**Executive Summary** This document is a response to Unstarred Question No. 1673 in the Lok Sabha regarding road construction under Pradhan Mantri Gram Sadak Yojana (PMGSY) in the Dahod Lok Sabha Constituency. It outlines the approval of PMGSY Phase IV in September 2024, aiming to provide all-weather connectivity to unconnected habitations. The deadline for completion of PMGSY-IV is March 2029. **Key Points / Main Content** * **PMGSY Phase IV:** * Approved in September 2024. * Aims to provide all-weather connectivity to 25,000 unconnected habitations. * Population criteria: 500+ in plains, 250+ in NE & Hill States/UTs, special category areas, and 100+ in LWE affected districts (as per Census 2011). * Completion timeline: March 2029. * Proposals scrutinized by the Ministry in Pre-Empowered and Empowered Committee meetings before being submitted to the Minister of Rural Development. * **Dahod Lok Sabha Constituency (Gujarat):** * No proposal received yet from the State for sanction under PMGSY-IV. * Detailed Project Reports (DPRs) for the state under PMGSY-IV are at the scrutiny stage with State Technical Agency (STA). * Survey of habitations conducted in Gujarat for the DahodLokSabha constituency under PMGSY-IV with a grand total of 1812 habitations surveyed, 1725 unconnected habitations approved by State, 1058 eligible habitations, 782 verified habitations, and 276 pending verification. * **PMGSY Phase III:** * Launched in 2019 for consolidation of the existing rural road network by upgrading existing Through Routes and Major Rural Links. * Focuses on connecting habitations to Gramin Agricultural Markets, Higher Secondary Schools, and Hospitals. * 298 roads (2,955.87 km) and 191 bridges were sanctioned to Gujarat under PMGSY-III. * Specifically for Dahod district, 13 roads (161.48 km) and 9 bridges were sanctioned. * 11 roads (96.96 km) and 1 bridge were sanctioned for the Mahisagar district. * **Impact Assessment (PMGSY-III):** * No specific assessment has been conducted on the impact of PMGSY-III in respect of DahodLokSabha Constituency. * Independent evaluation studies by NITI Aayog, IIM-Ahmedabad, and the World Bank indicate positive impacts on education, access to healthcare, employment, and farm prices. **Impact Analysis** **Government of India (Ministry of Rural Development)** * **Impact:** Responsible for scrutinizing proposals, sanctioning projects under PMGSY-IV, and overseeing the implementation. * **Action Required:** Continue scrutinizing DPRs from Gujarat and other states, and process them for sanctioning if requirements are met. **State Government of Gujarat** * **Impact:** Responsible for submitting proposals for PMGSY-IV and ensuring the DPRs meet the required standards. * **Action Required:** Expedite the submission of proposals for DahodLokSabha Constituency under PMGSY-IV. **Residents of Dahod Lok Sabha Constituency** * **Impact:** Potentially benefit from improved road connectivity to schools, healthcare facilities, and markets through PMGSY-IV. * **Action Required:** No immediate action required, but should engage with local representatives and authorities to voice their needs for road connectivity. **Districts of Dahod and Mahisagar** * **Impact:** Districts may experience infrastructure development and connectivity improvements as part of the PMGSY program. * **Action Required:** Follow through with local authorities to understand timelines and plans for infrastructure development in the area.

Key Entities Referenced

Pradhan Mantri Gram Sadak Yojana (PMGSY): A rural road construction scheme aimed at providing all-weather connectivity to unconnected habitations in India. Ministry of Rural Development: The central ministry responsible for overseeing and implementing rural development programs, including PMGSY. Dahod Lok Sabha Constituency: The specific geographic area (parliamentary constituency) whose unconnected habitations and impact of PMGSY are being addressed.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RURAL DEVELOPMENT DEPARTMENT OF RURAL DEVELOPMENT LOK SABHA UNSTARRED QUESTION NO. 1673 ANSWERED ON 10/02/2026 UNCONNECTED HABITATIONS UNDER PMGSY 1673. Shri JaswantsinhSumanbhaiBhabhor: Will the Minister of RURAL DEVELOPMENTbe pleased to state: (a) the number of unconnected habitations in the DahodLokSabha Constituency have beensanctioned for road construction under Pradhan Mantri Gram SadakYojana (PMGSY), Phase-IV;and (b) whether any specific assessment been conducted on the impact of PMGSY-III in improvingaccess to schools and health centres in the remote and hilly areas of DahodLokSabhaConstituency? ANSWER MINISTER OF STATE IN THE MINISTRY OF RURAL DEVELOPMENT (SHRI KAMLESH PASWAN) (a): The Government of India has approved Phase IV of Pradhan Mantri Gram SadakYojan (PMGSY) in September 2024 to provide all- weather connectivity to 25,000 unconnected habitations of population size 500+ in plains, 250+ in NE & Hill Sates/UTs, special category areas (Tribal Schedule V, Aspirational Districts/Blocks, Desert areas) and 100+ in LWE affected districts, as per Census 2011. The timeline for completion of PMGSY-IV is March 2029. The proposals received from the States are scrutinized by the Ministry in the Pre-Empowered and Empowered Committee meetings. The recommendations of the Empowered Committee are submitted to the Minister of Rural Development and in case the proposals meet the programme requirements, the same is sanctioned for the State. As far as DahodLokSabha Constituency in Gujarat is concerned, no proposal has been received yet from the State for sanction under PMGSY-IV. The Detailed Project Reports (DPRs) for the state under PMGSY-IV are at scrutiny stage with Page 1 of 2State Technical Agency (STA). The details of survey of habitations conducted in Gujarat for the DahodLokSabha constituency under PMGSY-IV are as under:- Districts of Total Unconnected Eligible Verified Pending DahodLokSabha Survey habitations habitation by Verification Constituency approved by NRIDA State Dahod 1381 1310 950 682 268 Mahisagar 431 415 108 100 8 Grand Total 1812 1725 1058 782 276 (b): PMGSY-III was launched in 2019 for consolidation of the existing rural road network by upgradation of existing Through Routes and Major Rural Links that connect habitations, inter-alia, to Gramin Agricultural Markets (GrAMs), Higher Secondary Schools and Hospitals. The program focused on upgradation of existing Through Routes and Major Rural Links based on priority giving importance to critical facilities like the rural markets, education & health facilities. Under PMGSY-III, 298 roads covering a length of 2,955.87 km and 191 bridges were sanctioned to the State of Gujarat. Out of which, 13 roads covering a length of 161.48 km and 9 bridges were sanctioned for Dahod district and 11 roads covering a length of 96.96 km and 1 bridge were sanctioned for the Mahisagar district. No specific assessment has been conducted on the impact of PMGSY-III in respect of DahodLokSabha Constituency. However, various independent evaluation studies conducted by NITI Aayog, Indian Institute of Management, Ahmedabad (IIM-A), and World Bank for PMGSY have concluded that it has had positive impact on education, access to health care facilities, employment generation, better farm prices and so on. PMGSY has provided new opportunities of employment such as in nearby urban areas where people can commute daily. ***** Page 2 of 2