Parliament Question: Upgradation of Kolkata Metro Station

Issued by RAILWAYS · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** This document is a response to a parliamentary question (No. 2017) regarding the upgrade of the Kolkata Metro's air-conditioning and ventilation systems, set to be answered on February 11, 2026. The upgrade, sanctioned at Rs. 1,201 Crores, aims to modernize the metro's environmental control and ventilation infrastructure to meet contemporary standards. Implementation will be planned meticulously to minimize service disruptions. The document further details the current status of ongoing metro corridor constructions around Kolkata, highlighting issues causing delays. **Key Points / Main Content** * **Upgradation Project:** * Rs. 1,201 Crores have been sanctioned for the project. * Includes state-of-the-art Tunnel Ventilation System, Environment Control System, and related Power Supply Systems. * Aims to provide better passenger comfort and energy efficiency. * Will replace water-cooled chillers with air-cooled chillers, saving 18 Cr liters of water annually. * **Kolkata Metro History:** * The first underground section opened in 1984. * Original ECS and ventilation were designed for lower temperatures, non-AC trains, and lower ridership. * **Ongoing Construction Projects:** * 52 km of metro corridors are under construction. * 20 km are held up due to land acquisition and utility shifting issues. * *Joka - Esplanade (14 km)*: Majerhat-Esplanade (6.26 km) affected due to land acquisition. * *New Garia - Dum Dum Airport (32 km)*: Belaghata-Dum Dum Airport (22.2 km) affected due to land acquisition. * *Noapara - Barasat (18 km)*: Jai Hind Airport-Michael Nagar is in progress. New Barrackpore-Barasat (7.5 km) is held up due to land acquisition and encroachment issues. * *Baranagar - Dakshineshwar (14.5 km)*: Baranagar-Barrackpore (12.5 km) is held up due to pending utility shifting. * **Specific Issues Causing Delays:** * Khidderpur Metro Station: Land required for utility shifting and road traffic diversion, pending since 2020, was only approved in July 2025. * Dr. B.C. Roy Market: Temporary shifting of unauthorized shops required for Esplanade Metro Station, NOC pending since February 2022. * Chingrighata Crossing: Temporary traffic diversion requires NOC pending for about 10 months as of the document's writing. * New Barrackpore to Barasat: Land acquisition and removal of heavy encroachments are unresolved. * Baranagar to Barrackpore: NOC for pipeline shifting is still awaited from the Government of West Bengal. **Impact Analysis** **Stakeholder: Commuters** * **Impact**: Upgraded systems will improve comfort, safety, and environmental standards. There is a potential for service disruptions during the upgrade implementation. * **Action Required**: Be aware of potential service disruptions and follow advisories. **Stakeholder: Government of West Bengal** * **Impact**: Necessary land acquisition, utility shifting, and approvals (NOC) are pending, causing delays to the metro projects. * **Action Required**: Expedite pending land acquisition, utility shifting, and issue necessary approvals (NOC) for the various metro projects. **Stakeholder: Kolkata Metro Railway** * **Impact**: Responsible for implementing the upgrade and managing potential service disruptions. The upgrade requires state government support. * **Action Required**: Meticulously plan the upgrade to minimize service disruptions. Regular follow up with State PWD and other relevant departments regarding utility shifting and land acquisition.

Key Entities Referenced

Kolkata Metro: India's oldest metro system undergoing a major upgradation of its air-conditioning and ventilation systems on the Blue Line. Ministry of Railways: The central ministry responsible for addressing the upgradation of the Kolkata Metro. West Bengal: The state where land acquisition and utility shifting issues are impacting the progress of the Kolkata Metro expansion. Lok Sabha: Parliamentary house where the unstarred question regarding the Kolkata Metro upgradation was raised.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO. 2017 TO BE ANSWERED ON 11.02.2026 UPGRADATION OF KOLKATA METRO STATION 2017. SHRI JAGANNATH SARKAR: Will the Minister of RAILWAYS be pleased to state: (a) whether the Government is aware that the air-conditioning and ventilation systems of the Kolkata Metro’s Blue Line underground stations, installed over 40 years ago, are undergoing a major upgradation and if so, the details thereof; (b) whether the Government plans to sanction Rs. 500 crores for the said upgradation project and if so, the details thereof; (c) the details of the proposed works including the replacement of water- cooled chillers with air-cooled chillers, expected savings in groundwater and overall project timelines; and (d) whether the commuters are likely to face service disruptions during the implementation period and if so, the details thereof and the steps being taken by the Government to minimize inconvenience? ANSWER MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND ELECTRONICS & INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW) (a) to (d): The Kolkata Metro, India’s oldest metro system, opened its first underground section in 1984. The original Environmental Control System (ECS) and ventilation were designed considering lower ambient temperatures, non-AC trains, and lower ridership. After more than four decades of service to the nation, its environmental control and ventilation infrastructure including air-conditioning, tunnel airflow systems, and smoke extraction mechanisms is being significantly modernized to meet contemporary comfort, safety, and environmental standards. Contd.2/.. §-2- The up-gradation works have been sanctioned at a total cost of Rs.1,201 Crores, which includes state-of-art system of Tunnel Ventilation System, Environment Control (commonly known as Air-conditioning System) System along with its related Power Supply Systems and other Electrical works. It will provide better passenger comfort by cooler, better-ventilated platforms and tunnel environments, at the same time will be energy-efficient. Modern tunnel ventilation will enhance safety by smoke control and safe passenger evacuation. For cooling fifteen stations of blue line, Kolkata Metro Railway uses 18 Cr liters of water annually for the use of water-cooled chillers. After installation of air-cooled chillers, this water will be saved. Implementation of the up-gradation work is planned meticulously, to avoid service disruptions and minimize inconvenience to the passengers. Metro project in Kolkata started in 1972. The details of the Metro commissioned since then are as under: Period Metro Commissioned 1972 to 2014 (42 years) 28 km 2014 to 2025 (11 years) 45 km Presently, 4 metro corridors of total 52 km are under construction in and around Kolkata out of which 20 km is held up due to land acquisition and utility shifting issues pertaining to State Government. The status of these corridors is as given below: Contd.3/..-3- (i) Joka - Esplanade (14 km):- Joka - Majerhat (7.74 km) has been commissioned and balance work from Majerhat to Esplanade (6.26 km) has been taken up. However, progress of the work is affected due to the following issues: SN Location Issues 1. Khidderpur  For utility shifting and road traffic diversion, 837 Metro sqm permanent and 1,702 sqm temporary land of Station State Government (Kolkata Armed Police) is required. The proposal of this land was sent to State Government on 24.08.2020.  Several meetings were held with officials of Government of West Bengal (GoWB) for transfer of above land.  After lot of persuasion, State Government finally accorded approval in July 2025 only after almost 5 years. 2. Dr. B.C.  For construction of Esplanade Metro Station, Roy Market temporary shifting of unauthorised 528 Shops at B.C. Roy Market on Defence land is required.  The proposal for NOC of temporary/permanent shifting of these shops was submitted to State Government in February 2022. Shops for temporary shifting of these unauthorized shops have also been constructed by Railway.  The State Government has been requested to facilitate shifting. Regular follow up with State PWD is also being done.  Issue is pending for more than 3.5 years. Contd.4/..-4- (ii) New Garia - Dum Dum Airport (32 km): New Garia - Belaghata (9.8 km) has been commissioned and balance work from Belaghata to Dum Dum Airport (22.2 km) has been taken up. However, progress of the work is affected due to the following issues: SN Location Issues 1. Chingrighata  Temporary traffic diversion at Chingrighata Crossing crossing for launching of viaduct segments (Between is required for 3 nights each on either side Beleghata – of the road (8 hours on every night). Gour Kishore  The proposal was submitted to Government Ghosh stations) of West Bengal (GoWB) in December 2024.  The diversion road as desired by Kolkata traffic police has already been constructed in February 2025.  Since then, several meetings have been held with various State Government and Kolkata police officials for NOC.  The NOC is still awaited even after about 10 months. (iii) Noapara - Barasat (18 km): Noapara - Jai Hind Airport (6.77 km) has been commissioned and work from Jai Hind Airport to Michael Nagar is in progress. However, work from New Barrackpore to Barasat (7.5 km) is held up due to land acquisition and encroachment issues by State authorities. Contd.5/..-5- SN Location Issues 1. New  Land acquisition (23,000 sq. m) and Barrackpore to removal of heavy encroachments (1277 Barasat hutments, 764 shops) are involved in this section.  The matter is not yet resolved by GoWB. (iv) Baranagar - Barrackpore - Dakshineshwar (14.5 km): Baranagar - Dakshineshwar (2 km) has been commissioned and balance work from Baranagar to Barrackpore (12.5 km) is held up due to pending utility shifting in the alignment by state government authorities. The details are as below: SN Location Issues 1. Baranagar  The original alignment along the B.T road was to agreed in 2011 as per MoU among Metro Barrackpore Railway, RVNL and Kolkata Municipal Corporation.  As per MoU, existing pipeline was to be replaced by new 64 inch diameter pipeline by the State Government.  Shifting of this pipeline was completed in 2012.  However, NOC is still awaited from Government of West Bengal. *****