affordable, reliable, and sustainable green energy through Green Energy Open Access.
* Action Required: Utilize Green Energy Open Access by complying with the Electricity Promoting Renewable Energy Through Green Energy Open Access Rules, 2022.
Farmers:
* Impact: Benefit from PM KUSUM scheme, including decentralized solar plants, solar agriculture pumps, and solarization of existing pumps.
* Action Required: Participate in the PM KUSUM scheme and utilize the benefits.
States and Union Territories:
* Impact: Implementing Green Energy Corridor projects and other renewable energy schemes, receiving CFA based on scheme guidelines.
* Action Required: Effectively implement renewable energy schemes, set up transmission infrastructure, and coordinate with MNRE for fund disbursement.
Manufacturing Sector (Solar PV Modules):
* Impact: Beneficiaries of the Production Linked Incentive Scheme to achieve GW-scale manufacturing capacity.
* Action Required: Leverage PLI scheme, establish/expand manufacturing capacity for high-efficiency solar PV modules.
Tribal and PVTG Habitations/Villages:
* Impact: Access to off-grid solar lighting through the New Solar Power Scheme under PM-JANMAN and DA-JGUA.
* Action Required: Collaborate with relevant authorities to implement solar lighting projects.
Key Entities Referenced
Ministry of New and Renewable Energy MNRE: The primary ministry responsible for promoting and accelerating renewable energy capacity in India.
Green Energy Corridor GEC: A scheme undertaken by the MNRE to create dedicated transmission systems for the evacuation and grid integration of renewable energy.
Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan PM KUSUM: A scheme for setting up decentralized solar or other renewable energy power plants and solarizing agriculture pumps.
PM Surya Ghar Muft Bijli Yojana: A scheme for installing rooftop solar for One Crore households by 2026-27.
National Green Hydrogen Mission: A mission launched with the aim to make India a Global Hub for the production, utilization and export of Green Hydrogen and its derivatives.
Gujarat: One of the states where Intra-State Transmission System projects are being implemented under the Green Energy Corridor scheme and Viability Gap Funding Scheme for Offshore Wind Energy Projects.
Tamil Nadu: One of the states where Intra-State Transmission System projects are being implemented under the Green Energy Corridor scheme and Viability Gap Funding Scheme for Offshore Wind Energy Projects.
Rajasthan: One of the states where Intra-State Transmission System projects are being implemented under the Green Energy Corridor scheme.
GOVERNMENT OF INDIA
MINISTRY OF NEW AND RENEWABLE ENERGY
LOK SABHA
UNSTARRED QUESTION NO. 520
ANSWERED ON 23/07/2025
SCHEMES TO PROMOTE RENEWABLE ENERGY SOURCE
520. SHRI Y S AVINASH REDDY
Will the Minister of NEW AND RENEWABLE ENERGY be pleased to state:
(a) the total renewable energy produced in the country during the last three years;
(b) the details of measures taken/proposed to be taken and schemes introduced by the Government
to promote renewable energy sources;
(c) the steps taken/being taken by the Government to implement green energy corridors; and
(d) the amount of subsidy allocated and disbursed during the last three years and the current year for
adopting renewable energy sources, State/UT-wise?
ANSWER
THE MINISTER OF STATE FOR NEW & RENEWABLE ENERGY AND POWER
(SHRI SHRIPAD YESSO NAIK)
(a) The details of renewable energy produced in the country during the last three year are given
below:
Year Generation (in Billion Units)
2022-23 365.65
2023-24 359.89
2024-25 403.64
Source: Central Electricity Authority (CEA)
(b) The Government has taken several steps and initiatives to promote and accelerate renewable
energy capacity in the country, as given at Annexure-I.
Further, to promote development of renewable energy in the country, Government has
introduced various schemes. The list of major ongoing schemes being implemented by the
Ministry of New & Renewable Energy (MNRE) is given at Annexure-II.
(c) The MNRE has undertaken phased initiatives under the Green Energy Corridor (GEC)
scheme to support the creation of dedicated transmission systems for the evacuation and grid
integration of renewable energy (RE). Under Phase-I of the Intra-State Transmission System
(InSTS), projects are being implemented in eight States (Andhra Pradesh, Gujarat, Himachal
Pradesh, Karnataka, Maharashtra, Madhya Pradesh, Rajasthan, and Tamil Nadu) for developing
9,767 circuit kilometers (ckm) of transmission lines and 22,689 MVA of substation capacity for
integration of 24 GW of RE.
Subsequently, GEC Phase-II (InSTS) included seven States (Gujarat, Himachal Pradesh,
Karnataka, Kerala, Rajasthan, Tamil Nadu, and Uttar Pradesh) for developing 7,919 ckm of
transmission lines and 24,488 MVA of substations for the evacuation of 20 GW of RE.
(d) No State-wise allocation of funds is made by the Ministry. The Central Financial Assistance
(CFA) is released in accordance with the respective scheme guidelines. State/ UT-wise details
of the CFA released under major ongoing schemes/ programmes of the Ministry during the last
three years and the current year are given at Annexure-III.
*****Annexure-I
Annexure-I referred to in reply of part (b) of the Lok Sabha Unstarred Question
No. 520 to be answered on 23.07.2025
The Government of India has taken several steps and initiatives to promote and accelerate
renewable energy capacity in the country. These include, inter-alia, the following:
• Ministry of New & Renewable Energy (MNRE) has issued Bidding Trajectory for issuance of
RE power procurement bids of 50 GW/annum by Renewable Energy Implementing Agencies
(REIAs) [REIAs: Solar Energy Corporation of India Limited (SECI), NTPC Limited, NHPC
Limited, SJVN Limited] from FY 2023-24 to FY 2027-28.
• Foreign Direct Investment (FDI) has been permitted up to 100 percent under the automatic
route.
• Inter State Transmission System (ISTS) charges have been waived for inter-state sale of solar
and wind power for projects to be commissioned by 30th June 2025, for Green Hydrogen
Projects till December 2030 and for offshore wind projects till December 2032.
• To boost RE consumption, Renewable Purchase Obligation (RPO) followed by Renewable
Consumption Obligation (RCO) trajectory has been notified till 2029-30. The RCO which is
applicable to all designated consumers under the Energy Conservation Act 2001 will attract
penalties on non-compliance. RCO also includes specified quantum of consumption from
Decentralized Renewable Energy sources.
• Standard Bidding Guidelines for tariff based competitive bidding process for procurement of
Power from Grid Connected Solar, Wind, Wind-Solar Hybrid and Firm & Dispatchable RE
(FDRE) projects have been issued.
• Schemes such as Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-
KUSUM), PM Surya Ghar Muft Bijli Yojana, National Programme on High Efficiency Solar
PV Modules, New Solar Power Scheme (for Tribal and PVTG Habitations/Villages) under
Pradhan Mantri Janjati Adivasi Nyaya Maha Abhiyan (PM JANMAN) and Dharti Aabha
Janjatiya Gram Utkarsh Abhiyan (DA JGUA), National Green Hydrogen Mission, Viability
Gap Funding (VGF) Scheme for Offshore Wind Energy Projects have been launched.
• Scheme for setting up of Solar Parks and Ultra Mega Solar Power projects is being implemented
to provide land and transmission to RE developers for installation of RE projects at large scale.
• Laying of new transmission lines and creating new sub-station capacity has been funded under
the Green Energy Corridor Scheme for evacuation of renewable power.
• Electricity (Rights of Consumers) Rules, 2020 has been issued for net-metering up to five
hundred Kilowatt or up to the electrical sanctioned load, whichever is lower.
• “National Repowering and Life Extension Policy for Wind Power Projects, 2023” has been
issued.• “Strategy for Establishments of Offshore Wind Energy Projects” has been issued indicating a
bidding trajectory of 37 GW by 2030 and various business models for project development.
• The Offshore Wind Energy Lease Rules, 2023 have been notified vide Ministry of External
Affairs notification dated 19th December 2023, to regulate the grant of lease of offshore areas
for development of offshore wind energy projects.
• Standard & Labelling (S&L) programs for Solar Photovoltaic modules and Grid-connected
Solar Inverters have been launched.
• To augment transmission infrastructure needed for steep RE trajectory, transmission plan has
been prepared till 2030.
• “The Electricity (Late Payment Surcharge and related matters) Rules (LPS rules) have been
notified.
• Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022,
has been notified on 06th June 2022 with objective of ensuring access to affordable, reliable,
and sustainable green energy for all. Green Energy Open Access is allowed to any consumer
with contract demand of 100 kW or above through single or multiple single connection
aggregating Hundred kW or more located in same electricity division of a distribution licensee.
• Green Term Ahead Market (GTAM) has been launched to facilitate sale of Renewable Energy
Power through exchanges.
• Government has issued orders that power shall be dispatched against Letter of Credit (LC) or
advance payment to ensure timely payment by distribution licensees to RE generators.Annexure-II
Annexure-II referred to in reply of part (b) of the Lok Sabha Unstarred Question
No. 520 to be answered on 23.07.2025
Details of the major ongoing Renewable Energy Schemes / Programmes
1. Scheme for Development of Solar Parks and Ultra-mega Solar Power Projects with a target of setting
up 40,000 MW capacity. Under the scheme, the infrastructure such as land, roads, power evacuation
system water facilities are developed with all statutory clearances/approvals. Thus, the scheme helps
expeditious development of utility-scale solar projects in the country.
2. PM-Surya Ghar: Muft Bijli Yojana for installing rooftop solar for One Crore households by 2026-27.
3. Production Linked Incentive scheme ‘National Programme on High Efficiency Solar PV Modules’
for achieving manufacturing capacity of Giga Watt (GW) scale in High Efficiency Solar PV modules
(Tranche- I & II).
4. PM-KUSUM Scheme for setting up decentralized solar or other renewable energy power
plants, installation of stand-alone solar agriculture pumps, and solarization of existing grid-
connected agriculture pumps, including feeder-level solarization. The scheme benefits not
only farmers but also the States and DISCOMs.
5. Central Public Sector Undertaking (CPSU) Scheme Phase-II (Government Producer Scheme) for
setting up 12,000 MW grid-connected Solar Photovoltaic (PV) Power Projects by Government
Producers, using domestically manufactured solar PV cells and modules, with Viability Gap Funding
(VGF) support, for self-use or use by Government/ Government entities, either directly or through
Distribution Companies (DISCOMS).
6. National Green Hydrogen Mission launched with aim to make India a Global Hub for production,
utilization and export of Green Hydrogen and its derivatives.
7. Green Energy Corridors (GEC): to create intra-state transmission system for renewable energy
projects. Central Financial Assistance (CFA) is provided to set up transmission infrastructure for
evacuation of Power from Renewable Energy projects in total ten States (considering both the phases
of GEC).
(i) Intra-State Transmission System Green Energy Corridor Phase-I in eight States
(ii) Green Energy Corridor Phase-II
a) Intra-State Transmission System in Seven States
b) Inter-State Transmission System for 13 GW RE Projects in Ladakh
8. Viability Gap Funding (VGF) Scheme for Offshore Wind Energy Projects for installation and
commissioning of 1 GW of Offshore Wind Energy Projects (500 MW each off the coast of Gujarat
and Tamil Nadu), also for upgradation of two ports to meet logistics requirements for offshore wind
energy projects.
9. Bio-Energy Programme:• Waste to Energy Programme : Programme on Energy from Urban, industrial and Agricultural
Wastes/Residues
• Biomass Programme: Scheme to Support Manufacturing of Briquettes & Pellets and Promotion
of Biomass (non-bagasse) based cogeneration in Industries.
• Biogas Programme : for promotion of family type Biogas plants
10. Renewable Energy Research and Technology Development (RE-RTD) Programme.
11. Human Resource Development Scheme with components such as short-term trainings & skill
development programmes, fellowships, internships, support to lab upgradation for RE and renewable
energy chair.
12. New Solar Power Scheme (for Tribal and PVTG Habitations/Villages) under Pradhan Mantri Janjati
Adivasi Nyaya Maha Abhiyan (PM JANMAN) and Dharti Aabha Janjatiya Gram Utkarsh Abhiyan
(DA JGUA) with a provision for providing off-grid Solar Lighting where electricity supply through
grid is not techno-economically feasible.Annexure-III
Annexure-III referred to in reply of part (d) of the Lok Sabha Unstarred Question
No. 520 to be answered on 23.07.2025
State-wise details of CFA released for the Renewable Energy projects under the major ongoing
schemes being implemented by the Ministry during 2022-23
Rs. in Crore
Waste
Solar Rooftop PM
State CPSU Biomass Biogas to GEC
Parks Solar KUSUM
Energy
A&N Islands
Andhra
5.6 50.47
Pradesh
Arunachal
0.82
Pradesh
Assam 4.9 0.11
Bihar 1.75
Chandigarh 2
Chhattisgarh 3.3 3.70
Dadra &
Nagar Haveli
1.5
and Daman &
Diu
Delhi 10.85
Goa
Gujarat 522.17 1040.21 7.83 1.38 27.97
Haryana 14.72 137.95 3.53
Himachal
11.7 5.85 4.02
Pradesh
Jammu &
1.2 15.69
Kashmir
Jharkhand 3 20.04
Karnataka 9.93 0.12 17.50
Kerala 2.52 104.45
Ladakh
Lakshadweep
Madhya
109.36 35.47 32.25 0.29 96.77
Pradesh
Maharashtra 12 58.95 247.60 1.75 3.04 5.08
Manipur 0.23
Meghalaya
Mizoram 1.28 0.8
Nagaland 0.20
Odisha 0.6 0.40 0.47
Puducherry 0.01
Punjab 46.2 31.11 1.73 2.11
Rajasthan 96.31 247.63 0.10 10.85
Sikkim
Tamil Nadu 20.54 1.03 0.34 87.81
Telangana 43.9 0.33
Tripura 0.12
Uttar Pradesh 28.78 5.92 82.30 1.82
Uttarakhand 1.84 4.00
West Bengal 10.2 0.07Annexure-III contd…
State-wise details of CFA released for the Renewable Energy projects under the major ongoing
schemes being implemented by the Ministry during 2023-24
Rs. in Crore
Waste
Solar Rooftop PM
State CPSU Biomass Biogas to GEC
Parks Solar KUSUM
Energy
A&N Islands 0.01
Andhra
4.5 22.45 2.74 47.54
Pradesh
Arunachal
2.12 0.39
Pradesh
Assam 2.11 1.26
Bihar 9.8
Chandigarh 3.34
Chhattisgarh 14.3 1.43 0.95
Dadra &
Nagar Haveli
0.11
and Daman &
Diu
Delhi 6.12 0.23
Goa 0.3 3.00
Gujarat 505.13 644.91 28.72 145.91 8.14 23.85
Haryana 24.64 429.78
Himachal
2.4 40.50
Pradesh
Jammu &
Kashmir
Jharkhand 2.36
Karnataka 11.68 2.38 112.35 6.77 6.61 147.12
Kerala 199.89 28.53
Ladakh
Lakshadweep
Madhya
59.26 31.39 0.80 6.97 0.84 22.26
Pradesh
Maharashtra 314.75 326.22 0.07 13.02 0.56
Manipur 0.9 0.17 0.22
Meghalaya 0.31 0.22
Mizoram
Nagaland 0.18 0.18
Odisha 3.08 3.44 0.32
Puducherry 0.39
Punjab 23.83 5.41 2.34
Rajasthan 97.51 104.08 49.41 692.07 1.97 0.35 53.73
Sikkim
Tamil Nadu 13.94 2.59 80.97 0.47 2.36
Telangana 23.24 27.39 0.29
Tripura 0.04 17.81 0.70
Uttar Pradesh 39.30 61.06 92.13 1.84 4.71
Uttarakhand 10.77 0.77
West Bengal 2.14Annexure-III contd…
State-wise details of CFA released for the Renewable Energy projects under the major ongoing
schemes being implemented by the Ministry during 2024-25
Rs. in Crore
Waste
Solar Rooftop PM PM
State CPSU Biomass Biogas to GEC
Parks Solar KUSUM JANMAN
Energy
A&N Islands 0.09
Andhra
83.90 111.42 0.37 1.84 0.72 11.87
Pradesh
Arunachal
1.91 0.31
Pradesh
Assam 64.33
Bihar 53.76 0.70
Chandigarh 6.28
Chhattisgarh 2.80 8.80 0.72
Dadra &
Nagar Haveli
0.67
and Daman
& Diu
Delhi 10.75 0.41
Goa 14.47 0.03
Gujarat 3251.13 59.95 342.20 3.06 17.77
Haryana 207.42 303.40 2.04 0.11 7.43
Himachal
18.41 1.73
Pradesh
Jammu &
59.85 12.90
Kashmir
Jharkhand 19.37 48.73 6.43
Karnataka 81.01 0.89 0.63 4.00 0.95 8.30 24.65
Kerala 7.40 801.27 1.72 0.04
Ladakh 2.67
Lakshadweep 1.97
Madhya
73.9 266.92 3.83 10.20
Pradesh
Maharashtra 1248.62 1619.00 27.77 10.20
Manipur 2.56 0.17
Meghalaya 0.08
Mizoram 2.24 1.46 0.84
Nagaland 0.16
Odisha 25.30 0.26
Puducherry 5.11
Punjab 81.18 13.09 7.60 2.21
Rajasthan 48.5 321.04 295.20 211.30 1.69
Sikkim 0.02
Tamil Nadu 172.64 6.48 1.76 4.95 15.18 10.47
Telangana 89.52 1.30 0.44 0.85 5.37
Tripura 1.14 9.31 5.96 0.91
Uttar Pradesh 155.1 684.83 173.01 0.51 0.58 23.79 292.93
Uttarakhand 163.26 15.60 1.29 0.20
West Bengal 0.10 0.01Annexure-III contd…
State-wise details of CFA released for the Renewable Energy projects under the major ongoing
schemes being implemented by the Ministry during 2025-26 (Upto June 2025)
Rs. in Crore
Waste
Solar Rooftop PM PM
States/ UTs CPSU Biomass Biogas to GEC
Parks Solar KUSUM JANMAN
Energy
A&N Islands 0.29
Andhra
116.01 0.13 11.62
Pradesh
Arunachal
Pradesh
Assam 74.14 1.41
Bihar 24.38 1.05
Chandigarh 1.07
Chhattisgarh 9.87
Dadra &
Nagar Haveli
1.72
and Daman &
Diu
Delhi 8.66 0.61 0.50
Goa 1.77 0.43
Gujarat 654.02 199.05
Haryana 62.39 135.74
Himachal
11.35
Pradesh
Jammu &
37.57
Kashmir
Jharkhand 55.00 2.39 16.37
Karnataka 24.50 82.15
Kerala 1.14 240.20 18.98
Ladakh 2.01
Lakshadweep 1.74
Madhya
106.89 7.95 20.63 0.17
Pradesh
Maharashtra 551.30 812.02
Manipur 1.18
Meghalaya 0.03
Mizoram 1.22
Nagaland 0.03 0.02
Odisha 2.98 30.83 4.09
Puducherry 3.05
Punjab 14.10 10.90
Rajasthan 138.54 85.09
Sikkim 0.03
Tamil Nadu 63.29 5.71
Telangana 37.89
Tripura 2.21 0.99
Uttar Pradesh 398.42 21.73 0.35 477.57
Uttarakhand 120.73 7.10
West Bengal 0.42