6178. DR. AMAR SINGH:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Government is aware that the delay in opening of Kangra
Ghati railway line and the Chakki bridge section has been causing
inconvenience to residents and pilgrims particularly those travelling
from Punjab to visit Mata Chintpurni and other prominent temples in the
region;
(b) if so, the details of the reasons for the delay in operationalising the said
railway section;
(c) the details of the current status of construction/restoration work on the
Chakki bridge and the Kangra Ghati railway line;
(d) the timeline by which the Government proposes to make the railway
section fully operational for public use; and
(e) the details of the existing and proposed train services including the
timetable of trains operating on the Kangra Ghati (Pathankot–Joginder
Nagar) railway line?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (e) Due to unprecedented rains and consequent washing away of
piers of Chakki Khad Bridge No. 32 between Dalhousie Road and Nurpur
Road stations on 20.08.2022, train services were discontinued between
Pathankot to Nurpur Road. Reconstruction of Bridge No. 32 has been
completed and track is fit for train operation from Pathankot to Joginder
Nagar. Other long-term strengthening works are in progress.
§ Page 1 of 2At present, the following 03 pairs of train services are being operated on
the Kangra Valley Railway line:
SN Train no. and name
1 52472/52473 Bajinath Paprola - Joginder Nagar Passenger
2 52465/52466 Bajinath Paprola - Kangra Passenger
3 52475/52476 Bajinath Paprola - Kangra Passenger
Besides, introduction of new train services on any route/section, are on-
going processes on Indian Railways and depend on various factors which
include:
Capacity of that section
Availability of path
Availability of required rolling stock
Availability of matching infrastructure for rolling stock
Maintenance requirement of railway tracks and other assets
*****