GOVERNMENT OF INDIA
MINISTRY OF JAL SHAKTI
DEPARTMENT OF WATER RESOURCES, RIVER DEVELOPMENT & GANGA REJUVENATION
RAJYA SABHA
UNSTARRED QUESTION NO. 3437
ANSWERED ON 23.03.2026
STATUS OF NAMAMI GANGE PROGRAMME
3437. SHRI SANJAY YADAV:
Will the Minister of Jal Shakti be pleased to state:
(a) total amount spent till date since the inception of Namami Gange Programme (NGP) and manner in
which it has been utilized across key components like sewage treatment plants;
(b) percentage of the overall targets NGP achieved so far in areas like pollution abatement, biodiversity
conservation and sewage infrastructure, major milestones met during the last five years;
(c) whether river Ganga continues to be listed among world's most polluted rivers, with dysfunctional
STPs, untreated sewage and high fecal coliform levels in stretches, reason project failed to fully meet its
objectives of making Ganga clean and rejuvenated; and
(d) current FCC levels compared to 2014 at points like Haridwar, Varanasi and Patna?
ANSWER
THE MINISTER OF STATE FOR JAL SHAKTI
(SHRI RAJ BHUSHAN CHOUDHARY)
(a) Since inception of the Namami Gange Programme (June, 2014 to 15th March, 2026), the National
Mission for Clean Ganga has disbursed ₹ 21,340 crores to various implementing/executing agencies, of
which ₹ 16025.97 crore are for the sewage treatment projects.
(b) The Government of India (GoI) implemented the Namami Gange Programme (NGP) Phase-I for the
rejuvenation of river Ganga and its tributaries, up to March, 2021. Subsequently, Phase-II was sanctioned
for the period till March, 2026.
Under Namami Gange Programme, a total of 524 projects have been sanctioned, out of which 355
projects (68%) have been completed as on February, 2026. In the last five years, a total of 208 projects
have been completed. The major achievements during the last five years are as follows:
i. A total of 76 sewerage infrastructure projects with a combined treatment capacity of 3200
MLD have been completed in last 5 years.
ii. In addition, 71 new projects are sanctioned at an estimated cost of ₹12,641 crores, aimed at
creating an additional treatment capacity of 2,210 MLD.
iii. For industrial pollution abatement, two projects, Mathura CETP (6.25 MLD) and Jajmau
CETP (20 MLD), have been completed;
1iv. Biodiversity Conservation: Seven Biodiversity Parks in seven districts (Mirzapur,
Bulandshahar, Hapur, Budaun, Ayodhya, Bijnore and Pratapgarh) of Uttar Pradesh and 5
priority wetlands in Uttar Pradesh (3), Bihar (1) and Jharkhand (1) have been sanctioned;
v. NMCG, through the State Forest Department, has implemented a forestry intervention
project along the main stem of river Ganga. 33,024 hectares area have been afforested with
an expenditure of about ₹ 414 crores;
vi. A total of 203 lakhs of Indian Major Carp (IMC) fingerlings have been ranched in the
Ganga to conserve fish biodiversity and prey base for river Dolphins, and ensure the
livelihood of fishers in the Ganga basin under the special project implemented by Central
Inland Fisheries Research Institute (CIFRI);
vii. Science-based species restoration programme, rescue, and rehabilitation programme for
aquatic species like Dolphins, Otters, Hilsa, Turtles, and Ghariyal in collaboration with
Wild Life Institute of India (WII), Dehradun and State Forest Department, have shown
marked improvements in biodiversity with increased sightings of Dolphins, Otters, Hilsa,
Turtles, and other riverine species;
viii. Gangetic Dolphin Conservation: Gangetic dolphin surveys covered 8507 km across 28
rivers. Nationwide Population Status of Ganges dolphin – 6324.
ix. India’s first Dolphin Rescue Ambulance was developed and inaugurated on 13th January,
2026 by the Hon’ble Minister at Wildlife Institute of India, Dehradun, enabling safe rescue
and translocation; 8 Gangetic dolphins were rescued and released.
x. A citizen-led Soons-Saathi network (100 volunteers across 250 km), 160 trained personnel,
2,000 sensitised community members, and 15 Dolphin Clubs strengthened early reporting
and conservation outreach.
xi. Gharial Conservation: Gharial assessments across 22 rivers recorded 3,037 individuals,
with habitat models indicating only 5.6% highly suitable habitat, underscoring the need for
flow regulation and habitat protection.
xii. Threatened turtle species including 15 (10 radio tagged) captive hatched Chitra indica, 60
Hardellathurjii (10 radio tagged) and 20 Batagurkachuga (all radio tagged) re-wilded in
Yamuna, Sarju and Ganga rivers, respectively with robust monitoring protocol. Dispersal
and survival maps ready.
xiii. Total 387 vulnerable nest (8257 eggs) of endangered Batagur turtle species were protected
in Chambal through two riverside hatcheries. This ensured safe return of 7979 hatchlings
back into the river, marking an overall hatching success of 96.7%.
xiv. Technology-driven conservation was advanced through the institutionalization of SMART-
based riverine patrolling across 210 km of the Chambal River in Uttar Pradesh.
(c) & (d) Central Pollution Control Board (CPCB), carries out manual water quality monitoring of the
river Ganga at 112 locations across five Ganga main-stem States- Uttarakhand-19; Uttar Pradesh-41;
Bihar-33; Jharkhand-04; and West Bengal-15. As per CPCB report on Polluted River Stretch (PRS)
2025, the following information about Ganga main stem pollution is available:
2Ganga Main Stem – State-wise Comparison (2018 vs 2025)
State 2018 Polluted Priority 2025 Polluted Priority Trend/Observation
Stretch (2018) Stretch (2025)
Uttarakhand Haridwar → IV No PRS — Improved and PRS
Sultanpur stretch removed
Uttar Pradesh Kannauj → IV Bijnor → IV / V Partially improved
Varanasi Tarighat
Bihar Buxar to V Bhagalpur D/S→ V Marginal pollution
Bhagalpur Khalgaon D/S remains
Jharkhand No PRS — No PRS — —
West Bengal Triveni → III Baharampore → V improved
Diamond Harbour Diamond
Harbour
Based on the water quality data (median values) of the river Ganga for the year 2025 (January to
August), the following observations are made:
i. pH & Dissolved Oxygen (DO) are the most critical parameters of river health. The pH &
DO of River Ganga meet the required norms for bathing criteria at all the locations of River
Ganga.
ii. Water quality of river Ganga is conforming with the bathing criteria w.r.t. Bio- chemical
Oxygen Demand (BOD) in the entire stretch of river Ganga in Uttarakhand, Jharkhand,
Bihar & West Bengal, except the following locations/stretches:
Farrukhabad to Purana Rajapur, Kanpur.
Dalmau, Raebareli.
D/s Mirzapur to Tarighat, Ghazipur (except two locations namely U/s Varanasi, After
confluence Gomti & U/s Ghazipur) in Uttar Pradesh.
iii. As per CPCB report, Faecal Coliform (median) primary water quality criteria for bathing is
met in the entire stretch of river Ganga in Uttarakhand & Jharkhand and certain stretches of
UP, Bihar and West Bengal while Faecal Streptococoi (median) the primary water quality
criteria for bathing is met in the entire stretch of river Ganga in Uttarakhand, Bihar &
Jharkhand and certain stretches of UP and West Bengal. Faecal coliform (FC) values at
Harki Pauri Ghat is 135 MPN/100mL) and d/s Haridwar is 140 MPN/100mL in 2025.
Value(median) of FC observed at Assighat, Varanasi is 2500 MPN/100mL in 2014 and 790
MPN/100mL in 2025. Value(median) of FC at NIT Gandhi ghat, Patna is 5400
MPN/100mL in 2014 and 2200 MPN/100mL in 2025 and Patna d/s Ganga Bridge is 3000
MPN/100mL in 2014 and 1950 MPN/100mL in 2025.
As per the biomonitoring conducted during 2024-25 at 50 locations along river Ganga and its
tributaries and 26 locations along River Yamuna and its tributaries, the biological water quality (BWQ)
predominantly ranged from ‘Good’ to ‘Moderate’. The presence of diverse benthic macro-invertebrate
species indicates the ecological potential of the rivers to sustain aquatic life.
*****
3