**Executive Summary**
This document is a response from the Minister of Railways to questions raised in Lok Sabha regarding the implementation of the Swadeshi Kavach Protection System, railway safety measures, fire safety policies in passenger coaches, and the elimination of unmanned level crossings. The report details various initiatives undertaken by Indian Railways to enhance safety and reduce accidents, including technological upgrades, maintenance practices, and infrastructure improvements. Key initiatives include the implementation of the Kavach system and the elimination of unmanned level crossings.
**Key Points / Main Content**
*Safety Performance and Expenditure*
* Safety is a top priority for Indian Railways, leading to a decline in accidents.
* The number of consequential train accidents has decreased from 135 in 2014-15 to 12 in 2025-26 (up to date).
* Consequential Accident Index has improved from 0.11 in 2014-15 to 0.03 in 2024-25.
* Expenditure on safety-related activities has increased, reaching Rs. 1,17,693 Cr in 2025-26.
*Technological and Infrastructure Upgrades*
* Electrical/Electronic Interlocking Systems have been provided at 6,660 stations up to 31.12.2025.
* Interlocking of Level Crossing (LC) Gates has been provided at 10,097 Level Crossing Gates up to 31.12.2025.
* Modern track structure is being used, including 60kg/90 UTS rails and Prestressed Concrete Sleepers.
* GPS-based Fog Safety Devices (FSD) are provided to loco pilots in fog-affected areas.
* Web-based online monitoring system for track assets has been adopted.
*Kavach Implementation*
* Kavach is an indigenously developed Automatic Train Protection (ATP) system.
* Kavach version 4.0 was approved by RDSO on 16.07.2024 and commissioned on 1297 Route Kilometres on Delhi-Mumbai and Delhi-Howrah routes.
* Kavach installation includes station Kavach, RFID tags, telecom towers, optical fibre cables, and loco Kavach.
* A tender has been finalized for equipping 6,300 Electric Locomotives with Kavach 4.0 and another for 2,679 Diesel Locomotives.
* The total funds utilized on Kavach works are Rs. 2,573.36 Crores with an allocation of Rs. 1673.19 Crores for the year 2025-26.
*Fire Safety Measures*
* New policies mandate fire-retardant materials and advanced fire safety systems in new passenger coaches.
* Measures include fire extinguishers, fire detection & suppression systems, and fire-retardant materials.
* "Fire Notices" are displayed for passenger information.
*Level Crossings*
* All unmanned level crossings (UMLCs) on Broad Gauge (BG) have been eliminated by January 2019.
* 13,808 Flyovers (RoBs)/Underpasses (RUBs) were constructed from 2014 to Dec 2025.
*Predictive Maintenance*
* Using predictive maintenance and sensor-based monitoring.
* The Oscilliograph Monitoring System (OMS) and Track Recording Car (TRC) are used to identify defects.
* A Memorandum of Understanding has been signed between IR and Dedicated Freight Corridor Corporation of India Limited (DFCCIL) in July 2025 for induction of wayside Machine Vision based Inspection System (MVIS).
* Indian Railways has adopted ‘Phased Array Ultrasonic Testing' technology for flaw Detection in flash butt weld.
**Impact Analysis**
**Stakeholder**: Passengers
**Impact**: Enhanced safety and reduced risk of accidents due to Kavach, infrastructure upgrades, and fire safety measures.
**Action Required**: Be aware of fire safety guidelines displayed in coaches.
**Stakeholder**: Loco Pilots and Train Crew
**Impact**: Improved safety through Kavach and Fog Safety Devices, requiring them to adapt to new technologies and safety protocols.
**Action Required**: Participate in training programs for Kavach and adhere to new safety guidelines.
**Stakeholder**: Indian Railways Staff and Management
**Impact**: Requires implementation and maintenance of new safety systems, infrastructure, and adherence to updated safety protocols.
**Action Required**: Implement Kavach, conduct regular inspections, and training of staff.
**Stakeholder**: States
**Impact**: Coordination with States to accelerate the removal of level crossings.
**Action Required**: Coordinate with Indian Railways for the removal of level crossings.
Key Entities Referenced
Swadeshi Kavach Protection System: An indigenously developed Automatic Train Protection (ATP) system designed to enhance railway safety by preventing collisions and controlling train speeds.
Ministry of Railways: The Indian government ministry responsible for the operation and maintenance of the country's railway system.
Rajasthan: Indian state mentioned in the context of unmanned level crossings.
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 807
TO BE ANSWERED ON 04.02.2026
SWADESHI KAVACH PROTECTION SYSTEM
†807. SHRI BRIJENDRA SINGH OLA:
Will the Minister of RAILWAYS be pleased to state:
(a) the reasons for failure to ensure full implementation of Swadeshi
Kavach Protection System on the main railway network despite
increasing number of accidents;
(b) whether the Kavach system is not foolproof from the safety
perspectives and if so, the details thereof;
(c) the extent to which the Government is using predictive
maintenance, sensor-based monitoring and fault detection
technologies on real time basis to reduce accidents caused by
signal failures and track-related defects and the results thereof;
(d) whether any new policy has been implemented to make fire-
retardant materials and advanced fire safety systems mandatory in
all new passenger coaches and if so, the details of the plans and
timeline for the upgradation of old coaches;
(e) the details of unmanned (without security staff) level crossing
gates on densely populated roads including Jhunjhunu district in
Rajasthan, district-wise; and
(f) the details of the dedicated funds, construction timeline and
arrangements for coordination with States to accelerate the
process of removing these level crossings?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) & (b): Safety is accorded the highest priority on Indian Railways. As a
consequence of various safety measures taken over the years, there has
been a steep decline in the number of accidents.
--2/--2-
Number of Consequential Train Accidents has reduced as shown in the
table below:-
Year Consequential Accidents
2014-15 135
2025-26 (Till date) 12 (90% lesser)
Another important index showing improvement in safety in train
operations is Consequential Accidents Index, the details of which are
as under:-
Consequential Accident Index:-
Year Accident Index
2014-15 0.11
2024-25 0.03 (73% lesser)
This index measures number of consequential accidents as a ratio of
total running Kilometers of all trains.
Accident Index =
234
165
135
55
31
12
2005-06 2009-10 2014-15 2019-20 2024-25 2025-26
(upto Jan)
--3/-
stnediccA
niarT
laitneuqesnoC
fo
.oN
No. of consequential accidents
No. of trains X million kilometers run-3-
The various safety measures taken to enhance safety in train
operations are as follows:-
1. On Indian Railways, the expenditure on Safety related activities
has increased over the years as under:-
Expenditure/Budget on Safety related activities (Rs. in Cr.)
2013-14 2022-23 2023-24 2024-25 2025-26
39,200 87,336 1,01,662 1,14,022 1,17,693
2. Electrical/Electronic Interlocking Systems with centralized
operation of points and signals have been provided at 6,660
stations up to 31.12.2025 to reduce accidents due to human failure.
3. Interlocking of Level Crossing (LC) Gates has been provided at
10,097 Level Crossing Gates up to 31.12.2025 for enhancing safety
at LC Gates.
4. Complete Track Circuiting of stations to enhance safety by
verification of track occupancy by electrical means has been
provided at 6,665 stations up to 31.12.2025.
5. Detailed instructions on issues related with safety of Signalling, e.g.
mandatory correspondence check, alteration work protocol,
preparation of completion drawing, etc. have been issued.
6. System of disconnection and reconnection for S&T equipment as
per protocol has been re-emphasized.
7. All locomotives are equipped with Vigilance Control Devices (VCD)
to improve alertness of Loco Pilots.
8. Retro-reflective sigma boards are provided on the mast which is
located two OHE masts prior to the signals in electrified territories
to alert the crew about the signal ahead when visibility is low due
to foggy weather.
--4/--4-
9. A GPS based Fog Safety Device (FSD) is provided to loco pilots in
fog affected areas which enables loco pilots to know the distance
of the approaching landmarks like signals, level crossing gates, etc.
10. Modern track structure consisting of 60kg, 90 Ultimate Tensile
Strength (UTS) rails, Prestressed Concrete Sleeper (PSC)
Normal/Wide base sleepers with elastic fastening, fan shaped layout
turnout on PSC sleepers, Steel Channel/H-beam Sleepers on girder
bridges is used while carrying out primary track renewals.
11. Mechanisation of track laying activity through use of track
machines like PQRS, TRT, T-28 etc. to reduce human errors.
12. Maximizing supply of 130m/260m long rail panels for increasing
progress of rail renewal and avoiding welding of joints, thereby
improving safety.
13. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws
and timely removal of defective rails.
14. Laying of longer rails, minimizing the use of Alumino Thermic
Welding and adoption of better welding technology for rails i.e.,
Flash Butt Welding.
15. Monitoring of track geometry by OMS (Oscillation Monitoring
System) and TRC (Track Recording Cars).
16. Patrolling of railway tracks to look out for weld/rail fractures.
17. The use of Thick Web Switches and Weldable CMS Crossing in
turnout renewal works.
18. Inspections at regular intervals are carried out to monitor and
educate staff for observance of safe practices.
19. Web based online monitoring system of track assets viz. Track
database and decision support system has been adopted to decide
rationalized maintenance requirement and optimize inputs.
20. Detailed instructions on issues related with safety of Track, e.g.
--5/--5-
integrated block, corridor block, worksite safety, monsoon
precautions, etc. have been issued.
21. Preventive maintenance of railway assets (Coaches & Wagons) is
undertaken to ensure safe train operations.
22. Replacement of conventional ICF design coaches with LHB design
coaches is being done.
23. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route
have been eliminated by January 2019.
24. Safety of Railway Bridges is ensured through regular inspection of
Bridges. The requirement of repair/rehabilitation of Bridges is taken
up based upon the conditions assessed during these inspections.
25. Indian Railways has displayed Statutory “Fire Notices” for
widespread passenger information in all coaches. Fire posters are
provided in every coach so as to educate and alert passengers
regarding various Do’s and Don’ts to prevent fire. These include
messages regarding not carrying any inflammable material,
explosives, prohibition of smoking inside the coaches, penalties
etc.
26. Production Units are providing Fire detection and suppression
system in newly manufactured Power Cars and Pantry Cars, Fire
and Smoke detection system in newly manufactured coaches.
Progressive fitment of the same in existing coaches is also
underway by Zonal Railways in a phased manner.
27. Regular counseling and training of staff is undertaken.
28. Concept of Rolling Block introduced in Indian Railways (Open Lines)
General Rules vide Gazette notification dated 30.11.2023, wherein
work of integrated maintenance/ repair/replacement of assets is
planned up to 52 weeks in advance on rolling basis and executed as
per plan.
--6/--6-
The details of the Safety related works related to better
maintenance practices, Technological improvements, better
infrastructure and rolling stock etc. undertaken by Railways are
tabulated below:-
2004-05 to 2014-15 to 2014-25 Vs.
S.N. Item
2013-14 2024-25 2004-14
Technological Improvements
1. Use of high-quality 57,450 Km 1.43 Lakh Km More than 2
rails (60 Kg) (Km) times
2. Longer Rail Panels 9,917 Km 77,522 Km Nearly 8
(260m) (Km) times
3. Electronic 837 3,691 Stations More than 4
Interlocking (Stations) Stations times
4. Fog Pass Safety As on As on 288 times
Devices (Nos.) 31.03.14: 31.03.25:
90 Nos. 25,939 Nos.
5. Thick Web Switches Nil 28,301 Nos.
(Nos.)
Better Maintenance Practices
1. Primary Rail 32,260 Km 49,941 Km 1.5 times
Renewal (Track Km)
2. USFD (Ultra Sonic 79.43 Lakh 2 Crore More than 2
Flaw detection) times
Testing of Welds
(Nos.)
3. Weld failures (Nos.) In 2013-24: In 2024-25: 90 %
3699 Nos. 370 Nos. reduction
4. Rail fractures (Nos.) In 2013-14: In 2024-25: More than
2548 Nos. 289 Nos. 88%
reduction
Better Infrastructure and Rolling Stock
1. New Track KM 14,985 Km 34,428 Km More than 2
added (Track Km) times
2. Flyovers 4,148 Nos. 13,808 Nos. More than 3
(RoBs)/Underpasses times
(RUBs) (Nos.)
3. Unmanned Level As on As on Removed
crossings 31.03.14: 31.03.24:Nil
(Nos.) on BG 8,948 (All eliminated
by 31.01.19)
--7/--7-
4. Manufacture of LHB 2,337 Nos. 42,677 More than
Coaches (Nos.) 18 times
Implementation of Kavach:
i. Kavach is an indigenously developed Automatic Train Protection
(ATP) system. Kavach is a highly technology intensive system,
which requires safety certification of highest order (SIL-4).
ii. Kavach aids the Loco Pilot in running of trains within specified
speed limits by automatic application of brakes in case Loco Pilot
fails to do so and also helps the trains to run safely during
inclement weather.
iii. The first field trials on the passenger trains were started in
February 2016. Based on the experience gained and Independent
Safety Assessment of the system by Independent Safety Assessor
(ISA), three firms were approved in 2018-19, for supply of Kavach
Ver 3.2.
iv. Kavach was adopted as National ATP system in July, 2020.
v. Implementation of Kavach System involves following Key
Activities:
a. Installation of Station Kavach at each and every station, block
section.
b. Installation of RFID Tags throughout the track length.
c. Installation of telecom Towers throughout the section.
d. Laying of Optical Fibre Cable along the track.
e. Provision of Loco Kavach on each and every Locomotive running
on Indian Railways.
vi. Based on deployment of Kavach version 3.2 on 1465 RKm on South
Central Railway and experience gained, further improvements were
--8/--8-
made. Finally, Kavach specification version 4.0 was approved by
RDSO on 16.07.2024.
vii. Kavach version 4.0 covers all the major features required for the
diverse railway network. This is a significant milestone in safety for
Indian Railways. Within a short period, IR has developed, tested
and started deploying Automatic Train Protection System.
viii. Major improvement in Version 4.0 includes increased Location
Accuracy, Improved Information of Signal Aspects in bigger yards,
Station to Station Kavach interface on OFC and Direct Interface to
existing Electronic Interlocking System. With these improvements,
Kavach Ver.4.0. is planned for large scale deployment over Indian
Railways.
ix. After extensive and elaborate trials, Kavach Version 4.0 has been
successfully commissioned on 1297 Route Kilometres, covering the
high density Delhi - Mumbai and Delhi – Howrah routes. On the Delhi
– Mumbai route Kavach ver 4.0 has been commissioned on Junction
cabin – Palwal – Mathura – Nagda section (667 Rkm) & Ahmedabad –
Vadodara – Virar section (432 Rkm) and on the Delhi – Howrah
route on Gaya – Saramatanr (93 Rkm) and Bardhaman - Howrah
section (105 Rkm).
x. Further, track side Kavach implementation work has been taken up
on 23,360 RKM covering all GQ,GD,HDN and identified sections of
Indian Railways.
xi. Progress of key items of Kavach on High density routes including
Delhi– Mumbai & Delhi– Howrah corridors are as under:
--9/--9-
SN Item Progress
i Laying of Optical Fibre Cable 8570 Km
ii Installation of Telecom Towers 938 nos
iii Station Data Centre 767 station
iv Installation of Track side equipment 5672 RKm
v Provision of Kavach in Loco 4154
xii. Tender has been finalised for equipping 6,300 Electric Locomotives
with Kavach version 4.0 and another tender for equipping 2,679
Diesel Locomotives is under finalisation.
xiii. Specialized training programmes on Kavach are being conducted at
centralized training institutes of Indian Railways to impart training
to all concerned officials. By now more than 48,000 technicians,
operators and engineers have been trained on Kavach technology.
This includes about 45,000 Loco Pilots & Assistant Loco Pilots.
Courses have been designed in collaboration with IRISET.
xiv. The cost for provision of Track Side including Station equipment of
Kavach is approximately Rs. 50 Lakhs/Km and cost for provision of
Kavach equipment on locomotives is approximately Rs. 80
Lakh/Loco.
xv. The funds utilized on Kavach works so far up to Dec'25 is Rs.
2,573.36 Crores. The allocation of funds during the year 2025-26 is
Rs. 1673.19 Crores. Requisite funds are made available as per the
progress of works.
(c): Technological improvements in Indian Railways (IR) are a continuous
process. Some of the Artificial Intelligence based predictive
maintenance applications are as follows:
--10/--10-
i. Pilot initiatives involving Artificial Intelligence/Machine Learning
(AI/ML) driven predictive maintenance of Signalling system is
being undertaken over Indian Railways. At some of the stations it
has been used to evaluate efficacy of maintenance. Measurable
outcome includes limited Prediction Logics and Alerts
mechanism.
ii. Oscillograph Monitoring System (OMS) and Track Recording Car
(TRC) are used to identify defects, predict maintenance
requirement and analyze health of track. For detection of internal
defects in rail and welds, Ultrasonic Flaw Detection (USFD)
testing is carried out regularly at prescribed frequency. Indian
Railways has adopted ‘Phased Array Ultrasonic Testing’
technology for flaw Detection in flash butt weld, which is an
advance technology.
iii. 1) IR has adopted advanced/improved technologies like Online
Monitoring of Rolling Stock System (OMRS), Wheel Impact
Load Detector (WILD) for predictive maintenance of Rolling
stock.
2) A Memorandum of Understand has been signed between IR and
Dedicated Freight Corridor Corporation of India Limited
(DFCCIL) in July 2025 for induction of wayside Machine Vision
based Inspection System (MVIS). This is an AI/ML driven
system for detecting hanging parts or missing components in
moving trains.
3) A Memorandum of Understanding has been signed between IR
and Delhi Metro Rail Corporation to induct Automatic Wheel
Profile Measurement System (AWPMS). The AWPMS allows for
automatic non-contact measurement of train wheel profile
ensuring real-time measurement of wheel geometry and wear.
--11/--11-
(d): The inherent design of rolling stock is done keeping in mind
various safety provisions. Further modification and up-gradation of
coaches to enhance fire safety is a continuous and ongoing
process on Indian Railways (IR). Following measures have been
taken for safety including fire safety in coaches:
i. Provision of Minimum two Fire Extinguishers in all coaches
over Indian Railways.
ii. Fire Detection & Suppression System has been provided in fire
prone areas of Power cars and Pantry cars.
iii. Fire and smoke Detection system has been provided in
coaches as per extant guidelines.
iv. Water mist type fire suppression system is being provided on
pantry cars and power cars in phased manner.
v. Provision of emergency windows in coaches for evacuation in
case of fire.
vi. Use of Fire-retardant material as per global fire-retardant
norms in coaches for seats/berths, panels, flooring, insulation,
toilets etc for improved fire safety.
vii. Use of fire retardant E-beam cable in coaches.
viii. Use of different level of protection in the form of fuses,
Miniature Circuit breaker (MCBs) and Motor protection Circuit
Breakers (MPCBs) in the electrical circuits to prevent the
damage from electrical faults/surges.
ix. Provision of Aerosol based fire suppression system in electrical
cabinets.
x. Further, up-gradation of material in line with global standards
is regularly being carried out with fitment of new generation
material in Amrit Bharat & Vande Bharat Sleeper trains.
xi. Display of "Fire Notices" for widespread information in all
--12/--12-
coaches to inform and alert passengers regarding various
“Do’s” and “Don’ts” to prevent fire. These include messages
regarding not to carry any inflammable material, explosives,
prohibition of smoking inside the coaches and penalties etc.
xii. Prohibition of flame based cooking in coaches.
Regular maintenance of various fire safety
equipments/components as per the prescribed periodicity is
carried out by the designated officials at Depots/Sheds for
ensuring their proper upkeep.
(e) & (f): All Unmanned Level Crossings (UMLCs) on running lines of
Broad Guage (BG) network of Indian Railway including the state of
Rajasthan have been eliminated by 31.01.2019.
Elimination of level crossings (LCs) is a continuous and dynamic
process of Indian Railway. Such works are taken up on the basis of
its impact on safety in train operations, mobility of trains & impact
for road users and feasibility etc.
Nos. of ROBs/ RUBs constructed on Indian Railways during the
period 2004-14 vis a vis 2014-25 (Dec’25) is as under:
Period ROBs/ RUBs constructed
2004-14 4,148 Nos.
2014-25 13,882 Nos.
(Dec’25)
*****