See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF JAL SHAKTI
DEPARTMENT OF WATER RESOURCES, RIVER DEVELOPMENT & GANGA REJUVENATION
LOK SABHA
UNSTARRED QUESTION NO. 883
ANSWERED ON 23.07.2026
SURVEY ON GLACIAL LAKE OUTBURST FLOODS
883. Dr. THIRUMAAVALAVAN THOLKAPPIYAN:
Will the Minister of JAL SHAKTI be pleased to state:
(a) whether the Government has conducted any survey regarding Glacial Lake Outburst Floods (GLOFs)
during the last three years and if so, the details thereof; and
(b) whether any early warning system has been installed to provide advance information regarding floods
based on the findings of such GLOFs survey and if so, the details thereof along with the cost involved in this
regard?
ANSWER
THE MINISTER OF STATE FOR JAL SHAKTI
(SHRI RAJ BHUSHAN CHOUDHARY)
(a) Yes. The Government of India has undertaken surveys and scientific assessments to identify and evaluate
the risks associated with Glacial Lake Outburst Floods (GLOFs) in the Indian Himalayan Region.
Central Water Commission (CWC) has identified several potentially dangerous glacial lakes for
priority monitoring and currently monitors 2,485 glacial lakes having an area greater than 10 hectares across
the Himalayan river basins, covering four States and two Union Territories, during the period June to October
every year using remote sensing techniques.
Subsequently, the National Disaster Management Authority (NDMA), in collaboration with national
scientific agencies, carried out scientific assessment of 189 high-risk glacial lakes across the Indian
Himalayan Region during 2025. Based on the assessment, 56 glacial lakes were classified as very high risk
considering their potential to trigger GLOFs and the exposure of downstream habitations and infrastructure.
(b) Based on the findings of the GLOF hazard assessments and glacial lake monitoring, the Government has
initiated the establishment of GLOF Early Warning Systems (EWS) at selected high-risk glacial lakes in the
Indian Himalayan Region.
Further, NDMA is implementing the National GLOF Risk Mitigation Programme (NGRMP), which
was approved in 2024, for implementation in the States of Himachal Pradesh, Uttarakhand, Sikkim and
Arunachal Pradesh at a total approved cost of Rs. 150 crore. The programme envisages Hazard and Risk
Assessment, Monitoring and Early Warning Systems, site-specific structural and non-structural mitigation
measures, and community awareness and capacity building.
However, at present, no end-to-end GLOF Early Warning System has been commissioned under the
National GLOF Risk Mitigation Programme.
In addition, NDMA, in collaboration with the Swiss Agency for Development and Cooperation (SDC) and the
Sikkim State Disaster Management Authority (SSDMA), conducted multi-agency expeditions to the high-risk
South Lhonak and Shako Cho glacial lakes in Sikkim during 2023 and 2024 to facilitate scientific
investigations and the development of appropriate monitoring, early warning mechanisms and mitigation
measures.
An amount of Rs. 52.50 crore has been earmarked under the Monitoring and Early Warning System
component of the NGRMP, out of the total programme outlay of Rs. 150 crore.
*****