**Executive Summary**
This document provides answers to questions raised in the Lok Sabha regarding the introduction of semi-high-speed train services, specifically Vande Bharat, and the upgrades to railway infrastructure. It details the introduction of Vande Bharat trains, the ongoing railway infrastructure projects, the modernization of signalling systems, and the redevelopment of railway stations under the Amrit Bharat Station Scheme. The information pertains to activities that have occurred or are projected up to the financial year 2025-26.
**Key Points / Main Content**
* **Vande Bharat Services:**
* Indian Railways has introduced Vande Bharat services, which are semi-high-speed trains, to improve travel experience and safety.
* These trains have features like KAVACH system, faster acceleration, fully sealed gangway, automatic plug doors, better ride comfort, mini pantry, bottle cooler, deep freezer & hot water boiler, reclining ergonomic seats, comfortable seating with revolving seats in executive class, mobile charging sockets, special lavatory for Divyangjan passengers, and CCTVs.
* 164 Vande Bharat train services are operational on Broad Gauge (B.G.) electrified network.
* 62 Vande Bharat train services have been introduced during the 2024-25 and 2025-26 period.
* A list of 31 routes is provided, including but not limited to: KSR Bengaluru- Ernakulam Jn. Express, Banaras - Khajuraho Express, Delhi - Firozpur Cantt. Jn. Express, Saharanpur - Gomtinagar Express
* **Railway Infrastructure Projects:**
* To improve capacity, expansion of the rail network has been undertaken.
* From 2014-2025, 34,428 Km of new tracks were commissioned at an average of 8.57 Km/day.
* As of 01.04.2025, 431 railway infrastructure projects (154 New Line, 33 Gauge Conversion, and 244 Doubling) are sanctioned, with a total length of 35,966 Km and an approximate cost of βΉ. 6.75 lakh crore.
* Summary of total expenditures includes: 1,45,318 Cr for New Lines, 22,753 Cr for Gauge Conversion, and 1,22,858 Cr for Doubling/Multitracking, totalling 2,90,929 Cr.
* **Signalling System Modernization:**
* Indian Railways is modernising and upgrading tracks and signalling systems.
* Measures include modern track structures, Thick Web Switches, increased supply of long rail panels, improved welding technology, mechanized track maintenance, and deployment of advanced machinery.
* Electrical/Electronic Interlocking Systems have been provided at 6656 stations as of 31.10.2025.
* Interlocking of Level Crossing Gates has been provided at 10098 Level Crossing Gates up to 31.10.2025.
* Axle counters have been provided on 6142 Block Sections up to 31.10.2025.
* Automatic Block Signalling has been provided at 6341 Route km up to 31.10.2025.
* **Station Redevelopment (Amrit Bharat Station Scheme):**
* Ministry of Railways launched the Amrit Bharat Station Scheme for station redevelopment.
* The scheme involves master planning for improvements including station access, integration with the city, station building improvement, and amenities for passengers and Divyangjans.
* 1337 stations have been identified for development under this scheme, with 160 stations having completed works.
**Impact Analysis**
**Stakeholder: Passengers**
* **Impact:** Improved travel experience, enhanced safety, and better amenities at stations.
* **Action Required:** Utilize the Vande Bharat services and new station facilities as they become available.
**Stakeholder: Railway Employees**
* **Impact:** Modernized infrastructure, advanced technology for track maintenance, and potential need for training on new systems.
* **Action Required:** Adapt to new technologies and maintenance procedures.
**Stakeholder: Economy/Freight**
* **Impact:** More efficient freight transport due to track and signal upgrades, leading to potential economic benefits.
* **Action Required:** N/A
**Stakeholder: Government/Ministry of Railways**
* **Impact:** Responsible for managing and overseeing the implementation of the Vande Bharat train service project, railway infrastructure upgrades, and station redevelopments under the Amrit Bharat Station Scheme, ensuring these projects align with long-term strategic goals.
* **Action Required:** Allocate resources and oversee all elements of project implementation.
Key Entities Referenced
Indian Railways: The primary entity undertaking the modernization and infrastructure upgrades described in the document.
Vande Bharat: Semi-high speed train services recently introduced by Indian Railways.
Amrit Bharat Station Scheme: A scheme launched by the Ministry of Railways for redevelopment of stations with a long-term approach.
KAVACH: An automatic train protection system being implemented.
Plan Head-53 'Customer Amenities': The head of account under which the Development / Upgradation / Modernisation of stations including under Amrit Bharat Station Scheme is generally funded.
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 2937
TO BE ANSWERED ON 17.12.2025
SEMI HIGH SPEED TRAIN CORRIDORS
2937. SHRI VISHALDADA PRAKASHBAPU PATIL:
SHRI SHRIRANG APPA CHANDU BARNE:
SHRI RAVINDRA DATTARAM WAIKAR:
SHRI NARESH GANPAT MHASKE:
SMT. BHARTI PARDHI:
DR. SHRIKANT EKNATH SHINDE:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Government has launched any new semi-high-speed train
services or corridors during the year 2025 and if so, the details thereof;
(b) the details of the routes and cities covered under this new service and
the projected travel time reduction;
(c) the details of the investment made for upgrading railway infrastructure
to support these trains;
(d) whether there have been any challenges in implementing these upgrades
and if so, the details thereof and the manner in which they have been
addressed; and
(e) the details of the expected impact of these initiatives on passenger
convenience and freight efficiency?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (e) Indian Railways have introduced Vande Bharat services which are
semi-high speed trains and are aimed to provide better travel experience and
improved safety to the passengers. These services are equipped with enhanced
safety features and modern passenger amenities like-
--2/---2--
β KAVACH system
β Faster acceleration
β Fully Sealed Gangway
β Automatic Plug Doors
β Better Ride Comfort
β Mini Pantry with provision of Hot Case
β Bottle Cooler
β Deep freezer & Hot water Boiler
β Reclining Ergonomic Seats
β Comfortable Seating with revolving seats in executive class
β Mobile charging sockets for every seat
β Special lavatory for Divyangjan passengers in Driving Trailer
Car(DTC),
β CCTVs, etc.
Presently, 164 Vande Bharat train services are operational on the various
sectors of the Broad Gauge (B.G.) electrified network of Indian Railways (IR). Of
these, the following 62Vande Bharat train services, have been introduced
during the 2024-25 and 2025-2026:
1. 26651/26652 KSR Bengaluru- Ernakulam Jn. Express
2. 26506 /26505 Banaras - Khajuraho Express
3. 26461/26462 Delhi - Firozpur Cantt. Jn. Express
4. 26503/26504 Saharanpur - Gomtinagar Express
5. 26471/26472 Bikaner - Delhi Cantt. Express
6. 26481/26482 Jodhpur - Delhi Cantt. Express
7. 26301/26302 Jogbani- Danapur Express
8. 26101/26102 Pune Jn. βAjni(Nagpur) Express
--3/---3--
9. 26751/26752 Belagavi - KSR BengaluruExpress
10. 26405/26406 Amritsar Jn. - Shri Mata Vaishno Devi Katra Express
11. 26501/26502 Gorakhpur - Patliputra Express
12. 26401/26402 Shri Mata Vaishno Devi Katra - Srinagar Express
13. 26403/26404 Shri Mata Vaishno Devi Katra - Srinagar Express
14. 26901/26902 Sabarmati - Veraval Express
15. 20175/20176 Banaras - Agra Cantt. Express
16. 21893/21894 Tatanagar- Patna Express
17. 21895/21896 Tatanagar- Patna Express
18. 20829/20830 Durg - Visakhapatnam Express
19. 20101/20102 Nagpur - Secunderabad Express
20. 20673/20674 Kolhapur SCSM Terminus - Pune Jn. Express
21. 20893/20894 Tatanagar- Patna Express
22. 22303/22304 Howrah - Gaya Express
23. 20891/20892 Tatanagar- Brahmapur Express
24. 20871/20872 Howrah - Rourkela Express
25. 20669/20670 Hubballi - Pune Jn. Express
26. 22309/22310 Howrah - Jamalpur Express
27. 22499/22500 Varanasi - Deoghar Express
28. 20671/20672 Madurai Jn. - Bangalore Cantt. Express
29. 20981/20982 Udaipur City - Agra Cantt. Express
30. 20627/20628 Chennai Egmore - Nagercoil Jn. Express
31. 22489/22490 Varanasi- Meerut City Jn. Express
--4/---4--
Railway Projects:
To improve the capacity, expansion of rail network has been taken up in a big
way. The details of commissioning/laying of new track across Indian Railways is
given below: -
Period New track Average commissioning of new tracks
Commissioned
2009-14 7,599 Km 4.2 Km/day
2014-25 34,428 Km 8.57 Km/day (more than 2 times)
Further, as on 01.04.2025, across Indian Railways, 431 Railway infrastructure
projects (154 New Line, 33 Gauge Conversion and 244 Doubling) of total length
35,966 Km, costing approx. βΉ. 6.75 lakh crore are sanctioned. The summary is as
under: -
Category No of Total Length Total Exp
Projects Length Commissioned upto Mar'25
NL/GC/DL till Mar 25 (βΉ. in Cr)
(km) (Km)
New Lines 154 16,142 3,036 1,45,318
Gauge 33 4,180 2,997 22,753
Conversion
Doubling 244 15,644 6,736 1,22,858
/Multitracking
Total 431 35,966 12,769 2,90,929
Also, during last three years i.e. 2022-23, 2023-24, 2024-25 and the current
financial year 2025-26, 952 no. Surveys (284 New line, 13 Gauge Conversion and
655 Doubling) of total length 64,891 Km have been sanctioned across Indian
Railways.
--5/---5--
Signalling system:
Upgradation and improvement of railway infrastructure on Indian Railways have
been carried out in a big way during last 11 years. The following measures are
being taken by Indian Railways to modernise and upgrade tracks, signalling
system etc:
i. Modern track structure consisting of 60kg, 90 Ultimate Tensile Strength (UTS)
rails, Wider and heavier Pre-stressed Concrete Sleepers (PSC) with elastic
fastening, fan-shaped layout turnout on PSC sleepers and Steel Channel/H-beam
Sleepers on girder bridges are being used while carrying out primary track
renewals.
ii. The Thick Web Switches and Weldable CMS Crossings are being used in
turnout renewal works.
iii. Supply of 130m/260m long rail panels have been increased to avoid welding
of joints, thereby improving safety.
iv. Thick Web Switch Expansion Joints are being used in place of earlier
Conventional/Improved SEJs.
v. Adoption of better welding technology for rails i.e. Flash Butt Welding.
vi. Adoption of mechanized system for track maintenance using high output
plain tampers and points & crossing tampers for improved maintainability &
reliability of track.
vii. Deployment of state-of-the-art modern machines including Rail Grinding
Machines to further improve asset reliability.
viii. Mechanisation of track laying activities through use of track machines like
PQRS, TRT, T-28 etc.
ix. Use of advanced Phased Array technology of testing of rail and welds.
x. Deployment of Integrated Track Monitoring Systems (ITMS) and Oscillation
Monitoring System (OMS) for comprehensive health assessment to ascertain
optimal maintenance requirements.
--6/---6--
xi. Adoption of portable Track Measuring Trolley for continuous recording of
track parameters in yards.
xii. Using web enabled Track Management System (TMS) for integration and
data analytics of the track inspection records received through various sources
to enable precise maintenance inputs.
xiii. Electrical/Electronic Interlocking Systems with centralized operation of
points and signals in place of old mechanical signalling have been provided at
6656 stations as on 31.10.2025.
xiv. Interlocking of Level Crossing Gates (LC) has been provided at 10098 Level
Crossing Gates upto 31.10.2025 for enhancing safety at LC Gate.
xv. Axle counters for automatic clearance of Block Section, BPAC (Block
Proving Axle Counter) are provided to ensure complete arrival of train without
manual intervention before granting line clear to receive next train and to
reduce human element. These systems have been provided on 6142 Block
Sections up to 31.10.2025.
xvi.Automatic Block Signalling (ABS) that enhances line capacity within existing
track infrastructure has been provided at 6341 Route km upto 31.10.2025.
As a result of above measures, there has been a significant increase in the
speed potential of the rail network. The details of speed potential of entire
railway network over Indian Railways during 2025 vis-a-vis 2014 are as under:
Sectional 2014 2025 (up to Nov'25)
Speed Track Km % Track Km %
(kmph)
130 & 5,036 6.3 23,010 21.8
above
110-130 26,409 33.3 60,726 57.5
<110 47,897 60.4 21,936 20.8
Total 79,342 100 1,05,672 100
--7/---7--
Redevelopment of Stations
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their implementation in
phases to improve the stations. The master planning includes:
β Improvement of access to station and circulating areas
β Integration of station with both sides of city
β Improvement of station building
β Improvement of waiting halls, toilets, sitting arrangement, water booths
β Provision of wider foot over bridge/air concourse commensurate with
passenger traffic
β Provision of lift/escalators/ramp
β Improvement/Provision of platform surface and cover over platforms
β Provision of kiosks for local products through schemes like 'One Station
One Productβ
β Parking areas, Multimodal integration
β Amenities for Divyangjans
β Better passenger information systems
β Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity at each
station
The scheme also envisages sustainable and environment friendly solutions,
provision of ballastless tracks etc. as per necessity, phasing and feasibility and
creation of city centre at the station in the long term.
So far, 1337 stations have been identified for development under this scheme.
Development works at railway stations under Amrit Bharat Station Scheme have
been taken up at a good pace. Till now, works of 160 stations have been
completed.
The works at other stations have also been taken up at good pace and progress
of some of the stations is as given below:
β Tirupati station: The structural framework of new main entry station building
on South side and 2 nos. air concourses have been completed. The finishing
works of new main entry station building on South side and air concourses,
structural work of station building on North side, platform shelter works, lift,
escalators etc. have been taken up.
--8/---8--
β Nellore station: The structural frameworks, brickwork and plastering of
station buildings on both East and West sides and structural work of air
concourse have been completed. The finishing works of station building on both
East and West side and air concourse, extension work of subway, water tanks
and sewage treatment plant have been taken up.
β Yesvantpur station: The structural works of East side station building, civil
works of East side sub-station, East side elevated road and Multi Level Car
parking have been completed. The finishing works of East side station building,
East side elevated road and Multi Level Car parking, sewage treatment plant,
structural work of West side station building and air concourse have been taken
up.
β Bangalore Cantt. station: The works of 24 m wide diversion road on the South
side, training centre, hostel on North side and structural work of South side
station building have been completed. The finishing work South side station
building, structural work of North side station building and Foot Over Bridge have
been taken up.
β Rameswaram station: The structural works of East/North terminal building,
departure forecourt, arrival forecourt, residential tower, sub-station building,
desalination plant and sewage treatment plant have been completed. The
masonry works of East terminal building, finishing works of North terminal
building, departure forecourt, arrival forecourt, residential tower, platform
upgradation including platform shelter and revamping of existing waiting hall
have been taken up.
β Safdarjung station: The work of signal building, station building, plumbing
and firefighting, structural work of operational building up to terrace floor slab,
air concourse foundation and pedestals have been completed. The station
building electrical and low voltage work, platform refurbishing work, finishing
work of operational building, overhead tank and air concourse have been taken
up.
Further, development/redevelopment/upgradation/modernisation of stations on
Indian Railways is a continuous and ongoing process and works in this regard are
undertaken as per requirement, subject to inter-se priority and availability of
funds. The priority for development / redevelopment / upgradation/modernisation
of stations is accorded to higher category of station over lower category of
station while sanctioning and executing the works.
--9/---9--
Development / Upgradation of railway stations is complex in nature involving
safety of passengers & trains and requires various statutory clearances such as
fire clearance, heritage, tree cutting, airport clearance etc. The progress also
gets affected due to brownfield related challenges such as shifting of utilities
(involving water/sewage lines, optical fibre cables, gas pipe lines, power/signal
cables, etc.), infringements, operation of trains without hindering passenger
movement, speed restrictions due to works carried out in close proximity of
tracks and high voltage power lines, etc. and these factors affect the completion
time.
Development / Upgradation / Modernisation of stations including under Amrit
Bharat Station Scheme is generally funded under Plan Head-53 'Customer
Amenities'. The details of allocation and expenditure under Plan Head-53 are
maintained Zonal Railway-wise and not work-wise or station-wise or state-wise.
The fund allocation of βΉ 12,118 crore has been made for the financial year 2025-
26 under Plan Head-53 and expenditure (up to October, 2025) of βΉ7,253 crore has
been incurred so far.
*****