GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 6054
TO BE ANSWERED ON 01.04.2026
UPGRADATION OF RAILWAY MANNED LEVEL CROSSINGS
†6054. SHRI BHAUSAHEB RAJARAM WAKCHAURE:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Government has taken any steps to make all the railway
level crossings in the country manned and to equip all the railway
stations with Wi-Fi and if so, the details thereof; and
(b) the timeline by which all the railway level crossings in the country are
proposed to be upgraded to manned level crossings and all the railway
stations are to be equipped with Wi-Fi?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) and (b): As on 01.04.2025, there are 16,499 Nos. of manned Level
Crossings (MLCs) on Indian Railway. Further, all Unmanned level crossings
(UMLCs) on Broad Gauge (BG) network of Indian Railways have been
eliminated in 2019.
Level Crossings (LCs) are eliminated either by providing Road over
Bridges/ Road under Bridges (ROBs/ RUBs) in lieu of LCs or through direct
closure (for low traffic LCs) or by diversion of road traffic to nearby
ROB/RUB/LC depending upon the site conditions.
Sanctioning and execution of works of Road Over Bridges/ Road Under
Bridges (ROBs/RUBs) is a continuous and ongoing process on Indian
Railways. Such works are prioritized and taken up on the basis of its
impact on safety and mobility in train operations and impact on road users.
§ Page 1 of 2No. of ROBs/ RUBs constructed on Indian Railways during the period
2004-14 vis a vis 2014-26 (Upto Jan’26) is as under:
Period ROBs/ RUBs constructed
2004-14 4,148 Nos.
2014-26 (Upto Jan’26) 14,024 Nos.
As on 01.02.2026, 4,802 Nos. ROBs/ RUBs are sanctioned at a cost of
₹ 1,14,196 Cr on Indian Railways which are at various stages of planning
and execution.
Railways have taken following measures to expedite the progress of
work:
i. Joint survey with concerned State Govt./Road Owning Authority is
done before finalizing the General Arrangement Drawing (GAD) to
ensure smooth execution.
ii. Periodic meetings of Railway & State Government officials are done
to resolve various issues related to ROB/RUB works.
iii. Standardization of superstructure drawings for various combinations
of span, skewness and width of road on Railway portion has been
done to avoid delays during the design approval. This has been issued
in the form of compendium, which can be directly adopted for Road
Over Bridge across Railway lines for expeditious planning.
Almost all railway stations across Indian Railways have 4G/5G
coverage provided by the Telecom Service Providers. These networks are
also being utilized by passengers for data connectivity resulting in
enhanced passenger experience. Further, free Wi-Fi services have also
been provided at 6117 Railway Stations.
*****