Home India RAILWAYS Parliament Question: Stoppage of Vande Bharat train 26462/26...
Date: 2025-12-17 Category: Not Applicable State: Union Government Country: India

Parliament Question: Stoppage of Vande Bharat train 26462/26461 at Barnala in Punjab

Issued by RAILWAYS · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** The document is a response to an unstarred question in Lok Sabha regarding the stoppage of the Vande Bharat train (26462/26461) at Barnala in Punjab, scheduled to be answered on December 17, 2025. It outlines the criteria for determining train stoppages, addresses Barnala's exclusion, and details the handling of requests for train halts. The response acknowledges the receipt of requests and highlights considerations for new stoppages, such as traffic justification, operational feasibility, and infrastructure. **Key Points / Main Content** * **Existing Train Services:** Barnala is served by 12 pairs of trains, including one pair connecting it to Firozpur and four pairs connecting it to the Delhi area. A list of all trains serving Barnala is provided. * **Criteria for Train Stoppages:** Railways consider the following criteria to determine stoppages of premium trains like Vande Bharat: * Projected ridership * Infrastructure capacity * Timetable constraints * **Barnala Halt Evaluation:** Barnala was evaluated for a halt on Vande Bharat 26462/26461 (Firozpur Cantt.–New Delhi), but it was excluded. The specific reasons for this exclusion are not provided. * **Handling of Requests for Stoppages:** The Railways receive formal and informal requests for train stoppages from various sources, including: * State Governments * Ministries of Central Government * Elected Representatives * Consultative Committees These requests are handled as per laid-down procedures/guidelines, and action is taken if found feasible and justified. * **Considerations for New Stoppages:** The provision of new train stoppages depends on the following factors: * Traffic justification * Operational feasibility, including extra time on the section * Availability of matching infrastructure, such as platform length **Impact Analysis** **Stakeholder: Shri Gurmeet Singh Meet Hayer (MP)** * **Impact:** Receives information on the criteria adopted by Railways for determining stoppages of premium trains, whether the Barnala station was evaluated for a halt on the Vande Bharat train, and related matters. * **Action Required:** Review the information and potentially follow up on the justifications provided. **Stakeholder: Residents/Commuters of Barnala** * **Impact:** The document addresses the potential for Vande Bharat train stoppages at Barnala and clarifies factors influencing such decisions. * **Action Required:** Continue to voice the demand for a halt, providing data and support for its traffic justification and operational feasibility. **Stakeholder: Ministry of Railways** * **Impact:** This document is an official response to a query regarding train services. * **Action Required:** Continue to evaluate requests for train stoppages and address infrastructural limitations.

Key Entities Referenced

Vande Bharat Train: A premium train service, criteria for stoppages are being discussed. Ministry of Railways: The ministry responsible for determining train stoppages and answering questions in Lok Sabha. Barnala, Punjab: The location where the stoppage of Vande Bharat train is requested.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO. 2983 TO BE ANSWERED ON 17.12.2025 STOPPAGE OF VANDE BHARAT TRAIN 26462/26461 AT BARNALA IN PUNJAB 2983. SHRI GURMEET SINGH MEET HAYER: Will the Minister of RAILWAYS be pleased to state: (a) the details of the criteria adopted by Railways for determining stoppages of premium trains such as Vande Bharat including factors like projected ridership, infrastructure capacity and timetable constraints; (b) whether Barnala station was evaluated for a halt on Vande Bharat 26462/26461 (Firozpur Cantt.–New Delhi) and if so, the reasons for excluding the said station; (c) whether consultations were held with local MPs, MLAs, district authorities or other stakeholders before finalising the stoppages and if so, the details thereof; (d) whether the Government has received any formal request seeking a Barnala halt and if so, the details thereof including the replies given by the Railways; (e) whether any infrastructural limitations at Barnala have influenced the decision and whether upgrades are proposed and if so, the details thereof; and (f) the details of the procedure and expected timeline for approving the additional halt on this train in view of public demand? ANSWER MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND ELECTRONICS & INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW) (a) to (f) Barnala is presently being served by 12 pairs of trains( listed below) which includes 1 pair of train services connecting it to Firozpur and 4 pairs of trains connecting it to Delhi area. SN Train no. & Name 1 14887/14888 Rishikesh-Barmer Express ……. 2/--2- 2 14625/14626 Haridwar-Firozpur Cantt Express 3 12455/12456 Delhi Sarai Rohilla-Bikaner Express 4 14507/14508 Delhi-Fazilka Express 5 14509/14510 Dhuri-Bhatinda Express 6 14525/14526 Ambala Cantt-Sri Ganganagar Express 7 14815/14816 Sri Ganganagar- Rishikesh Express 8 14735/14736 Sri Ganganagar- Ambala Cantt Express 9 12485/12486 Hazur Sahib Nanded-Shri Ganganagar Express 10 12439/12440 Hazur Sahib Nanded-Shri Ganganagar Express 11 54765/54766 Dhuri-bhatinda Passenger 12 54551/54552 Ambala Cantt-Bhatinda Passenger Representations/requests, both formal and informal, inter alia for provision of stoppage of train services, are received from State Governments, Ministries of Central Government, Elected Representatives, Consultative Committees etc. by the Railways at various levels including Railway Board, Zonal Railways, Divisional office etc. As receipt of such representations/requests is a continuous and dynamic process, centralized compendium of such representations/requests is not maintained. However, these are dealt as per laid down procedure/guidelines and action as found feasible and justified is taken from time to time, which is an on-going process. Besides, provision of stoppages of train services depends on the traffic justification, operational feasibility including availability of extra time on the section & availability of matching infrastructure such as Platform length etc. *****

Continue your research