GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
RAJYA SABHA
UNSTARRED QUESTION NO. 575
ANSWERED ON - 04/02/2026
STATUS OF HIGHWAYS IN SOUTHERN DISTRICTS OF ODISHA
575. DR. SASMIT PATRA:
Will the Minister of ROAD TRANSPORT AND HIGHWAYS be pleased to state:
(a) whether Government has reviewed slow progress on key highway corridors including
NH-326, NH-59, NH-130CD and rural roads linking Malkangiri, Rayagada and Koraput;
(b) the details of sanctioned works, delays and cost escalations for Odisha’s southern
districts; and
(c) whether Government propose strict monitoring, contractor accountability and fast-
tracking of these long-pending road projects essential for tribal mobility and economic
integration?
ANSWER
THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS
(SHRI NITIN JAIRAM GADKARI)
(a) Government in the Ministry of Road Transport & Highways reviews the progress of all
National Highway (NH) development projects in the country on regular basis on key highway
corridors including NH-326, NH-59, NH-130CD passing through Malkangiri, Rayagada and
Koraput. The construction of rural roads come under the jurisdiction of the State
Government.
(b) The details of sanctioned works in progress, delays and cost escalations for Odisha’s
southern districts are given in Annexure. Besides these projects, Government on 31.12.2025,
has approved the project proposal for widening & strengthening of NH-326 from km 68.600
to km 311.700 to 2 lane with paved shoulder configuration in the State of Odisha on EPC
mode at a total capital cost Rs.1526.21 crore with the condition to ensure availability of
encumbrance free land for 90% of length before awarding the contract.(c) To fast-track projects and expedite project execution, the Government has undertaken
various initiatives. These include streamlining and expediting land acquisition using
“Bhoomirashi” portal and GIS-based Land Acquisition Plan, revamping “Parivesh” Portal
through Ministry of Environment, Forest and Climate Change, to facilitate faster forest and
environmental clearances, enabling online approval of General Arrangement of Drawings
(GAD) of Road Over Bridge/Road Under Bridge (ROB/RUB) from the Railways, and
leveraging the mechanism of review and resolution of bottlenecks / hindrances in ongoing
projects, in active collaboration with the State Governments and other stakeholders.
Government has also launched a web portal for Railway related clearances with defined
timelines for various approvals. Government has put in place a strong framework using
multiple mechanisms for monitoring project progress and contractor inefficiencies. Regular
review meetings are conducted at various levels with stakeholders to assess project progress,
and critical projects, such as those delayed by more than three years or pending for award /
appointment. The State Governments conduct coordination meetings led by the Chief
Secretary to resolve issues affecting project execution. Projects where issues remain
unresolved are escalated for further review through the Project Monitoring Group and also
through “PRAGATI”.Annexure
ANNEXURE REFERRED IN REPLY OF RAJYA SABHA UNSTARRED QUESTION
NO. 575 FOR 04-02-2026 ASKED BY DR. SASMIT PATRA REGARDING STATUS OF
HIGHWAYS IN SOUTHERN DISTRICTS OF ODISHA
NH works in progress in southern districts of Odisha
Sche Delay a Cost Es
Dat Sanc Ap
Dist duled s on 31. calatio
Sr. e of tione Len poi
ricts Com 01.2026 n (Rs. i
No Name of the Work San d Cogth ( nte
invo pletio (No. of n Cr.)
. ctio st (C km) d D
lved n DatDays) if due to
n r.) ate
e any delay
Widening to two lane with paved should
25- 28-
er of Bhanjanagar to Aska road of NH-1
Gan 05- 03- 27-09
1 57 from km 119/000 to 159/500 (Design 87.77 40.5 857 1.04
jam 202 202-2023
chainage km 117/000 to 157/500) in the
1 2
state of Odisha on EPC mode.
Widening & strengthenlng to 2L+PS fro 31- 05-
m km 0.000 to 40.000 (Dhaugaon- Poda Gan 03- 186.5 02- 04-02No Dela
2 40 0
mari section) of NH 326 in the State of jam 202 2 202-2026 y
Odisha under Annual Plan 2021.22. 2 4
Widening of existing road of Kalinga G
hat in Valley side for elimination of Bla
ck spot using innovative Reinforced Ear 31- 28-
Kan
th Composite/Hybrid system from km 8 03- 0.30 08- 27-08
3 dha 29.69 522 0
6/330 to 86/615 including Reconstructio 202 5 20 -2024
mal
n Minor Bridge at Ch. 86/700 of NH-15 2 23
7 in the State of Odisha under Annual Pl
an 2021-22.
Realignment from km 227/700 to 227/9
70, km 233/260 to 233/980, km 234/090
27- 07-
to 234/860 and km 235/980 to 236/770 Kala
02- 06- 28-11
4 of NH-26 (Missing section of Bhawanip han 28.26 2.48 64 0.12
202 202-2025
atna - Koksara stretch) on EPC mode in di
3 4
the State of Odisha under Annual Plan 2
022-23.
Widening and strengthening to 2L+PS o 22- 16-
f NH-26 from km 367/480 to 376/480 f Kor 03- 03- 15-09
5 44.06 9.00 138 0.7
or the year 2022-23 under NH(O) in the aput 202 202-2025
State of Odisha. 3 4
Construction of Bypass on NH-59 from 31- 30-
Km 336/350 to 349/910 (13.56 km) neaGan 03- 196.913.5 03- 29-03
6 673 8.2
r Berhampur town including 4-lane RoB jam 202 4 6 202-2024
in the state of Odisha. 1 2Construction of four lane bypass to Jeyp 22- 22-
ore town on NH-26 including land acqui Kor 03- 135.1 05- 12-11
7 4.91 445 4.16
sition in the State of Odisha under Annuaput 202 8 202-2024
al Plan 2021-22. 2 3
Construction of Kotpad Bypass to two l 24- 05-
ane with paved shoulder configuration o Kor 03- 14.3 01- 04-07
8 74.48 211 1.49
n NH-63 in the State of Odisha under Aaput 202 1 202-2025
nnual Plan 2021-22. 2 4
Construction of Borigumma Bypass on
20- 26-
NH-26 from km 317.400 to km 320.700
Kor 12- 09- 19-03No Dela
9 (design chainage 317.400 to km 321.41 69.48 4.02 0
aput 202 202-2027 y
5) under NH(O) in Annual Plan 2022-2
2 5
3 for the State of Odisha
Construction of Dharmagarh Bypass on 13- 30-
Kala
NH-130C including land acquisition in t 03- 172.6 04- 21-10No Dela
10 han 7.14 0
he State of Odisha on EPC mode under 202 6 202-2026 y
di
Annual Plan 2022-23 3 5
27- 02-
Construction of Bypass road on NH-26 Nab
03- 168.9 12- 01-12No Dela
11 for Nabarangpur town under Annual Plaaran 9.12 0
202 5 202-2026 y
n 2022-23. gpur
3 4
Construction of 4 HL bridges at Ch. 377
30- 22-
/420, Ch. 423/800, Ch. 433/750 and Ch Mal
03- 05- 21-05
12 . 484/500 on Malkangiri-Motu Road on kan 67.88 4.47 255 1.29
202 202-2025
NH-326 in the State of Odisha under An giri
2 3
nual Plan 2021-22.
Construction of 4 lane ROB with approa
ches in lieu of LC No. RV-172 at km 17 30- 10-
Kala
6.00 of NH-201 (present NH-26) at Kes 12- 324.03.55 05- 08-05
13 han 268 3.85
inga including land acquisition in the sta 202 9 7 202-2025
di
te of Odisha on EPC mode under Annua 1 3
l Plan 2021-22
Construction of new Minor Bridge acro
27- 11-
ss Jeriguda Nallah at km 297/520 (Desi
Kor 02- 03- 10-09
14 gn Ch.) of NH-326 including approache 8.81 0.6 143 0.3
aput 202 202-2025
s in the State of Odisha on EPC mode u
3 4
nder Annual Plan 2022-23.
Construction of new bridge over Sagada 28- 30-
Kala
river at Ch. 192/030 on NH-26 includin 02- 05- 20-11No Dela
15 han 39.07 2.14 0
g approaches in the State of Odisha on 202 202-2026 y
di
EPC mode under Annual Plan 2022-23. 3 5
Construction of new bridge over Ret riv
28- 25-
er at Ch. 149/753 on NH-26 including aKala
02- 04- 16-10No Dela
16 pproaches and LA in the State of Odish han 39.1 1.82 0
202 202-2026 y
a on EPC mode under Annual Plan 202 di
3 5
2-23.
Reconstruction of culverts at km 388/49 14- 09-
5, km 396/407, km 409/710 & km 415/0 Kor 01- 1.401 05- 08-05No Dela
17 0.02 0
61 of NH-26 in the State of Odisha for taput 202 7 202-2026 y
he year 2023-24 4 5Rehabilitation of Railway Over Bridge
18- 30-
at Rayagada from km 202/175 to 202/79 Ray
11- 0.83 07- 29-01
18 0 and Nagavali River bridge from km 1agad 3.45 2 0
202 0 202-2026
92/797 to 193/050 of NH-326 under ite a
4 5
m rate contract in the State of Odisha
06- 06-
Onetime Improvement of Kalasandhapu
Gan 02- 08- 05-02No Dela
19 r town portion on NH-59 from km 303.9 4.88 2.14 0
jam 202 202-2026 y
60 to 306.100 for the year 2024-25
5 5
Development of 6L Greenfield Dhanara
to Hatibena section of NH 130CD Road 11- 25-
Nab
(From km. 124+$61 to km.146+500) un 02- 477.721.8 03- 23-03
20 aran 677 1.91
der Raipur- Visakhapatnam economic c 202 6 4 202-2024
gpur
orridor in the state of Odisha, on Hybrid 1 2
Annuity Mode (Package OD-1)
Development of 6L Greenfield Hatibena
to Badakumari section o'l NH-130CD R 11- 04-
Nab
oad (From km 146+500 to km 179+000 02- 791.132.5 03- 02-03
21 aran 700 0
) under Raipur-Visakhapatnam economi 202 7 0 202-2024
gpur
c corridor in the state of Odisha, on Hyb 1 2
rid Annuity Mode (Package 0D-2)
Development of 6L Greenfield Badaku
mari to Karki section of NH- 130CD Ro 25- 13-
Nab
ad (From km 179+000 to km 226+500) 03- 1101.47.5 04- 11-04
22 aran 660 3.68
under Raipur- Visakhapatnam economic 202 76 0 202-2024
gpur
corridor in the state of Odisha, on Hybri 1 2
d Annuity Mode (Package OD-3)
Development of 6L Greenfield Badaku
mari to Karki section of NH- 130CD Ro 03- 30-
ad (From km 179+000 to km 226+500) Kor 09- 1577. 05- 29-05
23 44 612 5.37
under Raipur- Visakhapatnam economic aput 202 56 202-2024
corridor in the state of Odisha, on Hybri 1 2
d Annuity Mode (Package OD-3)
Development of 6L Greenfield Baunsag
ura to Baraja section of NH-130CD Roa 22- 01-
d from Km.293+000 to Km.338+500 u Kor 09- 1294.45.5 06- 31-05
24 610 2.70
nder Raipur-Visakhapatna m economic aput 202 77 0 202-2024
corridor in the state of Odisha, on Hybri 1 2
d Annuity Mode (Package 0D-6)
Development of 6L Greenfield Kandili t
o Tumbigura section of NH-130CD Roa 20- 17-
d from Km. 342+500 to Km. 365+033 Kor 12- 1492.22.5 10- 16-10
25 472 0
under Raipur-Visakhapatnam economic aput 202 74 3 202-2024
corridor in the state of Odisha, on Hybri 1 2
d Annuity Mode (Package OD-8)
*****