See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 4172
TO BE ANSWERED ON 18.03.2026
UPGRADATION OF PASSENGER SAFETY MEASURES
4172. SHRI ARVIND GANPAT SAWANT:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the modernisation initiative has been planned to upgrade
passenger safety measures in the country particularly signalling
systems and station infrastructure and if so, the details thereof;
(b) whether the Government is enhancing the capacity of dedicated freight
corridors to meet growing industry demand and reduce congestion on
passenger routes and if so, the details thereof; and
(c) whether new express/semi–high-speed trains introduced/being
introduced on high-demand routes to improve connectivity and travel
efficiency and if so, the details thereof?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (c): Safety is accorded the highest priority on Indian Railways. As a
consequence of various safety measures taken over the years, there has
been a steep decline in the number of accidents.
Number of Consequential Train Accidents has reduced as shown in the
table below:-
Year Consequential Accidents
2014-15 135
2025-26 (upto 28.02.2026) 14 (90% lesser)
§Another important index showing improvement in safety in train operations
is Consequential Accident Index, the details of which are as under:-
Consequential Accident Index:-
Year Accident Index
2014-15 0.11
2024-25 0.03 (73% lesser)
This index measures number of consequential accidents as a ratio of total
running kilometers of all trains.
Accident Index =
234
165
135
55
31
14
2005-06 2009-10 2014-15 2019-20 2024-25 2025-26
(Feb 2026)
The various safety measures taken to enhance safety in train
operations are as under:-
1. On Indian Railways, the expenditure on Safety related activities has
increased over the years as under:-
stnediccA
niarT
laitneuqesnoC
fo
.oN
No. of consequential accidents
No. of trains X million kilometers runExpenditure/Budget on Safety related activities (Rs. in Cr.)
2013-14 2022-23 2023-24 2024-25 2025-26 2026-27
39,200 87,336 1,01,662 1,14,022 1,17,693 1,20,389
2. Electrical/Electronic Interlocking Systems with centralized operation of
points and signals have been provided at 6,665 stations up to
28.02.2026 to reduce accidents due to human failure.
3. Interlocking of Level Crossing (LC) Gates has been provided at 10,153
Level Crossing Gates up to 28.02.2026 for enhancing safety at LC Gates.
4. Complete Track Circuiting of stations to enhance safety by verification
of track occupancy by electrical means has been provided at 6,669
stations up to 28.02.2026.
5. Detailed instructions on issues related with safety of Signalling, e.g.
mandatory correspondence check, alteration work protocol, preparation
of completion drawing, etc. have been issued.
6. System of disconnection and reconnection for S&T equipment as per
protocol has been re-emphasized.
7. All locomotives are equipped with Vigilance Control Devices (VCD) to
improve alertness of Loco Pilots.
8. Retro-reflective sigma boards are provided on the mast which is located
two OHE masts prior to the signals in electrified territories to alert the
crew about the signal ahead when visibility is low due to foggy weather.
9. A GPS based Fog Safety Device (FSD) is provided to loco pilots in fog
affected areas which enables loco pilots to know the distance of the
approaching landmarks like signals, level crossing gates, etc.
10. Modern track structure consisting of 60kg, 90 Ultimate Tensile Strength
(UTS) rails, Prestressed Concrete Sleeper (PSC) Normal/Wide base
sleepers with elastic fastening, fan shaped layout turnout on PSCsleepers, Steel Channel/H-beam Sleepers on girder bridges is used while
carrying out primary track renewals.
11. Mechanisation of track laying activity through use of track machines
like PQRS, TRT, T-28 etc. to reduce human errors.
12. Maximizing supply of 130m/260m long rail panels for increasing
progress of rail renewal and avoiding welding of joints, thereby
improving safety.
13. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws and
timely removal of defective rails.
14. Laying of longer rails, minimizing the use of Alumino Thermic Welding
and adoption of better welding technology for rails i.e., Flash Butt
Welding.
15. Monitoring of track geometry by OMS (Oscillation Monitoring System)
and TRC (Track Recording Cars).
16. Patrolling of railway tracks to look out for weld/rail fractures.
17. The use of Thick Web Switches and Weldable CMS Crossing in turnout
renewal works.
18. Inspections at regular intervals are carried out to monitor and educate
staff for observance of safe practices.
19. Web based online monitoring system of track assets viz. Track database
and decision support system has been adopted to decide rationalized
maintenance requirement and optimize inputs.
20. Detailed instructions on issues related with safety of Track, e.g.
integrated block, corridor block, worksite safety, monsoon precautions,
etc. have been issued.
21. Preventive maintenance of railway assets (Coaches & Wagons) is
undertaken to ensure safe train operations.
22. Replacement of conventional ICF design coaches with LHB design
coaches is being done.23. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route have
been eliminated by January 2019.
24. Safety of Railway Bridges is ensured through regular inspection of
Bridges. The requirement of repair/rehabilitation of Bridges is taken up
based upon the conditions assessed during these inspections.
25. Indian Railways has displayed Statutory “Fire Notices” for widespread
passenger information in all coaches. Fire posters are provided in every
coach so as to educate and alert passengers regarding various Do’s and
Don’ts to prevent fire. These include messages regarding not carrying
any inflammable material, explosives, prohibition of smoking inside the
coaches, penalties etc.
26. Production Units are providing Fire detection and suppression system in
newly manufactured Power Cars and Pantry Cars, Fire and Smoke
detection system in newly manufactured coaches. Progressive fitment
of the same in existing coaches is also underway by Zonal Railways in a
phased manner.
27. Regular counselling and training of staff is undertaken.
28. Concept of Rolling Block introduced in Indian Railways (Open Lines)
General Rules vide Gazette notification dated 30.11.2023, wherein work
of integrated maintenance/ repair/replacement of assets is planned up
to 52 weeks in advance on rolling basis and executed as per plan.
The details of the Safety related works related to better maintenance
practices, Technological improvements, better infrastructure and rolling
stock etc. undertaken by Railways are tabulated below:-
2004-05 to 2014-15 to 2024- 2014-25 Vs.
S.N. Item
2013-14 25 2004-14
Technological Improvements
1. Use of high-quality 57,450 Km 1.43 Lakh Km More than 2
rails times
(60 Kg) (Km)2. Longer Rail Panels 9,917 Km 77,522 Km Nearly 8
(260m) (Km) times
3. Electronic 837 3,691 Stations More than 4
Interlocking (Stations) Stations times
4. Fog Pass Safety As on As on 31.03.25: 288 times
Devices (Nos.) 31.03.14: 25,939 Nos.
90 Nos.
5. Thick Web Switches Nil 28,301 Nos.
(Nos.)
Better Maintenance Practices
1. Primary Rail Renewal 32,260 Km 49,941 Km 1.5 times
(Track Km)
2. USFD (Ultra Sonic 79.43 Lakh 2 Crore More than 2
Flaw detection) times
Testing of Welds
(Nos.)
3. Weld failures (Nos.) In 2013-14: In 2024-25: 90 %
3699 Nos. 370 Nos. reduction
4. Rail fractures (Nos.) In 2013-14: In 2024-25: More than
2548 Nos. 289 Nos. 88%
reduction
Better Infrastructure and Rolling stock
1. New Track KM added 14,985 Km 34,428 Km More than 2
(Track Km) times
2. Flyovers 4,148 Nos. 13,808 Nos. More than 3
(RoBs)/Underpasses times
(RUBs) (Nos.)
3. Unmanned Level As on As on Removed
crossings 31.03.14: 31.03.24:Nil
(Nos.) on BG 8,948 (All eliminated by
31.01.19)
4. Manufacture of LHB 2,337 Nos. 42,677 More than
Coaches (Nos.) 18 times
Implementation of Kavach:
1. Kavach is an indigenously developed Automatic Train Protection (ATP)
system. Kavach is a highly technology intensive system, which requires
safety certification of highest order (SIL-4).2. Kavach aids the Loco Pilot in running of trains within specified speed
limits by automatic application of brakes in case Loco Pilot fails to do
so and also helps the trains to run safely during inclement weather.
3. The first field trials on the passenger trains were started in February
2016. Based on the experience gained and Independent Safety
Assessment of the system by Independent Safety Assessor (ISA), three
firms were approved in 2018-19, for supply of Kavach Ver 3.2.
4. Kavach was adopted as National ATP system in July, 2020.
5. Implementation of Kavach System involves following Key Activities:
a. Installation of Station Kavach at each and every station, block
section.
b. Installation of RFID Tags throughout the track length.
c. Installation of telecom Towers throughout the section.
d. Laying of Optical Fibre Cable along the track.
e. Provision of Loco Kavach on each and every Locomotive running on
Indian Railways.
6. Based on deployment of Kavach version 3.2 on 1465 RKm on South
Central Railway and experience gained, further improvements were
made. Finally, Kavach specification version 4.0 was approved by RDSO
on 16.07.2024.
7. Kavach version 4.0 covers all the major features required for the diverse
railway network. This is a significant milestone in safety for Indian
Railways. Within a short period, IR has developed, tested and started
deploying Automatic Train Protection System.
8. Major improvement in Version 4.0 includes increased Location
Accuracy, Improved Information of Signal Aspects in bigger yards,
Station to Station Kavach interface on OFC and Direct Interface toexisting Electronic Interlocking System. With these improvements,
Kavach Ver.4.0. is planned for large scale deployment over Indian
Railways.
9. After extensive and elaborate trials, Kavach Version 4.0 has been
successfully commissioned on 1452 Route Kilometres, covering the high
density Delhi- Mumbai and Delhi-Howrah routes as below:
SN Section Progress (Route Km)
(1) Delhi-Mumbai route:
i Junction cabin – Palwal – Mathura – 667
Nagda section
ii Vadodara - Ahmedabad section 96
iii Vadodara - Virar section 336
(2) Delhi – Howrah route:
i Gaya Sarmatanr section 93
ii Chota Ambana - Bardhaman – 260
Howrah section
10. Further, track side Kavach implementation work has been taken up
on 24,427 RKM covering all GQ,GD,HDN and identified sections of Indian
Railways.
11. Progress of key items of Kavach on High density routes including
Delhi– Mumbai & Delhi– Howrah corridors as on 14.03.2026 are as under:
SN Item Progress
i Laying of Optical Fibre Cable 8570 Km
ii Installation of Telecom Towers 1100 nos
iii Station Data Centre 767 station
iv Installation of Track side equipment 6776 RKm
v Provision of Kavach in Loco 4211 nos12. The sections mentioned above also includes sections which pass
through states of Andhra Pradesh, Maharashtra & Madhya Pradesh.
13. In addition, work for installation of Kavach in 8979 Locomotives and
1200 EMU/MEMU has been taken up.
14. Specialized training programmes on Kavach are being conducted at
centralized training institutes of Indian Railways to impart training to all
concerned officials. By now more than 55,000 technicians, operators and
engineers have been trained on Kavach technology. This includes about
47,500 Loco Pilots & Assistant Loco Pilots. Courses have been designed
in collaboration with IRISET.
15. The cost for provision of Track Side including Station equipment of
Kavach is approximately Rs. 50 Lakhs/Km and cost for provision of
Kavach equipment on locomotives is approximately Rs. 80 Lakh/Loco.
16. The funds utilized on Kavach works so far up to Feb'26 is Rs. 2,763.90
Crores. The allocation of funds during the year 2025-26 is Rs. 1673.19
Crores. Requisite funds are made available as per the progress of works.
Amrit Bharat Station Scheme:
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their
implementation in phases to improve the stations. The master
planning includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building Improvement of waiting halls, toilets, sitting arrangement, water
booths
Provision of wider foot over bridge/air concourse commensurate
with passenger traffic
Provision of lift/escalators/ramp
Improvement /Provision of platform surface and cover over
platforms
Provision of kiosks for local products through schemes like ‘One
Station One Product’
Parking areas, Multimodal integration
Amenities for Divyangjans
Better passenger information systems
Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity at each
station.
The scheme also envisages sustainable and environment friendly
solutions, provision of ballastless tracks etc. as per necessity,
phasing and feasibility and creation of city centre at the station in
the long term.
So far, 1,338 stations have been identified for development under the
Amrit Bharat Station Scheme.
Completed stations:
Development works at railway stations under Amrit Bharat Station
Scheme have been taken up at a good pace. Till now, works have
been completed at 180 stations. Names of stations completed so far
are as following:Alnavar, Amb Andaura, Ambikapur, Amgaon, Anandpur Sahib, Anara,
Angamali For Kaladi, Ayodhya Dham, Badami, Bagalkot, Baijnath
Paprola, Balrampur, Bantawala, Barabhum, Baramati, Bareilly City,
Baripada, Barmer, Barpali, Begumpet, Beohari, Bhanupratappur,
Bhilai, Bhind, Bijnor, Bimalgarh, Bommidi, Bundi, Chanda Fort,
Chalakudi, Changanassery, Chennai Park,Chhindwara, Chidambaram,
Chinchpokli, Chinna Salem, Chirayinkeezh, Cuttack, Dakor, Derol,
Deshnoke, Devlali, Dharwad, Dhule, Dongargarh, Fatehabad,
Fatehpur, Fatehpur Shekhawati, Ferok, Gadag, Gangapur City, Godda,
Godhra Jn., Gogameri, Gokak Road, Gola Gokarnath, Gomti Nagar,
Govardhan, Govind Garh, Govindpuri, Govindpur Road, Hafizpeta,
Haibargaon, Haldia, Hapa, Harpalpur, Hathras City, Hodal, Idgah Agra
Jn., Izzatnagar, Jaisalmer, Jam Jodhpur, Jam Wanthali, Joychandi
Pahar,Junnor Deo, Kakinada Town, Kalyani Ghoshpara,
Kamakhyaguri, Kanalus Jn., Karaikkudi Jn., Karamsad, Karimnagar,
Katni South, Kedgaon, Khairthal, Khambhaliya, Khalilabad, Koppal,
Kosamba Jn., Kulitturai, Kuttipuram, Lasalgaon, Limbdi, Lohardaga,
Lonand Jn., Mahe, Mahuva, Mailani, Mandal Garh, MandawarMahwa
Road, Madhupur, Mambalam, Manaparai, Mandi Dabwali, Mangalagiri,
Mannargudi, Matunga, M.C.S. Chhatarpur, Mithapur, Morappur, Morbi,
Muktsar, Munirabad, Muri Jn., Murtizapur Jn., Nainpur Jn., Nandura,
Narmadapuram (Hoshangabad), Netaji Subhash Chandra Bose Itwari
Junction, Nidadavolu Jn., Nilambur Road, Okha, Orchha, Palitana,
Panagarh, Panki Dham, Parel, Parlakhemundi, Pirpainti, Piska,
Pokhrayan, Pollachi Jn., Polur, Porbandar, Rajgarh, Rajmahal, Rajula
Jn., Ramagundam, Ramghat Halt, Rayanpadu, Saharanpur Jn.,
Sahibzada Ajit Singh Mohali, Sahebgunj, Samakhiyali, Samalpatti,
Sanchi, Sankarpur, Savda, Seoni, Shahad, Shajapur, Sholavandan,
Shoranur Jn., Shridham, Siddharth Nagar, Sihor Jn., Siuri, Sri Bala
Brahmeswara Jogulamba, Srirangam, Srivilliputtur, St.Thomas Mount,Sullurpeta, Suraimanpur, Swaminarayan Chappia, Talcher, Tamluk,
Thawe, Thiruvarur Jn., Tiruvannamalai, Tripunithura, Tuni, Ujhani,
Urkura, Utran, Vadakara, Vadala Road, Vidisha,Vriddhachalam Jn.,
Wadakancheri, Warangal.
The activities for development at other stations have also been taken
up at good pace and progress of some of the above stations is as
given below:
• Tirupati station: The structural framework of new second entry
station building on South side, 2 nos. air concourses and sewage
treatment plant have been completed. The finishing works of new
second entry station building on South side and air concourses,
structural work of station building on North side, platform shelter,
lift, escalator etc. have been taken up.
• Nellore station: The structural framework, brickwork and
plastering of station building on both East and West sides have been
completed. The finishing works of station building on both East and
West side and air concourse, extension work of subway, parking,
water tanks and sewage treatment plant have been taken up.
• Bangalore Cantonment station: The works of diversion road on
South side, training centre, hostel on North side, electric substation
building have been completed. The works of South side station
building, North side station building, circulating area and Foot Over
Bridge have been taken up.
• Kota Junction station: The structural works of front departure
hall, front arrival hall and rear side station building have been
completed. The finishing works of front departure hall, rear sidestation building, air concourse, through roof, circulating area have
been taken up.
• Bhubaneshwar station: The structural work of new station building
at East and West side and air concourse have been completed. The
structural work of elevated driveway at East and West side station,
extension of Foot Over Bridge and platform shelter have been taken
up. The finishing works of new station building at East and West side,
works of MEP (Mechanical, Electrical and Plumbing), HVAC (Heating,
Ventilation and Air Conditioning) and escalators have been taken up.
Further, development / redevelopment / upgradation / modernisation
of stations on Indian Railways is a continuous and ongoing process
and works in this regard are undertaken as per requirement, subject
to inter-se priority and availability of funds. Development /
redevelopment / upgradation / modernisation of a station is carried
out based on category of station/condition/traffic handled etc.
Development / Upgradation of railway stations is complex in nature
involving safety of passengers & trains and requires various
statutory clearances such as fire clearance, heritage, tree cutting,
airport clearance etc. The progress also gets affected due to
brownfield related challenges such as shifting of utilities (involving
water/sewage lines, optical fibre cables, gas pipe lines, power/signal
cables, etc.), infringements, operation of trains without hindering
passenger movement, speed restrictions due to works carried out in
close proximity of tracks and high voltage power lines, etc. and
these factors affect the completion time.
Further, development / upgradation / modernization of stations
including Amrit Bharat Station Scheme is generally funded underPlan Head–53 ‘Customer Amenities’. The details of allocation and
expenditure under Plan Head–53 are maintained Zonal Railway-wise
and not work-wise or station-wise or state-wise. The fund allocation
of ₹ 12,120 crore has been made for the financial year 2025-26 under
Plan Head–53 and expenditure (up to February, 2026) of ₹ 11,892
crore has been incurred so far.
Dedicated Freight Corridors
Ministry of Railways has taken up construction of two Dedicated
Freight Corridors (DFC) viz. Eastern Dedicated Freight Corridor
(EDFC) from Ludhiana to Sonnagar (1337 Km) and the Western
Dedicated Freight Corridor (WDFC) from Jawaharlal Nehru Port
Terminal (JNPT) to Dadri (1506 Km).
The work on EDFC has been completed and commissioned. In WDFC,
1404 RKm out of total 1506 RKm has been completed and
commissioned. The balance work on WDFC from Vaitarna-JNPT
section (102 Rkm) has been taken up.
DFC has contributed to creating additional paths on the conventional
network by diverting freight traffic to EDFC and WDFC. Presently, 443
average trains per day are being run on these corridors.
A New Dedicated Freight Corridor i.e., Dankuni - Surat, has been
announced by the Govt. of Bharat in the Budget 2026.The work of
preparation/updation of DPR for the DFC has been assigned to
DFCCIL. Alignment and Financing model are under finalisation.
Vande Bharat (Chair Car), Vande Bharat (Sleeper), Amrit Bharat
Trains, Namo Bharat Rapid RailIndian Railways (IR) constantly endeavours to augment the travelling
facilities for the passengers inter alia by introducing new train
services. Indian Railways, during the period during 2020-2021 to
2025-2026 (upto Feb, 2026), introduced 1078 new train services on
its network. These services include 158 Vande Bharat (Chair Car)
services, 02 Vande Bharat (Sleeper) services, 54 Amrit Bharat
services and 04 Namo Bharat Rapid Rail services.
Indian Railways, with a view to improve travel experience of the
passengers, have introduced indigenously designed and
manufactured Vande Bharat trains with modern coaches, advanced
safety features and passenger amenities. These new Vande Bharat
Chair Car Trains have the following features:
● Jerk Free Semi-Permanent couplers.
● Fitted with KAVACH
● Centrally controlled Automatic Plug Doors and Fully Sealed wider
gangways.
● Emergency Alarm Push buttons and Talk Back Units on all Coaches.
● Improved fire safety – Aerosol based fire detection and suppression
system in electrical cabinets and lavatories.
● Higher acceleration with design/operating speed of 180/160 KMPH.
● Driver-Guard communication with voice recording facility & Crash
hardened memory.
● Air conditioning units provided with indigenously developed UV-C
lamp based disinfection system for deactivating 99% harmful bacteria
from conditioned air to improve the hygiene standards inside the
passenger area.
● Better Ride Comfort.
● CCTVs in all Coaches.● For Divyangjan passengers special lavatory in the driving coaches on
each end.
● Coach condition monitoring System (CCMS) display with remote
monitoring
As on 12.03.2026, the following 162 Vande Bharat train services (Chair
Car) are being operated on the Indian Railways network.
SN Train No. and Name
1 22435/22436 New Delhi - Varanasi Vande Bharat Express
2 22439/22440 Sri Mata Vaishno Devi Katra - New Delhi Vande
Bharat Express
3 20901/20902 Gandhinagar Capital - Mumbai Central Vande
Bharat Express
4 22447/22448 Amb Andura - New Delhi Vande Bharat Express
5 20607/20608 Mysuru - MGR Chennai Central Vande Bharat
Express
6 20825/20826 Nagpur - Bilaspur Vande Bharat Express
7 22301/22302 New Jalpaiguri - Howrah Vande Bharat Express
8 20833/20834 Secunderabad - Visakhapatnam Vande Bharat
Express
9 22223/22224 Sainagar Shirdi - Chhatrapati Shivaji Maharaj (T)
Vande Bharat Express
10 22225/22226 Solapur - Chhatrapati Shivaji Maharaj (T) Vande
Bharat Express
11 20171/20172 Nizamuddin - Rani Kamlapati Vande Bharat
Express
12 20701/20702 Tirupati - Secunderabad Vande Bharat Express13 20643/20644 Coimbatore - Chennai Vande Bharat Express
14 20977/20978 Chandigarh - Ajmer Vande Bharat Express
15 20633/20634 Thiruvananthapuram- Kasargod Vande Bharat
Express
16 22895/22896 Puri - Howrah Vande Bharat Express
17 22457/22458 Dehradun - Anand Vihar Vande Bharat Express
18 22227/22228 Guwahati - New Jalpaiguri Vande Bharat Express
19 20911/20912 Nagpur - Indore Vande Bharat Express
20 22229/22230 Madgaon - Chhatrapati Shivaji Maharaj (T) Vande
Bharat Express
21 22349/22350 Ranchi - Patna Vande Bharat Express
22 20661/20662 Dharwar - Bengaluru Vande Bharat Express
23 20173/20174 Rewa - Rani Kamlapati Vande Bharat Express
24 22549/22550 Gorakhpur - Prayagraj Vande Bharat Express
25 12461/12462 Sabarmati - Jodhpur Vande Bharat Express
26 22925/22926 Okha - Ahmedabad Vande Bharat Express
27 20665/20666 Tirunelveli - Chennai Egmore Vande Bharat
Express
28 20677/20678 Narsapur - Chennai Vande Bharat Express
29 20703/20704 Yesvantpur - Kacheguda Vande Bharat Express
30 20631/20632 Thiruvananthapuram- Mangaluru Vande Bharat
Express
31 26963/26964 Udaipur - Asarva Vande Bharat Express
32 22347/22348 Patna - Howrah Vande Bharat Express
33 20835/20836 Puri - Rourkela Vande Bharat Express34 20897/20898 Ranchi - Howrah Vande Bharat Express
35 22415/22416 New Delhi - Varanasi Vande Bharat Express
36 20641/20642 Coimbatore - Bengaluru Cant Vande Bharat
Express
37 20645/20646 Mangaluru - Madgaon Vande Bharat Express
38 20705/20706 Chhatrapati Shivaji Maharaj (T) - Nanded Vande
Bharat Express
39 22477/22478 Sri Mata Vaishno Devi Katra - New Delhi Vande
Bharat Express
40 22425/22426 Anand Vihar - Ayodhya Cantt. Vande Bharat
Express
41 22487/22488 Amritsar - Delhi Vande Bharat Express
42 22962/22961 Mumbai Central - Ahmedabad Vande Bharat
Express
43 20707/20708 Visakhapatnam - Secunderabad Vande Bharat
Express
44 20663/20664 Chennai - Mysuru Vande Bharat Express
45 22233/22234 Patna - New Jalpaiguri Vande Bharat Express
46 22470/22469 Khajuraho - Nizamuddin Vande Bharat Express
47 22231/22232 Bengaluru - Kalburagi Vande Bharat Express
48 20841/20842 Visakhapatnam - Bhubaneswar Vande Bharat
Express
49 22345/22346 Gomti Nagar - Patna Vande Bharat Express
50 20887/20888 Varanasi - Ranchi Vande Bharat Express
51 22545/22546 Dehradun - Lucknow Jn Vande Bharat Express
52 22490/22489 Varanasi - Meerut City Vande Bharat Express53 20627/20628 Nagercoil - Chennai Egmore Vande Bharat
Express
54 20671/20672 Bengaluru Cantt - Madurai Vande Bharat Express
55 22500/22499 Deoghar - Varanasi Vande Bharat Express
56 22309/22310 Jamalpur - Howrah Vande Bharat Express
57 20871/20872 Rourkela - Howrah Vande Bharat Express
58 20893/20894 Patna - Tatanagar Vande Bharat Express
59 20892/20891 Tatanagar - Brahmapur Vande Bharat Express
60 22303/22304 Gaya - Howrah Vande Bharat Express
61 20669/20670 Pune - Hubballi Vande Bharat Express
62 20673/20674 Pune - Chhatrapati Shahu Maharaj (T) Vande
Bharat Express
63 20101/20102 Secunderabad - Nagpur Vande Bharat Express
64 20829/20830 Visakhapatnam - Durg Vande Bharat Express
65 21893/21894 Patna - Tatanagar Vande Bharat Express
66 21895/21896 Patna - Tatanagar Vande Bharat Express
67 20176/20175 Banaras - Agra Cantt. Vande Bharat Express
68 26901/26902 Veraval - Sabarmati Vande Bharat Express
69 26401/26402 Srinagar - Shri Mata Vaishno Devi Katra Vande
Bharat Express
70 26403/26404 Srinagar -Shri Mata Vaishno Devi Katra Vande
Bharat Express
71 26502/26501 Patliputra - Gorakhpur Vande Bharat Express
72 26751/26752 KSR Bengaluru - Belagavi Vande Bharat Express73 26406/26405 Amritsar - Shri Mata Vaishno Devi Katra Vande
Bharat Express
74 26101/26102 Pune - Ajni Vande Bharat Express
75 26302/26301 Jogbani - Danapur Vande Bharat Express
76 26481/26482 Delhi Cantt - Jodhpur Vande Bharat Express
77 26471/26472 Delhi Cantt - Bikaner Vande Bharat Express
78 26462/26461 Delhi - Firozpur Cantt. Vande Bharat Express
79 26651/26652 Ernakulam - KSR Bengaluru Vande Bharat
Express
80 26506/26505 Khajuraho - Banaras Vande Bharat Express
81 26504/26503 Saharanpur - Gomtinagar Vande Bharat Express
Further, to cater to long distance travel, IR has introduced the sleeper
variant of Vande Bharat Express. Presently, 2 Vande Bharat Sleeper
services are in operation on the Indian Railway network.
SN Train No. and Name
1 27575/27576 Howrah - Kamakhya Vande Bharat Sleeper
Express
Broad Technological advancements and safety features provided in the
Vande Bharat Sleeper Trains are as below:
● Jerk-Free Semi permanent couplers and Anti Climbers.
● Fitted with KAVACH.
● Higher acceleration with design/operating speed of 180/160 KMPH.
● Crashworthy Design of Car body complying with EN standards.
● Fire barrier doors at the end of each coach for compliance of Fire
Safety standards.● Aerosol based fire detection and suppression system in electrical
cabinets and lavatories.
● Regenerative braking system for energy efficiency.
● Air conditioning units provided with indigenously developed UV-C
lamp based disinfection system for deactivating 99% harmful bacteria
from conditioned air to improve the hygiene standards inside the
passenger area.
● Centrally controlled Automatic Plug Doors and Fully Sealed wider
gangways.
● CCTVs in all coaches.
● Emergency talk-back unit for communication between Passenger and
Train Manager/Loco Pilot in case of emergency.
● For Divyangjan passengers special lavatory in the driving coaches on
each end
● Centralized Coach Monitoring System for better condition monitoring
of passenger amenities such as Air conditioning, Saloon Lighting etc
● Ergonomically designed ladder for ease of climbing on to upper
berths.
Railways have developed fully non-AC modern train named as Amrit
Bharat express. Presently, 58 services are in operation. These modern
trains comprise of 11 General Class coaches, 8 Sleeper Class coaches,
01 Pantry car and 02 Luggage cum Divyangjan coaches.
SN Train No. and Name
1 11015/11016 Lokmanya Tilak (T) - Saharsa Amrit Bharat
Express
2 13697/13698 Gaya - Delhi Amrit Bharat Express
3 15293/15294 Muzaffarpur - Charlapalli Amrit Bharat Express4 15557/15558 Darbhanga - Anand Vihar (T) Amrit Bharat
Express
5 15561/15562 Darbhanga - Gomtinagar Amrit Bharat Express
6 15567/15568 Bapudham Motihari - Anand Vihar (T) Amrit
Bharat Express
7 22361/22362 Rajendranagar (T) - New Delhi Amrit Bharat
Express
8 13433/13434 SMVT Bengaluru - Malda Town Amrit Bharat
Express
9 13435/13436 Malda Town - Gomtinagar Amrit Bharat Express
10 15133/15134 Chhapra - Anand Vihar (T) Amrit Bharat Express
11 14047/14048 Sitamarhi - Delhi Amrit Bharat Express
12 14627/14628 Saharsa - Chheharta Amrit Bharat Express
13 19623/19624 Madar - Darbhanga Amrit Bharat Express
14 16601/16602 Erode - Jogbani Amrit Bharat Express
15 19021/19022 Udhna - Brahmapur Amrit Bharat Express
16 15671/15672 Kamakhya - Rohtak Amrit Bharat Express
17 20609/20610 New Jalpaiguri - Tiruchchirappalli Amrit Bharat
Express
18 16597/16598 SMVT Bengaluru - Alipurduar Amrit Bharat
Express
19 11031/11032 Panvel - Alipurduar Amrit Bharat Express
20 16107/16108 Tambaram - Santragachi Amrit Bharat Express
21 13065/13066 Howrah - Anand Vihar (T) Amrit Bharat Express
22 22587/22588 Sealdah - Banaras Amrit Bharat Express
23 20603/20604 New Jalpaiguri - Nagercoil Amrit Bharat Express
24 15949/15950 Dibrugarh - Gomti Nagar Amrit Bharat Express
25 16121/16122 Tambaram - Thiruvananthapuram Central Amrit
Bharat Express26 16329/16330 Nagercoil - Mangaluru Amrit Bharat Express
27 17041/17042 Charlapalli - Thiruvananthapuram North Amrit
Bharat Express
28 16619/16620 Podanur - Dhanbad Amrit Bharat Express
29 16357/16358 Nagercoil - Charlapalli Amrit Bharat Express
These trains have following enhanced features and amenities:
● Better aesthetics of seat and berths with enhanced look & feel on the
lines of Vande Bharat Sleeper.
● Jerk Free Semi-Automatic Couplers.
● Improved Crashworthiness in coaches by provision of crash tube.
● Provision of CCTV system in all coaches.
● Improved designs of toilets.
● Improved design of Ladder for ease of climbing on to the berth.
● Improved LED Light fitting & Charging Sockets.
● Provision of EP assisted braking system.
● Aerosol based fire suppression system in toilets and electrical
cubicles.
● USB Type-A and Type-C mobile charging sockets.
● Emergency Talk Back system for two-way communication between
Passenger and Guard/Train Manager.
● Non-AC pantry with enhanced heating capacity.
● Fully sealed gangways with quick release mechanism for easy
attachment and detachment.
Namo Bharat Rapid Rail has been introduced to enhance the travelling
experience of suburban and regional commuters for inter-city short
distance movement by harnessing the features of Vande Bharat Trains.Presently, 4 Namo Bharat Rapid Rail services are in operation on the
Indian Railway network.
SN Train Number and Name
1 94801/94802 Ahmedabad-Bhuj Namo Bharat Rapid Rail
2 94803/94804 Jaynagar-Patna Namo Bharat Rapid Rail
The prominent features of Namo Bharat Rapid Rail are as follows:
● Centrally controlled Double Leaf Automatic Sliding Doors.
● CCTVs for safety and passenger surveillance.
● Modular interior with Cushioned Seats and Sealed Flexible Gangway.
● Emergency Talk back System.
● Continuous LED lighting with Energy Efficient Lighting system.
*****